Mars Technology Program 2/17/20051 MARS HUMAN PRECURSOR SCIENCE/EXPLORATION STEERING GROUP (MHP-SSG) INTRODUCTION David Beaty, Noel Hinners Feb. 17, 2005.

Slides:



Advertisements
Similar presentations
1 1 Session 5: Focused DiscussionsMissions in Definition Possible Next Decade Major In-situ Exploration Missions: AFL and Deep Drill Andrew Steele, David.
Advertisements

3-Year Implementation Schedule. What is the 3-Year Implementation Schedule? A list of prioritized projects for implementers with a time frame to complete.
Moon to Mars C. P. McKay NASA Ames Research Center
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
National Aeronautics and Space Administration Humans to Mars: HEOMD and MEPAG John Connolly Exploration Chief Scientist (acting) NASA Human Exploration.
The Lunar Reconnaissance Orbiter (LRO) is the first mission in NASA's Vision for Space Exploration, a plan to return to the moon and then to travel to.
Lunar Advanced Science and Exploration Research: Partnership in Science and Exploration Michael J. Wargo, Sc.D. Chief Lunar Scientist for Exploration Systems.
CAVIAR – Continuum Absorption by Visible and Infrared Radiation and its Atmospheric Relevance How on schedule are we? Keith Shine Department of Meteorology,
Environmental Health XIV. Standards and Monitoring Shu-Chi Chang, Ph.D., P.E., P.A. Assistant Professor 1 and Division Chief 2 1 Department of Environmental.
What are the Forms of Hazardous Radiation? Stanley B. Curtis Fred Hutchinson Cancer Research Center, ret. & Dept. of Environmental Health University of.
DOPPLER DOPPLER A Space Weather Doppler Imager Mission Concept Exploration Science Objectives What are the most relevant observational signatures of flare,
Mars Exploration By Jacob Stinar. Water on Mars.
Codex Guidelines for the Application of HACCP
IPPW- 9 Royal Observatory of Belgium 20 June Von Karman Institute for Fluid Dynamics Obtaining atmospheric profiles during Mars entry Bart Van Hove.
What is Business Analysis Planning & Monitoring?
Jet Propulsion Laboratory California Institute of Technology National Aeronautics and Space Administration National Aeronautics and Space Administration.
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
S/W Project Management
A core Course on Modeling Introduction to Modeling 0LAB0 0LBB0 0LCB0 0LDB0 S.31.
Overview of US EPA’s Vapor Intrusion Guidance VAP CP Summer Coffee July 14 th, 2015 Carrie Rasik Ohio EPA CO- Risk Assessor
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
1 Using Multi-temporal MODIS 250 m Data to Calibrate and Validate a Sediment Transport Model for Environmental Monitoring of Coastal Waters.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
CryosPheric responses to Anthropogenic PRessures in the HIndu Kush-Himalaya regions: impacts on water resources and society adaptation in Nepal DHM Centre.
I can name the steps of the scientific method, in order. Structure & Transformation.
Filling Mars Human Exploration Strategic Knowledge Gaps with Next Generation Meteorological Instrumentation. S. Rafkin, Southwest Research Institute
Risk Management for Technology Projects Geography 463 : GIS Workshop May
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Workshop to Support Mars Human Precursor Radiation Measurements on the Surface of Mars Dr. Ron Turner October, 2005.
1 Human Performance in Reactor Safety George E. Apostolakis Massachusetts Institute of Technology Presented at the Quality Colloquium,
The exposure of the Moon to the Earth’s plasmasheet Mike Hapgood STFC Rutherford Appleton Laboratory
Tingxuan Liu Risk Management in Software engineering.
System for Radiation Environment characterization (fluxes, doses, dose equivalents at Earth, Moon and Mars) on hourly thru yearly time frame Example: Snapshots.
