Project specifications Division 1- general conditions Division 2- sitework Division 3- concrete Division 4- masonry Division 5- metals Division 6- carpentry.

Slides:



Advertisements
Similar presentations
Objective Construct a carpentry project. Constructing a Carpentry Project Purpose of constructing a project in agricultural mechanics shop is to.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Building Codes, Zoning Ordinances
Special Inspections
Carriage house expansion at the Grover Cleveland birthplace
Presented by: Derrick Castle, PCS Kentucky Transportation Cabinet Writing a Good Specification for Bridge Painting.
Codes & Standards.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET OLIN.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Los Alamos NATIONAL LABORATORY 6/25/02, Sheet 1 UniFormat, OmniClass, MasterFormat UNIFORMAT II -- an org system for building “Elements” Elements: foundation;
Division 08-Openings ARCH 330 Fall Master Format OPENINGS Operation and Maintenance of Openings Schedules for Openings
Testing & Inspection Services - REF March 10,2010 Preproposal Presentation.
MasterFormat™ April 7, 2005 Kevin R. Miller.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Objectives To become familiar with a set of Construction Specifications; 1)Their layout and format. 2)The terms and definitions used and their legal ramifications.
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
MasterFormat™ March 17, 2004 Kevin Miller.
Study of Top 500 Design Firms’ Plans to Adopt MasterFormat™ 2004 Kevin R. Miller, Ph.D. D. Mark Hutchings, Ph.D. Brigham Young University.
ESTIMATING By Laith Jacob.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
1 CE 303: Introduction to Construction Blueprint Lab.
Design & Layout of Foodservice Facilities
Construction Contract Documents
Foodservice Equipment, Part I Chapter 6. Chapter 6 Overview This Chapter:  Describes the basis for selecting foodservice equipment  Outlines the standards.
BUILDING WITH THASTYRON
RICHARD BROWN UPF Procurement Director October 31, 2013.
Interior Construction
Construction Specifications Foreman’s Development Series
Division 17/25 Organizational Model for Technology and Communication Systems “What has changed – What has not” James C. Waddell, RCDD Formare Technica,
Reading & Interpreting a Specs - Learn how to read (interpret) a spec. - Bid the most competitive product - Generate more business…
Community Manager Role Profit & Loss leader with responsibility for the overall planning, coordination, and management of a community in order to produce.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
1 Project Planning Faculty of Applied Engineering and Urban Planning Civil Engineering Department Week 4 2 nd Semester 2008/2009 UP Copyrights 2008 Construction.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Formats ACT 380.
CVE 4070 Construction Engineering Contract Documents Prof. Ralph V. Locurcio, PE.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
COURSE INTRODUCTION ARE 459 BY CONTRACTS AND SPECIFICATIONS
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Preliminary Project Descriptions/Outline Specifications
Application – Identifying, Listing Equipment, and Documentation
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
A few different things… ID 206 construction + materials II.
Standards, Training, and Certification in the Wastewater Industry Presented by: Bob Murphy, Sherwin Williams.
Section drawings know standard construction finish attachment and dimension custom fabrications 1.
Welcome CUTTING TO THE CHASE Identifying opportunities to reduce cost.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
Edward Colligon Doug Watson Brett Reisker Opeyemi Ositelu Hong Jie Chen.
Acoustical Metal Pan Ceilings [ ] Tena Pettit.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
The Federal Green Construction Guide for Specifiers Implementing Your Green Building Goals and Mandates Alison Kinn Bennett US EPA Environmentally Preferable.
1 JCI 1 1 An engineer is someone who can do for $5,000 what any damn fool can do for $50,000. Anonymous.
What is MasterFormat?. “MasterFormat is a master list of numbers and subject titles classified by work results or construction practices for organizing.
PROJECT CHRONOLOGY (Refer to Chapter 5).
(Refer to Chapter 2 of the textbook)
What happened to Division 17? and what is CLA?
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Specifications What should it cover Goods Services Warranty
Field Labeling/Evaluation of Openings
Presentation transcript:

Project specifications Division 1- general conditions Division 2- sitework Division 3- concrete Division 4- masonry Division 5- metals Division 6- carpentry Divisions 1-6 are frequently “self’perform”

Project specifications Division 7- thermal and moisture protection Division 8- doors, windows, hardware Division 9 finishes Division 10- specialties Division 11- equipment Division 12- furnishings Division 13- special construction

Project specifications Division 14- conveying systems Division 15- mechanical Division 16-electrical Divisions 7-10, 14 typically subcontracted Divisions typically “by owner” (except fire suppression, sometimes in 15) Divisions 15, 16 subcontracted or multiple prime

Technical subsections Section 0000 –1.0 General- 1.1 work included 1.2 related work 1.3 references (AISI, ASTM, AWS, UL, 1.4 system description (tolerance) 1.5 submittals (finish schedule, samples, O/M) 1.6 quality assurance 1.7 delivery storage protection 1.8 warranties

Technical subsections 2.0 Products –2.1 manufacturers –2.2 materials (composition, thickness) –2.3 accessories and associated materials –2.4 fasteners –2.5 fabrication (sizes, fit, process)

Technical subsections 3.0 Execution –3.1 examination of related work –3.2 coordination of related work –3.3 field inspections –3.4 permits and government compliance –3.5 application and installation –3.6 finish state –3.7 cleaning –3.8 schedule, color, joints, ratings

Project specifications Define the scope of work Necessary for delineation of responsibility in subcontracts and purchase orders Outlines related work and coordination Need to review for overlap of responsibility Need to review for failure to assign responsibility Example at