Substation Maintenance Cascade Software Application APPA E & O Conference, San Antonio TX March 8,2004 . Joe Bryson - Director Substation Operations City Utilities of Springfield, Missouri
Substation Group A brief overview 15 Electricians, 3 Technicians and 2 Supervisors 42 Substations, 3 Power Generation Facilities 200 Large Power Transformers 415 Power Circuit Breakers Repair Shop for Distribution Transformers Duties include Construction, Operations and Maintenance
Maintenance Tracking History ASSET system - Not Y2K compliant Time base maintenance or RTF Incomplete material history Limited inspection capability Difficult to change equipment or procedures
Why did City Utilities select CASCADE ? Designed for Substation Use
Cascade Navvigator
Why did City Utilities select CASCADE ? Designed for Substation Use Easy to learn and use System setup and changes are simplified Inspection versatility Field access to data
Asset Management with Cascade Comprehensive equipment listing with nameplate information
Cascade nameplate info
Cascade maintenance history
Cascade Maintenance comments
Asset Management with Cascade Equipment maintenance history Maintenance comments Specific maintenance triggers LTC tap changes per/day <0 or >20 motor run time > .2 hours per/day Historical reports Breaker operations & relay targets
Cascade breaker operations & relay targets
Asset Management with Cascade Equipment maintenance history Maintenance comments Specific maintenance triggers LTC tap changes per/day <0 or >20 motor run time > .2 hours per/day Historical reports Breaker operations & relay targets LTC operational history
Cascade LTC operation history
Field Units Mobile computing
Field Units Mobile computing Field Personnel can view Equipment List Nameplate information Maintenance and inspection history Work orders including maintenance procedures
Cascade work orders including maintenance procedures
Field Units Field Inspections at any location
Cascade Inspection
Field Units Mobile computing Field Personnel can view Equipment List Nameplate information Maintenance and inspection history Work orders including maintenance procedures Field Inspections at any location Data transfer
Cascade data transfer
Employee Time Entry and Records Employees enter all productive and nonproductive time Time can be entered for one person or a whole crew
Cascade productive and nonproductive time sheet
cascade crew time entry
Employee Time Entry and Records Employees enter all productive and nonproductive time Time can be entered for one person or a whole crew Time sheets can be printed or electronically transmitted to company payroll department Statistical Maintenance Summaries
Some Lessons Learned Have an implementation plan and use a team approach Spend time training personnel Computer training first if necessary CASCADE specific training Designate someone to be the responsible custodian of the system