MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, 2012 1R. Carcagno - MICE CC Testing at Fermilab3/19/2012.

Slides:



Advertisements
Similar presentations
Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
Advertisements

MICE Coupling Coil Testing at Fermilab MICE Collaboration Meeting Ruben Carcagno March 15, R. Carcagno - MICE CC Testing at Fermilab3/15/2012.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
MICE Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Steve Gourlay Steve Virostek Lawrence Berkeley National Lab Steve Gourlay Steve Virostek Lawrence Berkeley National Lab MICE.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
An SRF Single Cavity Horizontal Test Facility Tom Peterson, Fermilab May 10, 2005.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
TD Designs for mu2e Solenoid Magnets Michael Lamm for the Mu2e Collaboration and TD/Magnet Systems Dept. All Experimenters’ Meeting January 25, 2010.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE Coupling Coil Test Proposal Ruben Carcagno Fermilab July 9, MICE CC Test Proposal7/11/2011.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
MICE CC TEST, IN PROGRESS M. Tartaglia For the FNAL/LBNL Test Team 9/27/13.
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
MICE Coupling Coil Update
as a prototype for Super c-tau factory
Presentation transcript:

MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012

Muon Ionization Cooling Experiment 3/19/2012R. Carcagno - MICE CC Testing at Fermilab2 Coupling Coil #1 Coupling Coil #2 Spectrometer Solenoid #1 Spectrometer Solenoid #2 The MICE Program has an urgent need to test the MICE CC cold mass assembly Supporting this test is a high Fermilab priority Organizations involved supporting this test are the Accelerator Physics Center, Technical Division, Accelerator Division, and Lawrence Berkeley National Lab

Coupling Coil 3/19/2012R. Carcagno - MICE CC Testing at Fermilab3 Provides a magnetic field to a 201 MHz RF cavity Magnetic field is needed to keep the muon beam within the iris of the RF cavities

MICE CC Assembly 3/19/2012R. Carcagno - MICE CC Testing at Fermilab4 First Coupling Coil has been delivered to LBNL from China

Test Objectives Train the coil to 210 A – Should not take a large number of training quenches (less than 10 to 15 quenches) Hold maximum current for 24 hours Conduct thermal cycle and verify training holds Very aggressive schedule: MICE has urgent programmatic needs, test results needed by end of August 2012 There will be a total of 4 Coupling Coils to be tested: one for MTA, two for MICE, and one spare 3/19/2012R. Carcagno - MICE CC Testing at Fermilab5

MICE CC Assembly Preparation To be installed by LBNL: – Cooling Tubes – Coil Quench Protection system. Coil cannot be tested without cold diodes and cold resistors! – Mechanical Supports – Heater to induce quench – Instrumentation (Temperature sensors, voltage taps) Need to be completed by end of April /19/2012R. Carcagno - MICE CC Testing at Fermilab6

Test Cryostat 3/19/2012R. Carcagno - MICE CC Testing at Fermilab7 Built by Meyer Tool in 1997 for SMES, never used Recently transferred from NHMFL/FSU to Fermilab for this use Requires several modifications 11.8 ft. 10 ft.

Removing Background Coil at NHMFL Background coil was removed prior to shipping to Fermilab and it was disposed in Florida 3/19/2012R. Carcagno - MICE CC Testing at Fermilab8

Cryostat Modifications 3/19/2012R. Carcagno - MICE CC Testing at Fermilab9

Test Site: Central Helium Liquefier Locations considered: IB1, CDF, and CHL CHL (South Annex) was recommended Fermilab management directed AD and TD to proceed with CHL location recommendation on February 17, 2012 and make it a high priority 3/19/2012R. Carcagno - MICE CC Testing at Fermilab10

CHL Test Area Cryostat was already moved to CHL test area location Preliminary vacuum vessel leak check in progress Calculation of forces due to fringe magnetic field interaction with building ferromagnetic elements in progress (V. Kashikhin) 3/19/2012R. Carcagno - MICE CC Testing at Fermilab11

Systems Cryogenic System – Forced 2-phase conduction cooling supplied to cryostat from nearby 10,000 gallon CHL LHe dewar, refilled as needed by CHL liquefier DAQ and Control – Based on proven technology in use at the IB1 Magnet Test Facility Power – Power supply provided by LBNL 3/19/2012R. Carcagno - MICE CC Testing at Fermilab12

Preliminary Schedule Technically driven, attempts to meet MICE urgent programmatic needs Coil must be received by end of April 2012 Assumes availability of skilled resources (4 FTEs in 6 months!) This schedule will be very tough to meet! 3/19/2012R. Carcagno - MICE CC Testing at Fermilab13

A “Solenoid Test Facility” at FNAL This the first step towards a “Solenoid Test Facility” at Fermilab Will provide a much needed capability for testing large bare superconducting solenoids in the United States Example of other uses: test of mu2e transport section modules and PS prototype – Must add a large DC power system and vapor-cooled current leads 3/19/2012R. Carcagno - MICE CC Testing at Fermilab14

Summary All elements are in place to proceed with a MICE CC Test Stand installation at CHL. No technical issues: technology well understood and based on prior experience Critical project elements: tight schedule, complex interfaces, and availability of skilled people – Must be given very high priority at LBNL, FNAL/AD, and FNAL/TD – Must make sure scope is kept to a minimum – Still, schedule is very optimistic! Substantial additional effort needed to test mu2e Toshiba PS Prototype and TS coils, but most MICE CC setup is directly applicable for testing these other solenoids This is the first step in the development of a “Solenoid Test Facility” at Fermilab 3/19/2012R. Carcagno - MICE CC Testing at Fermilab15