Identifying Grand Challenges in Climate Change Research: Guiding DOE’s Strategic Planning: Report on the DOE/BERAC workshop March Crystal City For.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
Object-Oriented Software Engineering
Monitoring Principles Stella Swanson, Ph.D.. Principle #1: Know Why We Are Monitoring Four basic reasons to monitor:  Compliance Monitoring: to demonstrate.
Innovative Program of Climate Change Projection for the 21st century (KAKUSHIN Program) Innovative Program of Climate Change Projection for the 21st century.
Living With a Star (LWS) and the Vision for Exploration LWS Mission Goal: Develop the scientific understanding necessary to effectively address those aspects.
A White Paper on the potential for a small scale airborne system for Threat assessment, Characterization, Monitoring, and Tactical feed-back for deployment.
Dose Predictions for Moon Astronauts Image Source: Nicholas Bachmann, Ian Rittersdorf Department of Nuclear Engineering and Radiological.
Radiation on Planetary Surfaces M. S. Clowdsley 1, G. DeAngelis 2, J. W. Wilson 1, F. F. Badavi 3, and R. C. Singleterry 1 1 NASA Langley Research Center,
Screen 1 of 20 Vulnerability Vulnerability Assessment LEARNING OBJECTIVES Define the purpose and scope of vulnerability assessment. Understand how vulnerability.
Basic Nursing: Foundations of Skills & Concepts Chapter 9
Space Radiation Health Effects of Astronauts in Explorative Missions
SOFTWARE PROJECT MANAGEMENT
PREDECISIONAL FOR PLANNING AND DISCUSSION PURPOSES ONLY 1 Humans to the Martian System Preliminary Summary of Strategic Knowledge Gaps P-SAG (jointly sponsored.
Project Risk Management Planning Stage
Dr. Richard R. Vondrak Director, Robotic Lunar Exploration Program Science Mission Directorate NASA Headquarters September 2004 NASA Robotic Lunar Exploration.
Session 5, CMAS 2004 INTRODUCTION: Fine scale modeling for Exposure and risk assessments.
Earth-Moon-Mars Radiation Environment Model N. A. Schwadron, K. Kozarev, L. Townsend, M. Desai, M. A. Dayeh, F. Cucinotta, D. Hassler, H. Spence, M. Pourars,
Human Exploration of Mars Design Reference Architecture 5
Part 1d: Exposure Assessment and Modeling Thomas Robins, MD, MPH.
Scot Rafkin Southwest Research Institute Boulder, CO Image Credit: MSSS/NASA/JPL.
National Aeronautics and Space Administration February 27, 2013 Defining Potential HEOMD Instruments for Mars 2020 A Work in Progress... NOTE ADDED BY.
16-20 Oct 2005SSPVSE Conference1 Galactic Cosmic Ray Composition, Spectra, and Time Variations Mark E. Wiedenbeck Jet Propulsion Laboratory, California.
United States Department of Agriculture Food Safety and Inspection Service Overview of Trim Sampling Compliance Guidelines and Discussion Daniel Engeljohn,
Breakout Session 1 Air Quality Jack Fishman, Randy Kawa August 18.
Dose Predictions for Moon Astronauts Image Source: Nicholas Bachmann, Ian Rittersdorf Nuclear Engineering and Radiological Sciences.
Lunar Surface Atmosphere Spectrometer (LSAS) Objectives: The instrument LSAS is designed to study the composition and structure of the Lunar atmosphere.
Next Generation Climate Related Standards (2013) K Middle School High School K-PS3-1. Make observations to determine the effect of sunlight on Earth’s.
Pre-decisional – for Planning and Discussion Purposes Only 1 Technology Planning for Future Mars Missions Samad Hayati Manager, Mars Technology Program.
Phil Dempsey ISS Vehicle Office July 15, 2014 Inspection Considerations from the ISS Program NASA In-Space Inspection Workshop 2014.
Failure Modes, Effects and Criticality Analysis
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
Planetary Protection Category V Restricted Earth Return
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
Presentation transcript:

