Cesg-1 28 April 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA.

Slides:



Advertisements
Similar presentations
November SLS RFM and RNG REPORT 18 November 2004.
Advertisements

0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
1 16 June 2006 Space Link Services Area report to CESG Rome, Italy, 16 June 2006 J.L. Gerner / G. Moury.
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
07-Apr-2014-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Fall 2014 Meeting London (United Kingdom) SPACE LINK SERVICES (SLS) AREA Gippo / Gilles.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
CCSDS Security WG meeting October 2008, hosted by DLR at DIN premises (Berlin) 1 Data Link Security BOF An ESA contribution on Lessons Learned and Issues/Questions.
1 April 2009 CSTS WG: CSTS WG: report to the CSS Area Colorado Springs 25 April 2009 Yves Doat.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/PARSONS November 2014 BSI, London.
Cesg-1 4 November 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 10) StatusComment ProgressGood Progress overall, especially on the.
1 23 January 2007 Space Link Services Area report to CESG/CMC Colorado Springs, USA, 24 January 2007 J.L. Gerner / G. Moury.
FSH/security SLS-SLP fall2009 (version 4) Page 1 Security Headers + Homogeneous approach to FSH and Insert Zone in TM/AOS/TC frames: some problems and.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
Proposal for a TC-2 Protocol Ed Greenberg Greg Kazz Oct /27/20151.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
November SLS AREA REPORT November SLS AREA REPORT CONTENTS A.CURRENTLY ACTIVE WGs AND BOFs WITHIN AREA B.SUMMARY TECHNICAL STATUS OF EACH.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 6) StatusComment ProgressGood Progress overall, especially on the.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
CCSDS march 2008 meeting – Crystal City 1 TC/TM space links security SEA / SLS cross area meeting.
CCSDS Engineering Steering Group: Report to the CCSDS Management Council CMC Meeting May 2004 CSA, Montreal, Canada Adrian J. Hooke Chairman, CESG.
1 Space Link Services Area report to CESG/CMC Darmstadt, Germany, 9 October 2007 J.L. Gerner / G. Moury.
1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
SLS AREA REPORT May SLS AREA REPORT CESG MEETING Montreal, 17 May 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
November SECURITY WORKING GROUP REPORT November 2004.
1 09 October SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor.
Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 1 SLS-C&S WG Spring 2004 Meeting Summary to SLS Area Director.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
April Space Link Services AREA REPORT 15 April 2005.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
1 19 September 2005 Space Link Services Area report to CESG Atlanta, Georgia, USA, 19 September 2005.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
June MOIMS AREA PLENARY NAVIGATION WG REPORT June 2006 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
National Aeronautics & Space Administration European Space Agency & 1 Modulation and Coding: Draft IOAG Resolutions to CCSDS September 9, 2008 Les Deutsch.
10-Dec-2012-cesg-1 Presentation to ESTEC Nordwijk, Netherlands 8 April 2014 CCSDS Space Link Services (SLS) Area Area Director: Gian Paolo Calzolari (ESA/ESOC)
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
19-May-2015-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Spring 2015 Meeting CalTech (Pasadena, CA, USA) SPACE LINK SERVICES (SLS) AREA Gippo /
10-Dec-2012-cesg-1 IOAG-17d telecon 19th Nov 2013 CCSDS Engineering Steering Group (CESG) Report to the IOAG.
SPACE LINK SERVICES (SLS) AREA
The CCSDS Security WG is chartered to:
SPACE LINK SERVICES (SLS) AREA
CCSDS Systems Engineering Area: Security Working Group
Joint Meeting of the CCSDS and the OMG-SDTF
SPACE INTERNETWORKING SERVICES (SIS) AREA
SLS AREA REPORT November 2004 November 2004.
Delta-DOR WG: Report of the Fall 2010 Meeting
SLS AREA REPORT Goal: Next Generation Uplink WG
Atlanta, Georgia, USA, 16 September 2005
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACE LINK AREA MID-TERM REPORT
Presentation transcript:

