All Signatures are Required PRIOR to Hot Work Start. Authorized Print NameSignatureDate Permit Holder Permit Issuer Chief Operator Fire Watch Job Hazards.

Slides:



Advertisements
Similar presentations
Brownfields the Need for Training. Steel Foundry Inc.
Advertisements

CLOW WATER Contractor Orientation April
KBR / ITI TOTAL SAFETY TASK INSTRUCTION Employee Involvement Given at Task Location Every Task Every Day Exact Location where work is done: ______________________________________________.
Welding, Cutting, and Brazing
SAFETY IN THE WORKPLACE Created by : Chelsea Leppanen.
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
Qualified Electrical Worker
_______________________________
Module 3: PPE 3.2 PPE Selection Susan Harwood Grant Number SH F-23.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
Personal Protective Equipment (PPE) Awareness Training S afety A wareness F or E veryone from Cove Risk Services.
Campus Safety Training
BLR’s Safety Training Presentations
Safe Chemical Handling
Hazard Communication Chemical Safety.
Brownfields Remediation Brief Overview. Examples of Course Topics  Standards  Toxicology  Chemistry  Respiratory Protection  PPE  Decon  Monitoring.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
“Incident Free Starts With ME”
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
Huntsman Site Specific Training By: Larry Medina.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
Safety Training Presentations
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
Hazard Communication 29 CFR Close Encounters with Chemicals We encounter chemicals almost every day –Filling your vehicle with gasoline –Cleaning.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
Confined Space Work Permit
Hot Work Permit  Meraux Refinery   Yes  N/A Meraux Refinery
Personal Protective Equipment Hazard Assessment This training program is designed to inform management of the requirements for conducting assessments of.
Work Permit  Meraux Refinery  Cold Work Low Energy  Yes  N/A
Hot Work Permit  Meraux Refinery   Yes  N/A Meraux Refinery
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical W Personal Fall Protection Respirator / Filter.
All Signatures are Required PRIOR to INITIAL work. Authorized Entry Print NameSignatureDate Permit Holder Permit Issuer Chief Operator (if required) Job.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
Time Completed Job Initials Main steps in a Confined Space Entry setup 1 Job assigned in a vessel that requires the vessel to be entered (definition of.
All Signatures are Required PRIOR to INITIAL confined space entry. Authorized Entry Print NameSignatureDate Permit Holder Permit Issuer Shift Supervisor.
Flashpoint of Kerosene by Tag Manual Closed Cup Tester NOTE: Sample should be chilled to at least 20°F below expected flashpoint. 1Place flash tester in.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
Permit to Work System TDI-Brooks International December 2014.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
3Process Description – Permit to Work System 3.1General:  The permit to work system defines the process to be followed to control specific types of work.
Revised Spring 2007 Hazard Communication And Your Right - To - Know Dept of Environmental Safety Services.
Lesson 1-5 Chemical, Fire, and Electrical Safety.
Welding, Cutting, and Brazing
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Hazard Communication 29 CFR
Hot Work Permit Osan AB Fire Emergency Services.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
SAFE Work Permit  Meraux Refinery  Cold Work Low Energy
Job Hazards Y Standard Controls Job Hazards Y Standard Controls PPEReq’d Static ElectricityGrounding,Manual Handling / LiftingAssessment & lifting equipment.
All Signatures are Required PRIOR to Hot Work Start. Time Start Time Expires Authorized Print NameSignatureDate Permit Holder Permit Issuer (Chief Operator)
Rev. 1 © Chevron 2009 Hot Work Awareness Plus. Rev. 1 © Chevron Training Objectives  To explain the type of work which may constitute Hot Work.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
Job Hazards Y Standard Controls Job Hazards Y Standard Controls PPE Req’d Access & EgressHousekeeping, Walkways, StairsManual Handling / LiftingAssessment.
Antirust Properties of Petroleum Products by NACE Corrosion
Qualified Electrical Worker
Goodyear Napanee Contractor Safety
System Lock Out/Tag Out and Line Breaking GSS24
Safety is part of our culture at Halliburton
Materials and Reagents
References / Documents
Start JSA Team JSA Note Inspect Site Hazards Resolve JSA Sign Permit
Presentation transcript:

