SVTRAD Upgrades M. Bruinsma1Sept. 22nd 2003 SVTRAD Upgrades M. Bruinsma September 22, 2003 Background Workshop, SLAC Motivation.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
UNIVERSITA’ DEGLI STUDI DI NAPOLI FEDERICO II Luigi Cimmino November 12 th, Tokyo INTERNATIONAL WORKSHOP ON MUON & GEO-RADIATION PHYSICS FOR EARTH.
HCC Analog Monitor HCC Design Review April 24, 2014 Mitch Newcomer Nandor Dressnandt Aditya Narayan Amogh Halergi Dawei Zhang* * Original design work
Oscilloscope Watch Teardown. Agenda History and General overview Hardware design: – Block diagram and general overview – Choice of the microcontroller.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Using FPGAs with Embedded Processors for Complete Hardware and Software Systems Jonah Weber May 2, 2006.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Pierpaolo Valerio.  CLICpix is a hybrid pixel detector to be used as the CLIC vertex detector  Main features: ◦ small pixel pitch (25 μm), ◦ Simultaneous.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
U.B. Presentation October Bernard COURTY L.P.C.C. College de France - Paris.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
IPHC-LBNL meeting 3-5 April 2008 Radiation damage in the STAR environment and performance of MAPS sensors Compilation of different test results mostly.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
5/9/03Andrei Sukhanov. Phobos BWMeeting1 Andrei Sukhanov – measurements, analysis Ioury Sedykh – software, calculations Piotr Kulinich – measurements,
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Chip design and mass test system development Y. Kwon (Yonsei Univ.)
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
DAQ ELECTRONICS 18 March 2015MEG Collaboration Meeting, Tokyo Stefan Ritt.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
New Coil Drivers Time Line Alberto Gennai I.N.F.N. Pisa.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
Organization for Micro-Electronics desiGn and Applications HGCAL Front-End Electronics Christophe de LA TAILLE, Marcello MANNELLI sept 2015.
ASICs1 Drain Current Digitizer Chip (DCD) Status and Future Plans.
DCFEB Production for LS2
Belle-II VXD radiation monitoring and beam abort with sCVD diamond sensors Lorenzo Vitale, Belle-II SVD collaboration INFN and Univ. Trieste, ITALY Requirements.
Alternative FEE electronics for FIT.
IR detector for demonstrator and Readout
Status of the Beam Phase and Intensity Monitor for LHCb
Summary: Workshop on CMS Beam Conditions, Radiation Monitoring and Luminosity Systems Oliver Stein, May 2013, CERN.
A First Look J. Pilcher 12-Mar-2004
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Radiation Abort Policy
Presentation transcript:

SVTRAD Upgrades M. Bruinsma1Sept. 22nd 2003 SVTRAD Upgrades M. Bruinsma September 22, 2003 Background Workshop, SLAC Motivation Diamond sensors Readout electronics upgrade: SVTRAD1.5

SVTRAD Upgrades M. Bruinsma2Sept. 22nd 2003 Purpose of SVTRAD 1.Monitor radiation levels and 2.Protect the SVT from excessive and avoidable radiation damage: a)Acute radiation damage: P-stops, blocking capacitor breakdown May occur at acute doses of 1 rad or more Should be detected within ~ 1 ms: “fast aborts” b)Long-term radiation damage: Leakage current increase in Si bulk Noise increase, gain reduction in readout electronics Significant degradation expected after 5Mrad. SVTRAD should keep total dose of SVT modules below 4Mrad Time scale: seconds (monitoring) – minutes (“slow aborts”) – years These are two very distinct protection tasks, both done by SVTRAD.

SVTRAD Upgrades M. Bruinsma3Sept. 22nd 2003 Problems with the current system 1.Uncertainty in pedestal (=‘leakage’=‘dark’) current of PIN diode: accuracy ~0.1% => 3nA for 3  A dark current ~ radiation current (15mrad/s) This mainly affects the slow (‘software’) aborts 2.Secondary problems/limitations – SVTRAD board mid-plane diode radiation currents only accurate after long averaging feedback to PEP-II of (mid-plane) radiation levels rather slow (few s) PIN diode is either ‘abort diode’ or ‘monitoring diode’ Abort logic not very flexible Electronic problems (ground fluctuations, etc.) Board-temperature dependencies Upgrade strategy: 1.Replace damaged sensors with CVD diamond sensors in 2005 (=a.s.a.p.) 2.Upgrade readout electronics in end of 2003 (=a.s.a.p)