cesg-1 28 April 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA

cesg-2 28 April 2009 CONTENTS A.CURRENTLY ACTIVE WGs, BOFs & SIGs WITHIN AREA & STATS B.SUMMARY TECHNICAL STATUS OF EACH WG, BOF & SIG C.INTRA & CROSS-AREA TECHNICAL ISSUES D.OTHER ISSUES AND CONCERNS E.PROPOSED AREA RESOLUTIONS / ACTION ITEMS SLS REPORT

cesg-3 28 April 2009 A.CURRENTLY ACTIVE WGs, BOFs & SIGs WITHIN AREA SLS REPORT 1. RFM WGRadio Frequency & Modulation * 2. RNG WG Ranging * 3. C&S WGCoding & Synchronisation 4. LEC BOFLong Erasure Codes 5. SLP WGSpace Link Protocols 6. NGU WGNext Generation Uplink 7. MHDC WG Multi/Hyperspectral Data Compression 8. SDLS WG Space Data Link Security (Joint with SEA) 9. PlaCom SIG Planetary Communications * Will meet early May

cesg-4 28 April 2009 A.STATISTICS SLS REPORT UPDATE

cesg-5 28 April 2009 B. SUMMARY TECHNICAL STATUS OF EACH WG, BOF & SIG SLS REPORT

cesg-6 28 April 2009 Working Group Status: Active status:OKCAUTIONPROBLEM comment:Meets in May 2009 SLS REPORT 1.RFM WG Goal White recommendation on 22 GHz (the band near 22 GHz), and 26 GHz modulation; Red recommendations on 32 GHz modulation, and on 2 GHz modulation for Moon missions or missions supported by data relay satellites; Revised G ready for approval by CESG; Concept papers on high rate TLM and PN ranging. 2.RNG WG Goal: Issue Green Book on novel ranging techniques Working Group Status: Active Working Group Summary Situation: status:OKCAUTIONPROBLEM comment:Meets in May 2009

cesg-7 28 April C&S: Coding & Synchronization WG Working Group Status: Active Working Group Summary Situation: Working Group Summary progress :  See next slides status:OKCAUTIONPROBLEM comment:X SLS REPORT

cesg-8 28 April 2009 C&S: Coding & Synchronization WG - Working Group Summary progress Revision of CCSDS B-1 TM Synchronization and Channel Coding (LDPC Codes addition & Five Years Review )  On-line editing has been performed with active discussion. Draft Pink Sheets to be finalised and reviewed within the WG prior to submission for agency review SLS REPORT EDITING SESSION Revision of CCSDS Recommendation for Proximity-1 Space Link Protocol – Coding and Synchronization Sublayer (Five Years Review in coordination with the Space Link Protocol WG)  On-line editing has been performed with active discussion. Some items shall be edited out of the meeting. Input from NASA is also expected for clarifications. In progress. Revision of CCSDS B-1 TC Synchronization and Channel Coding. Blue Book. (Introduction of TC Repeated Transmission in coordination with the Space Link Protocol WG)  The proposed changes have been presented and discussed. There is general WG agreement on the technical validity of the proposed changes. Agencies position has been deferred to the SLP meeting since other two books are affected. In progress.

cesg-9 28 April 2009 C&S: Coding & Synchronization WG - Working Group Summary progress SLE Books Issues – Coordination with CSS-CSTS  C&S WG consensus on requesting to maintain the ERT (Earth Receive Time) specification present in the approved version of the SLE RAF and RCF Blue Book(s).  C&S WG consensus on the fact that mixing of coding options is not allowed. This is reflected in the changes introduced in the Pink Sheets to the TM Coding Blue Book.  Joint Session with CSTS held and items agreed:  maintain the ERT (Earth Receive Time) specification present in the approved version of the SLE RAF and RCF Blue Book(s).  mixing of coding options is not allowed SLS REPORT Issues with the Turbo Codes Sync Marker rates ¼ and 1/6  False synchronization lock problems may occur with TC rates ¼ and 1/6  Action on all Agencies to report on their experience and opinion for follow up activity.