All Signatures are Required PRIOR to Hot Work Start. Authorized Print NameSignatureDate Permit Holder Permit Issuer Chief Operator Fire Watch Job Hazards Y Standard Controls Job Hazards Y Standard Controls PPE Req’d Access & EgressHousekeeping, Walkways, StairsManual HandlingAssessment,& Equipment Standard (SSP-0011) Y Activities of OthersCommunications, Barriers, PermitMoving PartsCovers, Isolation, & Maintenance Full Face Shield Adverse WeatherStop Work & Take RefugeNoiseInsulation, Hearing Protection, & PPE Goggles Chemical ExposureMSDS Review, PPEOverhead CablesLabelling, Isolation, & Barriers Hearing Protection Vehicle EntryProcedures, Barriers, & PermitSharp EdgesCovers, PPE, & Equipment Inspections Fall Protection ElectricityIsolation, LOTOSlips, Trips & FallsHousekeeping, PPE Chemical Gloves Exposure to FuelsPPEStatic ElectricityGrounding, Chemical Suit FatigueRest Periods, RefreshmentsTrapped PressureVenting, Draining, & PPE Respirator ½ face Fire & ExplosionGas Testing & IsolationVehicle TrafficHi-Vis Clothing, Speed Limit, & Signs Respirator Full Face Fumes & DustFilter Mask, Eye ProtectionUnderground CablesCAT Testing, Labelling, & Barriers Air Supplied Hood/Line Soil/Water ContaminationIsolationHot LiquidProcedures & PPE SCBA Secondary ContainmentProceduresWorking at HeightHand Rails, Harness, & Life-Line Personal H2S Monitor Y Hot SurfacesProcedures & PPEWorking Over WaterLife Jacket, & Safety Boat,Other.. Nature (insects, snakes…)Awareness, Remove, PPEInside Falling MaterialScaling walls, shoring up, securing Meraux Refinery Hot Work Permit Permit Number: Information to be completed by Permit Holder Company:  Meraux Refinery Contractor Name  Area/UnitPermit Holder:Date: Equipment ## Persons: Work Order # (s) Scope of Proposed Task: Information to be completed by Permit Issuer. Work Description: Previous Product in Vessel: MSDS Checked  Yes  No Comment: Equipment Pre-Work Req’d Done Equipment Pre-Work Req’dDone Area Preparation Req’dDone LOTO Procedures FollowedLock Box Number:Trained Fire Watch Y Valves-Closed/Tagged/Chained/Locked Orange Vest Y Equipment Opened/DepressurizedEquipment Decontamination Signal Horn Y Blinded/Disconnected Water Washed Fire Extinguisher Y Electrically locked / tagged out N2 PurgedArea “Wet Down” Field Test / Attempt to Energize-start SteamedContained Sparks Blinds Verified & Blind-List initialedLightingSumps-Drains Covered 120 V w/ GFCIClean-up oil in area Additional Fire Equipment NoDateTime%LELOxygenH2SH2SCOOtherSerial NoMeraux Qualified Person: Additional Controls Required:Special Instructions: All Signatures are Required PRIOR to EXTENDING permit up to 12 hours. Authorized Print NameSignatureDate Permit Holder Permit Issuer Chief Operator Fire Watch Permit End Work Completed Work Site in Safe ConditionPrint NameSignatureDate Permit Holder  Yes  No Unit Operator  Yes  No Signing this Work Permit signifies the job site has been inspected by the Permit Issuer and Permit Holder, the area is prepared, and each individual has agreed to comply with the conditions of this confined space permit. The Permit is valid for a period of up to 12 hours or may be extended (below) for up to 24 hours.