Mars Technology Program 2/17/20051 MARS HUMAN PRECURSOR SCIENCE/EXPLORATION STEERING GROUP (MHP-SSG) INTRODUCTION David Beaty, Noel Hinners Feb. 17, 2005

2/17/2005 Findings of the MHP SSG 2 MHP SSG Introduction The context This analysis The full job A full program of preparing for a human mission to Mars needs to consider the following components: Flight missions to Mars –Measurements of the martian environment. –Tech. Demos/Infrastructure Emplacement Missions to the Moon Laboratory, Field, and Flight test program on Earth Flight missions to Earth orbit

2/17/2005 Findings of the MHP SSG 3 MHP SSG Introduction Why do Precursor Missions? Reduce Risk Uncertain knowledge of Mars—requires higher design margins than necessary Demonstrate flight technology—flight-tested systems are less risky. Reduce Cost Identify the cost drivers, find lower-cost alternatives Increase Performance From a starting point of minimum acceptable performance, are there ways performance can be increased at acceptable cost?

2/17/2005 Findings of the MHP SSG Science Focus Team Leaders = Bishop, Heldmann MHP SSG Introduction Organization of the Study OVERALL LEADERS: Beaty, Hinners MEASUREMENTS Radiation Haz. Team Leader = Zeitlin Dust/Soil/ Toxicity/ Focus Team Leader = Wagner Biohazard/ PP Focus Team Leader = Allen Atmosphere/ Weather Focus Team Leader = Farrell Terrain Focus Team Leader = Eppler TECHNOLOGY/ INFRASTRUCTURE Transit Team Leader = Joosten Mars Atmosphere Flight Team Leader = Powell Surface Operations Team Leader = Kohlhasse HUMAN ACTIVITY AT MARS INPUTS TO ADVANCE MISSION PLANNING, (Frank Jordan) Hinners, Braun Beaty, Snook Beaty Water Resources Focus Team Leader = XXX

2/17/2005 Findings of the MHP SSG 5 MHP SSG Introduction Engaging the Community n = 100 Intellectual Diversity Organizational Diversity Geographic Diversity

2/17/2005 Findings of the MHP SSG 6 1.The first human mission is scheduled in goes to the martian surface at least one EVA 2.The series of robotic precursor missions will be designed to reduce risk/cost in the first human mission. For the purpose of this analysis the human program beyond the first mission is undefined. 3.Assume the long-stay and short-stay martian missions are BOTH under active consideration. 4.First dedicated robotic precursor mission in MHP SSG Introduction Assumptions for this Study

2/17/2005 Findings of the MHP SSG 7 MHP SSG Introduction This Session

Mars Technology Program 2/17/20058 MEASUREMENT SUB-TEAM INTRODUCTION David Beaty, Kelly Snook

2/17/2005 Findings of the MHP SSG 9 Measurement Team Introduction Risk Analysis 1.Risk analysis process guided by professional risk analysis team (SAIC). 2.Using expert focus teams, probability and consequence of risks that can be reduced by precursor measurement assessed. Risk Prioritization Criteria a)Magnitude of effect of precursor information on reduction of risk and/or cost of a human mission to Mars. b)Perceived degree of viability and cost of available engineering solutions c)Potential to obtain minimum necessary information in a less expensive way than by flying a mission to Mars.

2/17/2005 Findings of the MHP SSG 10 Measurement Team Introduction Risk Analysis All of the risks to the first human mission will need to be dealt with in one of the following ways: Accept the risk Mitigate the risk by means of engineering solutions Buy down the risk by means purchasing advance information –reduce uncertainty (so we don’t engineer to the upper limit) –Establish new (lower-cost) engineering solutions It is not MHP SSG’s job to decide what risks are unacceptable. Our job is to place them in priority order to support future decision-making.

2/17/2005 Findings of the MHP SSG 11 Measurement Team Introduction Recommended Revision to Goal IVa

Mars Technology Program 2/17/ TEAM DUST INTRODUCTION Sandy Wagner, Team Leader

2/17/2005 Findings of the MHP SSG 13 Team Dust Risks Risk 6A: Failure Due to Abrasion and Accumulation Risk 6B: Failure of Electrical Systems Risk 6C: System Failure Due to Corrosive Effects of Dust Risk 7: If the crew inhales or ingests dust adverse health effects may result. Apollo 12 – Alan Bean’s Spacesuit After Before

2/17/2005 Findings of the MHP SSG 14 Team Dust Investigations and Measurements Investigation 1A. Characterize the particulates that could be transported to mission surfaces through the air (including both natural aeolian dust and particulates that could be raised from the martian regolith by ground operations), and that could affect hardware’s engineering properties. Analytic fidelity sufficient to establish credible engineering simulation labs and/or performance prediction/design codes on Earth is required.

2/17/2005 Findings of the MHP SSG 15 Team Dust Investigations and Measurements Measurements a.Complete analysis Shape and size distribution Mineralogy Electrical and thermal conductivity Triboelectric and photoemission properties Chemistry b.Polarity and magnitude of charge individual dust particles suspended in atmosphere concentration of free atmospheric ions with positive and negative polarities. c.The same measurements as in a) on a sample of air- borne dust collected during a major dust storm. d. Subsets of the complete analysis described in a), and measured at different locations on Mars.