cesg April 2009 C&S: Coding & Synchronization WG - Working Group Summary progress SCCC Standardization (Joint Meeting with RFM and SLP)  The matter about patents is not clarified yet. Caltech claim ‘the SW is licensed exclusively to a third party’. Confusion. Is Caltech talking of the US patent?  Some of the requested technical results are not available yet and they will be made available in future.  Further decisions will be taken according to accomplishment of pending actions within RFM WG and patents investigations.  NASA/JPL requests the SLS Area Director to verify within CESG the need of free royalties for publication of Standards. Resolution-1 SLS Request the CESG/CMC to action NASA to resolve the SCCC patent issue with Caltech. DVB-S2 Standardization (Joint Meeting with RFM and SLP)  Patents issues: decoding is subject to royalties, encoding is royalty-free.  Further decisions will be taken according to accomplishment of pending actions within RFM WG and patents investigations. SLS REPORT

cesg April 2009 C&S: Coding & Synchronization WG - Working Group Summary progress Summary of High Data Rate Randomizer investigations  These follow up alternatives are identified:  Study and introduce new randomization & synchronization options.  Report issues in Green Book.  Action on all Agencies to report on their experience and opinion for follow up activity. Channel Coding Green Book update  Items for change have been identified SLS REPORT Optical Communications (Joint Meeting with RFM & SLP)  Action on DLR and NASA/JPL to produce a combined charter for a SIG.  Action on SLS Area director to verify within CESG/CMC interested Agencies.

cesg April 2009 SLS REPORT 4.SLS-LEC: Long Erasure Codes BOF Goal: Make, if conclusive, a proposal for the creation of a WG on application of long erasure-correction codes. BOF Status : In progress BOF Summary Situation: BOF Summary progress: Subject not mature for a WG. No clear mission scenarios. Optical and RF links under consideration. Need to focus on specific case. Action on DLR and JPL to produce mission scenarios for optical links with erasure model. Due: end of September status:OKCAUTIONPROBLEM comment: X

cesg April SLS-SLP WG Goal: Progress TM & AOS Pink Sheets regarding OID Frame usage. Progress Encapsulation Service Pink Sheets Progress Space Packet Protocol APID definition Pink Sheets to Blue book Progress the TC, AOS, TM, and SPP CRC pink sheets to Blue book Progress Space Link Identifiers Pink Sheet (adding IPE for IP header compression via Annex A [normative] to Blue Book Discuss the merit of ESA’s proposal on TC “Systematic Retransmission” WG Status: Active X Idle ____ WG Summary Situation: status:OKCAUTIONPROBLEM comment:Good progress SLS AREA REPORT

cesg April 2009 SLS-SLP WG WG Summary progress: To be ready soon for BB publishing AOS and TM Blue Books OID frames definition clarification Encapsulation Service Pink Sheets TM, TC, AOS, and SPP BBs. The CRC pink sheets containing the normed CRC encoding/decoding diagrams. Space Link Identifiers Annex A CCSDS IPE Internet Protocol Extension) BB SPP BB APID definition SLS AREA REPORT Problems and Issues: ESA Proposal on TC ‘Systematic Retransmission’ Ongoing coordination with CSS-CSTS on impact of TC systematic retransmission proposal on SLE-FSP and SLE-CLTU. SPP GB Final edits made after Berlin meeting. Book should be published by now. Action SLS AD: Raise the issue at CESG

cesg April 2009 SLS-SLP WG (cnt’d) Resolutions : 2.‘OID Frame naming issue’. Request the CESG/CMC accept the updated TM Space Data Link Protocol and AOS Space Data Link Protocol pink sheets to new version Blue Books. 3.Request the CESG/CMC accept the Encapsulation Service Pink Sheets for publication as a new version of the Blue Book. 4.‘APID Definition Issue’. Request the CESG/CMC accept the edits to the current version of the Space Packet Protocol and advance it as a new Blue Book version. 5.Request the CESG/CMC to accept the TC, AOS, TM, and SPP CRC pink sheets to Blue book 6.Request the CESG/CMC to accept the Space Link Identifiers Pink Sheet (adding IPE for IP header compression via Annex A [normative] to Blue Book SLS AREA REPORT