SVTRAD Upgrades M. Bruinsma4Sept. 22nd 2003 CVD diamond sensors From ‘operational’ point of view, diamond sensors are similar to PIN diodes: similar sizes obtainable (10x10x0.5mm) similar current levels due to radiation ( pC/mrad) faster response times (ns) higher bias : 500V for pcCVD diamond, 100 V for scCVD diamond (50V for PIN diodes) Diamonds have (virtually) no leakage currents, even after irradiation They are very radiation-hard Have been installed in BaBar and routinely read out with SVTRAD1 board: Proven to be suitable alternative Minor (non-critical) to be understood (current tails, E x B effect) The use of diamond sensors will eliminate the largest systematic uncertainty of the SVTRAD system

SVTRAD Upgrades M. Bruinsma5Sept. 22nd 2003 Electronics Upgrade: SVTRAD1.5 Motivation for SVTRAD1.5: Compatible with future diamond sensor operation (500V bias) Enhanced functionality, improved diagnostic power & flexibility in abort decisions Improved precision on temperature- and current-measurement Elimination of electronics problems of current readout board Ensure sufficient spare boards for running until 2010 (no working spares) Note: SVTRAD1.5 will not solve the leakage current problem – diamonds will. (but it may reduce it)

SVTRAD Upgrades M. Bruinsma6Sept. 22nd 2003 Conceptual overview of SVTRAD1.5 Diode current front-end (opamps, ADCs) Temp. measurement +switch Abort & monitoring logic (FPGA(s) + EPROM) MCU + CAN & RS232 fibers display (LEDs) PEP HTEMP analog mon. (DACs) JTAG abort monit. I diode V bias scope IOC temp thermistors Diodes/diamonds V therm I therm on-board thermistors SVT p.s.

SVTRAD Upgrades M. Bruinsma7Sept. 22nd 2003 Analog outputs for fast monitoring SVTRAD1.5 ‘SVTRAD-DAC’ module: ~1kHz update rate per channel 4 quad DACs with SPI interface AD5544, 16 bit precision NIM module Installed in alcove near PEP-II electronics SVTRAD1.5 optical fibers, 3 per board Digital SPI interface to (quad) DAC (SCLK, CS, DIN) 12 analog diode signals (1kHz) to PEP-II SAM: leakage current subtracted => radiation levels Benefits: Fast feedback to PEP-II operators 1kHz rate can be used to study individual injection pulses

SVTRAD Upgrades M. Bruinsma8Sept. 22nd 2003 More flexibility in fast abort decisions All logic integrated into single FPGA: can make an abort decision based on a combination of sensors (MID,TOP,BOT) Abort channel current measurement modified from VFC -> ADC: could include non-linear terms in temperature correction (more precise) could include time-dependence of radiation levels in abort decision, e.g. prevent abort if radiation levels decreasing could prevent abort decision if dose rate over threshold not hazardous for acute damage (i.e. << 1rad/ms) (it then becomes mainly a radiation budget issue) 2ms Dose rate time 0 threshold rate: 1000 mrad/s abort if dose over threshold:~2.5 rad

SVTRAD Upgrades M. Bruinsma9Sept. 22nd 2003 Other benefits of front-end upgrade 1.All diodes are both ‘monitoring’ diodes and ‘abort’ diodes 2.Better precision on abort channel (monitoring channel the same) 3.Both ranges completely ‘tunable’: monitoring range extended (7.8  A -> 15  A) for larger leakage currents abort range extended (0.5mA->5mA) (may be lowered for better precision) 4.Faster abort decisions (1ms ->100  s) possible 5.Better (x100) precision on monitoring of ‘abort channel’ (no rerouting) 6.Can store history of abort ADC values: better verification of abort decision good fast-history of abort channel currents Not fully-explored option: Issue fast hardware ‘warning’ signal that would automatically undo latest change in optics before it causes the beams to be aborted. Additional (optical) output has been added to SVTRAD1.5 to enable this

SVTRAD Upgrades M. Bruinsma10Sept. 22nd 2003 Status, Time schedule & commissioning Present status of SVTRAD upgrade: SVTRAD1.5 readout board designed, layout of PCB started First board ready for testing in November SVTRAD-DAC module designed, layout done, PCB being produced. Electronics upgrade has been endorsed by Review Committee (July 23 rd ) Commissioning strategy: 1.Lab tests (November/December) Check contacts, FPGA firmware, calibration with current-source, optimization of temperature corrections, test abort logic, fast history 2.Tests with installed diodes/diamonds (December/January) Connect to BE diodes, routed to electronics hut, separate IOC Long-term stability, check abort decisions, correlate with other sensors 3.Installation in IR2 during access (first replace BE board, then others)

SVTRAD Upgrades M. Bruinsma11Sept. 22nd 2003 For more information … Review document: BAD339: "SVT Radiation Protection: Upgrade Requirements & Scenarios" Upgrade website (links to talks, documentation, etc): Design materials of SVTRAD1.5: SVTRAD15/SVTRAD15_design.html Design materials of SVTRAD-DAC: SVTRADDAC/SVTRADDAC_design.html Review materials (talks, etc.): SVTRAD15_Review_Jul2003/