OICA views on “Thermal Propagation” 1 9 December 2015 OICA EVSTF-06-04e.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

1 Welcome Safety Regulatory Function Handbook April 2006.
Medical Device Software Development
Transition from Q1- 8th to Q1- 9th edition
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
EQUIPMENT VALIDATION.
ISO 9001 : 2000.
Crane Operations Objective
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
The ISO 9002 Quality Assurance Management System
Regulatory Body MODIFIED Day 8 – Lecture 3.
EVS-GTR TF5 Update Progress TF5 task force – thermal propagation 2015/6/4.
Proposal for Management of gas emitted from REESS May, 2014 U.S. DOT Head Quarter 1200 New Jersey Avenue, SE Washington, DG JASIC 1.
Progress report of TFG 7 “Fire resistance test” June 5, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
Low Voltage Directive New Approach. Directive Overview Guidelines on application and Recommendations Safety objectives Documentation LVD standardisation.
Codex Guidelines for the Application of HACCP
BRC Food Safety Quality Management System Training Guide
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Introduction to ISO New and modified requirements.
PRBA – The Rechargeable Battery Association
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Transposition of GTR No.13 “Hydrogen and fuel cell vehicles” into UN Regulation - Explanatory material - 20/September/2013 The European Commission and.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Outline of Definition of Automated Driving Technology Document No. ITS/AD (5th ITS/AD, 24 June 2015, agenda item 3-2) Submitted by Japan.
Important informations
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Related Illustration on thermal propagation Prof. Xiao Chengwei (TF5 team leader) 2015/06/03.
for Thermal Propagation
4.3 Document control 4.4 Review of requests, tenders and contracts
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
1 Washington, Sept 29th, 2014 Informal working group: Large Lithium batteries testing RECHARGE & SAFT.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
Page June 2015 OICA position on venting EVSTF-04-11e.
1 ACSF Test Procedure Draft proposal – For discussion OICA and CLEPA proposal for the IG Group ACSF Tokyo, 2015, June Informal Document ACSF
TF8 work report for 9 th EVS-GTR conference Changchun.
TF5 – Status report on thermal propagation EVS-GTR 9 th IWG meeting Changchun, China 2015/9/17.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
1 Discussion paper on Current Status on TF5 test items Xiao Chengwei.
Progress report about RESS activities Gerd Kellermann, Germany Informal document GRSP (50th GRSP, 6–9 December 2011, agenda item 15)
1 Warning requirement for the management system of the REESS May, 2014 U.S. DOT Head Quarter 1200 New Jersey Avenue, SE Washington, DG JASIC.
Task Force 3: Electrolyte leakage Last update- 19/03/
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
Technology Services – National Institute of Standards and Technology Conformity Assessment ANSI-HSSP Workshop Emergency Communications December 2, 2004.
Progress report of TFG 7 “Fire resistance test” Mar. 3rd, 2016 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Emergency Response For the Hazardous Waste Worker.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
1  Position of China and Japan  The water test should be included in EVS-GTR Phase 1.  Test exemption for vehicles with isolation monitoring system.
TC22 SC37 WG3 Liaison Report for EVS-GTR Thermal Propagation Work Item
Suggestion for Summarizing Process of the Principles
Task Force 3: Electrolyte leakage
Task Force 3: Electrolyte leakage
Electric Vehicles Safety Global Technical Regulation
Informal document GRPE-73-21
Concept of ACSF TAN (Type Approval Number)
Special Provision 188 of IMDG Code 38-16
GTR EVS ‘Thermal propagation testing’ JRC Work Plan
Proposals from the Informal Working Group on AEBS
Japan research of thermal propagation test
OICA Feedback on Proposed Test Procedure
Submitted by the experts of OICA
New Assessment & Test Methods
EVS-06-10e Progress Report on TF5 Nov. 3rd, 2014.
SAE battery safety standards committee UPDATE January 23, 2019
Safety concept for automated driving systems
Radiopharmaceutical Production
CLEPA comments on OBD II GTR 18 Draft
Presentation transcript:

OICA views on “Thermal Propagation” 1 9 December 2015 OICA EVSTF-06-04e

1. Principle  Vehicle/System level assessment is priority  To ensure the safety of vehicle occupants  To allow various level of safety measures 2 All Contracting Parties agree with this principle