2/17/2005 Findings of the MHP SSG 16 Team Dust Investigations and Measurements Investigation #2. Determine the possible toxic effects of martian dust on humans.

2/17/2005 Findings of the MHP SSG 17 Team Dust Investigations and Measurements Measurements: 1.For at least one site, assay for chemicals with known toxic effect on humans. 2.Fully characterize: soluble ion distributions reactions that occur upon humidification released volatiles 3.Analyze the shapes of martian dust grains 4.Determine if martian regolith elicits a toxic response in an animal species which is a surrogate for humans.

2/17/2005 Findings of the MHP SSG 18 Team Dust Risk Mapping Risk 6A Risk 6B Risk 6C Risk 7 Measurement 1A.a Measurement 1A.b Measurement 1A.c Measurement 1A.d Measurement 2A Measurement 2B Measurement 2C Measurement 2D Risk Measurements Risk Exposure For System Reliability For Electrical Shock Reduction For More Confidence in Measurements For Human Exposure Requirements Less value than 1A.a

Mars Technology Program 2/17/ TEAM ATMOSPHERE INTRODUCTION Bill Farrell, Team Leader

2/17/2005 Findings of the MHP SSG 20 Team Atmosphere Risks Risk #4: Wind shear and turbulence will create unexpected and uncompensatable trajectory anomalies affecting EDL and TAO. Risk #8: Dust storm electrification may cause arcing, and force human explorers to seek shelter during storms and affect TAO. Risk #10: During crew occupation and EVA, dust storm may affect visibility to the point where EVA’s for regular habitat maintenance becomes compromised. Risk #15: Photochemical and chemical reactions in the atmosphere have the potential to corrode equipment and/or create a toxic environment for humans.

2/17/2005 Findings of the MHP SSG 21 Team Atmosphere Investigations and Measurements Investigation #1B. Determine the fluid variations from ground to >90 km that affect EDL and TAO including both fair-weather and dust storms.

2/17/2005 Findings of the MHP SSG 22 Team Atmosphere Investigations and Measurements Measurements –Measure v, P/ , and T in the atmosphere during EDL with as many profiles/locations as possible. Quantify turbulent layers. –Monitor surface/near-surface v, P/ , and T, as a function of time, as many locations as possible. –Make long-term observations of the weather from orbit (aeolian cloud frequency size and occurrence, temperature & density profiles, winds as a function of altitude, with profiles obtained globally). –During human EDL and TAO, pre-deploy ascent/descent probes to obtain P, V, and T along assumed trajectory. Measurements needed globally with special emphasis on km to quantify boundary layer turbulence and km where vehicle dynamic pressures are large

2/17/2005 Findings of the MHP SSG 23 Team Atmosphere Example: BL Atmosphere Dynamics Models indicate that boundary layer very dynamic and unstable in afternoon via solar heated surface MER Mini-TES obtained atmospheric temperature vs height profiles via radiative transfer inversion model Observed a super-adiabatic layer in the afternoon resulting in turbulent motion High time resolution shows the passage of thermal plumbs extending to high altitudes over MER… temperature changes on order of 5 o C. What are the winds during unstable period? Don’t know because a surface MET package was not included Some of the plumbs may even be hot- cored vortices [Ryan and Lucich, 1983] with substantial wind shifts Smith et al, 2004 Multi-sol composite Temperature profile vs Local Time

2/17/2005 Findings of the MHP SSG 24 Team Atmosphere Investigations and Measurements Measurements Derive the basic measurements of atmospheric electricity that affects TAO and human occupation. –DC E-fields (electrostatic fields), AC E-fields (RF from discharges & RF contamination assessment), atmospheric conductivity probe, surface conductivity probe, and grain radius and charge –Combine with surface MET package to correlate electric and its causative meteorological source over a Martian year, both in dust devils and large dust storms. Measurements needed on at least one landed mission.

2/17/2005 Findings of the MHP SSG 25 Team Atmosphere Example: Melnik and Parrot [1998] Simulated Martian dust cloud dynamics Charged grains via contact electrification Allowed large and small grains to separate via gravitational filtration Used Poisson solver to monitor ES fields Found inter-cloud potential differences of 300 kV over 100 m dust devil and E-field values near local breakdown levels Rocket launch could cause a discharge from cloud top-to-bottom Parallel to KSC field mill system

2/17/2005 Findings of the MHP SSG 26 Team Atmosphere Investigations and Measurements Measurements Determine the meteorological properties of dust storms at ground level that affect human occupation and EVA. –P (or  ), V, T, and dust density (opacity) as a function of time at the surface, for at least a Martian year, to obtain an understanding of the possible MET hazards inside dust storms. Dust particle properties should be quantified (see Soil/Dust FT). –Orbiting weather station: optical and IR measurements to monitor the dust storm frequency, size and occurrence over a year, & measure terrain roughness and thermal inertia. Obtain temperature & density profiles, winds as a function of altitude, with profiles obtained globally.