cesg April Next Generation Uplink WG Goal: Develop a Green Book for Next Generation Uplink (NGU) application profiles. Whenever possible incorporate new requirements into existing Blue books supported by the RF & Modulation, Channel Coding & Synchronization, and Link Layer protocol WGs. If incorporation into existing Blue books is not possible, determine if a new Magenta or Blue book needs to be written. WG Status: Active X Idle ____ WG Summary Situation: Good progress. status:OKCAUTIONPROBLEM comment:Good progress SLS AREA REPORT

cesg April 2009 NGU WG (cnt’d) NGU has described, generated requirements, and assigned action items to existing CCSDS WGs to formulate communication solutions for the following NGU application Profiles: 1.File Uplink (data rates from 4 Kbps up to 1000 Kbps) 2.Emergency Communications Unmanned ( bps) 3.Human Support (up to 25 Mbps) Significant new communication approaches that NGU is investigating with the support of existing WGs for the profiles above are: Synchronous uplink using more coding gain New uplink acquisition sequence and technique Use of Security techniques on the uplink Use of Ranging techniques on same frequency bands as Telecommand SLS AREA REPORT Action Items: AIs generated at this meeting are to be relayed and coordinated with the following WGs: SLS-RF&MOD, SLS-C&S, SLS-SLP, SLS-Ranging, SLS-SDLS, SEA-SWG, CSS-CSTS, SOIS-Wireless Problems and Issues: Determination of exactly what kind of book (Magenta vs Blue) NGU WG effort will generate is in flux depending upon the results of the action items assigned at these meetings.

cesg April 2009 Oct Multispectral & Hyperspectral Data Compression (MHDC) WG Goals: 1.Present compression performance results demonstrating compression performance under varying error containment segment sizes 2.Select lossless compression approach for standardization. Working Group Status: Active X Idle ____ Working Group Summary Situation: Disagreements on assessments and relative importance of algorithm selection criteria; goal #2 not met. Agreed on action items to provide a more thorough assessment of hardware implementation complexity and provide a performance comparison of the prediction stages. status:OKCAUTIONPROBLEM comment:OK progress SLS AREA REPORT

cesg April Space Data Link Security WG (cross-area SEA/SLS) Goals: Develop standard protocol for security at the data link layer. This includes authentication and/or encryption both uplink and downlink. This protocol will be independent from crypto algorithm and compatible with CCSDS TM/TC/AOS data link protocols. WG Status: Active X (7 agencies, 21 participants) Idle ____ WG Summary Situation: User requirements finalized (URD) Issues linked to the design of the protocol identified & discussed Review of the NASA proposal which will be updated according to RID dispositions to become White Book v1 status:OKCAUTIONPROBLEM comment:good progress (URD finalized) SLS AREA REPORT

cesg April 2009 Space Data Link Security WG Planning : White book v1 for core protocol : July 2009 Red-1 for core protocol : november 2009 Interoperability testing of core protocol : nov2009 – feb2010 Red-2 for core protocol : april 2010 Blue book for core protocol : July 2010 Green book for core protocol : Oct 2010 SLS AREA REPORT Resolutions : None Action: See WG action items list

cesg April Planetary Communications BOF (cross-area SEA/SIS/SLSSOIS) Goals: Develop Requirements for planetary communications Issue a charter for a PlaCom WG BOF Status: Active X (27 participants) Idle ____ BOF Summary Situation: status:OKCAUTIONPROBLEM comment:good progress SLS AREA REPORT Participants of the meeting considering, That the topic is far from mature to develop a WG charter That the topic concerns several areas (SLS, SIS, SEA, SOIS) Resolved To convert the BOF into a SIG Actions: SIG membership to be consolidated Agencies to report on mission requirements

cesg April 2009 C. INTRA & CROSS-AREA TECHNICAL ISSUES New Cross-area work in the frame of PlaCom SIG SLS REPORT D. OTHER ISSUES AND CONCERNS None