Mars Technology Program 2/17/ TEAM BIOHAZARD INTRODUCTION Carl Allen, Team Leader

2/17/2005 Findings of the MHP SSG 28 Team Biohazard Risks Risk #5: Martian life transported to Earth Hazards to Earth’s biota and ecosystems Risk #9: Terrestrial life transported to Mars Local / widespread contamination False positive indication of life on Mars Hybridization with Martian life Risk #11: Martian life released in surface habitat Health hazard to crew Potential for mixing ecologies Interference with biological life support systems

2/17/2005 Findings of the MHP SSG 29 Team Biohazard Investigations – High Risk Investigation #1C. Determine if each Martian site to be visited by humans is free, to within acceptable risk standards, of replicating biohazards which may have adverse effects on humans and other terrestrial species. Sampling into the subsurface for this investigation must extend to the maximum depth to which the human mission may come into contact with uncontained Martian material.

2/17/2005 Findings of the MHP SSG 30 Team Biohazard Measurements Phase 1. Is life ‘everywhere’? Return and analyze samples in terrestrial laboratories. Test for evidence of Martian life in representative samples of the atmosphere, dust, near-surface soil, deep soil, rock and ice Fully characterize Martian life (if found) Test for biohazards Phase 2. Landing site screening At the site of the planned first human landing, conduct biologic assays using in-situ methods. At the site of the planned first human landing, conduct biologic assays using in-situ methods Measurements and instruments specific to Martian life found by previous investigations

2/17/2005 Findings of the MHP SSG 31 Team Biohazard Investigations – High Risk Measurements –Survival and reproduction under Martian conditions –Destruction or organics at the Martian surface –Mechanisms / rates of aeolian processes which disburse contaminants –Mechanisms of contaminant transport into the Martian subsurface –Adhesion characteristics of contaminants on landed mission elements Investigation #4. Determine the processes by which terrestrial microbial life, or its remains, is dispersed and/or destroyed on Mars, the rates and scale of these processes, and the potential impact on future scientific investigations.

2/17/2005 Findings of the MHP SSG 32 Team Biohazard Measurements Simulated Mars Environments Test for survival and genetic adaptation of terrestrial life under Martian conditions Assess rates, scales and methods of contamination dispersal under Martian conditions

Mars Technology Program 2/17/ TEAM RADIATION INTRODUCTION Cary Zeitlin, Team Leader

2/17/2005 Findings of the MHP SSG 34 Team Radiation Particles and Risks Galactic Cosmic Rays (GCRs) –Continuous –Low dose-rate –Predictable –Same at Earth and Mars –Risk is to long-term health, “late effects,” principally cancer. –Cannot be stopped by practical depths of shielding –Not stopped by Martian atmosphere –Include heavy ions which may be important biologically. Solar Energetic Particles (SEPs) –Sporadic –Sometimes v. high dose-rates –Not predictable at present –Not same at Earth and Mars –Can present risk of immediate and severe illness, even death. –Can be stopped by practical depths of shielding* –Stopped by Martian atmosphere* –Very rare events produce highly energetic heavy ions. * True in the vast majority of cases but not 100%

2/17/2005 Findings of the MHP SSG 35 Team Radiation Radiation Hazard Summary GCR Dose for two scenarios with NO shielding Note LEO career limits: 0.5 to 4.0 Sv depending on age & gender. 6 month transit each way  0.6 – 1.1 Sv total 30-day surface stay:.02 –.05 Sv total  < 10% of total. 500-day surface stay: 0.3 – 0.8 Sv total –0.3 – 0.8 Sv could be significant depending on definition of career limits –Shielding of habitats on surface may help considerably A KEY CONCLUSION: The GCR radiation risk for the entire mission is significant, but the contribution from the time on Mars is small for a short-stay scenario. SEP considerations on Martian surface Atmosphere provides significant shielding against primaries. Large fluxes of secondary neutrons are possible, give dose comparable to several months of exposure to GCR.

2/17/2005 Findings of the MHP SSG 36 Team Radiation Risks Risk #13: Risk of chronic radiation exposure exceeding career limits. Mitigations: Precise knowledge of GCR flux and an accurate transport model. Relax “acceptable” standard with informed consent. Risk #14: Risk of acute radiation exposure: Inadequate shielding against a severe solar event - crew members on surface EVAs especially at risk. Mitigations: Early warning system. Accurate modeling of transport of solar energetic particles through atmosphere. In vast majority of cases, shielding from Martian atmosphere is enough.

2/17/2005 Findings of the MHP SSG 37 Team Radiation Investigations, and Measurements Like “Safe on Mars”, we recommend measurements needed to validate radiation transport models. Measure ionizing radiation on Martian surface: –Distinguish contributions from charged particles vs. neutrons, with coarse directionality (up vs. down vs. sideways). –Neutron fluxes will vary with location. –Difficult to measure low-energy neutrons if an RTG is used. Simultaneously, make orbital measurements of the charged particle flux at the top of the atmosphere to test transport models for SEPs and secondaries. Measurements needed once (preferably twice) and over length of time sufficient to see multiple solar particle events.

2/17/2005 Findings of the MHP SSG 38 Team Radiation Why has the priority been reduced? Radiation risk for entire mission remains significant. –Very rare high-flux “hard spectrum” solar event is potentially dangerous and mitigation may not be possible. For long-cruise, short-stay mission, dose equivalent received on surface is a small part of the total (< 10%). Accuracy of risk assessment is incrementally advanced by measurements on the surface. –State of knowledge of particle fluxes & transport is relatively good, with some minor weaknesses. –Improved knowledge likely to have little effect on risk mitigation strategies.

Mars Technology Program 2/17/ RECOMMENDED REVISIONS TO MEPAG’S GOAL IVa

2/17/2005 Findings of the MHP SSG 40 Measurement Team Summary Recommended Revision to Goal IVa

2/17/2005 Findings of the MHP SSG 41 Possible Follow-up Studies Optimal configuration for human aeroassist landing vehicle ISRU Trade Space Systems-level landing site constraints (other than ISRU) Science priorities for the first human mission The MHP SSG sees a need/opportunity for further studies in the following areas:

Mars Technology Program 2/17/ Backup Slides Appendices

2/17/2005 Findings of the MHP SSG 43 MHP SSG Introduction MHP SSG Timeline MEAS. TEAM T/I TEAM ADV. STUDIES June 25 July MEPAG meeting Aug.Sept.Oct. Aug. 3-4 Nov.Dec. MEPAG Meeting July 2 July 7 Focus Teams Deliver Interim results Sep. 3 Study Teams analysis Oct. 1 Jan.Feb. Scoping Dec. 1 Workshop Documentation, refinement Synthesis Sep Workshops Feb

2/17/2005 Findings of the MHP SSG 44 Define the investigations and measurements that will address the high priority risks. For all Measurements: Required precision and detection limit How many places or times? Sequential relationships Measurement Team Introduction Define Investigations, Measurements

2/17/2005 Findings of the MHP SSG 45 Hazard - A state or condition that could potentially lead to undesirable consequences. Risk - The combination of 1) the probability (qualitative or quantitative) and associated uncertainty that a program or project will experience an undesired event; and 2) the consequences, impact, severity and/or associated uncertainty of the undesired event were it to occur. Opportunity - A state or condition that could potentially lead to desirable consequences. Condition: The key circumstances, situations, etc., that are causing concern, doubt, anxiety, or uncertainty. In a risk statement, the condition phrase is the phrase at the beginning of the statement. Consequence: The possible negative out comes of the current conditions that are creating uncertainty. In a risk statement, the consequence phrase is the phrase at the end of the statement. Context: Context provides additional detail regarding the events, circumstances, and interrelationships within the project that may affect the risk. This description is more detailed than can be captured in the basic statement of risk. Impact: The loss or effect on the project if the risk occurs. Impact is one of the three attributes of a risk. A risk that does not impact an objective is not particularly important to a project manager. A risk that can affect the objective should be assessed and, if possible, it's impact quantified. Qualitative judgments such as low, moderate and high- risk impacts are useful in some cases. The impact is traditionally described in two dimensions, it's likelihood of occurring and the impact on an objective should it occur. Definitions