2. Definitions – “Thermal runaway” 3 Proposal from Japan (EVSTF-04-23e) “Thermal runaway” means the phenomena of uncontrollable heat generation with continuous temperature rise caused by exothermal chain reaction in the cell. Counterproposal from OICA (NEW) “Thermal runaway” means uncontrolled temperature rise of a cell caused by exothermic chain reaction in the cell. Temperature is within the thermal tolerance of the cell and considered as under control  NOT Thermal runaway -Redundant expressions -Ambiguity Temperature rise exceeds the cell tolerance (=uncontrolled)  Thermal runaway

2. Definitions – “Thermal propagation” 4 Proposal from Japan (EVSTF-04-23e) “Thermal propagation” means the sequential occurrence of thermal runaway within a battery system triggered by thermal runaway of a cell in that battery system.  OICA can support this definition  According to this definition, occurrence of thermal propagation does not necessarily lead to safety critical events because magnitude of the propagation is not considered.  This term should not be used as a pass/fail criteria  Based on the definitions agreed, the applicability of thermal propagation test (if any, to be developed) should be considered.  Cells using aqueous electrolyte (Lead-acid, NiMH, etc.) are unlikely to cause thermal runaway (i.e. requiring exothermic reaction), because decomposition of electrolyte is endothermic reaction

3. Concept of proposed test procedures 5 A) China (EVSTF-04-24e) and Japan (EVSTF-04-23e) proposed similar concept B) US mentioned slightly different concept (EVSTF-03-20e) 1)Install “initiation device” inside the battery pack (= modification of REESS)  Prismatic cell (JP): Device to operate a nail to a cell through battery pack enclosure  Cylindrical cell (CN): Resistive wire surrounding a cell  Pouch cell (JP): Ceramic heater beside a cell (heat shield on another side of heater 2)Operate the initiation device until the cell causes [thermal runaway or internal short-circuit] 3)Monitor the response of the battery pack (e.g. fire, explosion) 1)Install “thermal initiation device” inside the battery pack (= modification of REESS) on the vehicle  Device to cause THERMITE reaction in a controlled manner 2)Operate the initiation device to release thermal energy pre-determined according to the system specification 3)Monitor cabin tenability and hazard to surroundings * Details of the proposed test procedures are not provided and therefore reproduction (validation) of the test procedure by other parties is not possible

4. Concerns 6  Test procedure shall be equally & fairly applicable to different designs and safety concepts  Test procedure shall be practicable, reproducible and repeatable  Manipulation of the test object in a manner that may influence to the designed performance of the system shall be avoided  Test procedures suggested so far are unlikely to satisfy these conditions  Extensive challenges are required to develop satisfactory test procedures  For Phase 1, effective and practical solution is needed

5. Discussions 7 Is “Thermal propagation” really critical?  It is true that existing tests do not specifically address the phenomenon of cell internal short circuit in a REESS  Under UN Transport Regulations*, adequate manufacturing quality control procedures must be implement for Lithium-ion cells  probability of cell internal short circuit event is expected to decrease  Thermal propagation is a transient process that may lead to “Fire” or “Explosion”  Systems designed to meet existing requirements (i.e. no fire/explosion) already have robustness against thermal propagation  All available studies indicate that thermal propagation is not an instantaneous event  Unlike airplane, vehicles can stop in a short period and the occupants can evacuate immediately  Manufacturers are implementing various measures for management and warning of REESS in case of safety critical failures, in order to secure the safe evacuation * UN Recommendations on the Transport of Dangerous Goods - Model Regulations Amendments to the 16th revised edition (2011), sub-section 2.9.4

6. OICA Recommendation 8 1)For Phase 1, effective and practical solution is needed, however detailed development of “Thermal propagation” test should be postponed to phase 2 2)OICA undertakes to explore practicality of providing technical documentation that explains the measures taken for mitigating the risk of thermal propagation for certification purpose (ref. GTR. No.8, paragraph 5.7) 3)Development of “Warning system requirement” will also support this direction 4)Monitor the relevant incident data from the market

9 References

UN Recommendations on the Transport of Dangerous Goods - Model Regulations Amendments to the 16th revised edition (2011) 10 (e) Cells and batteries shall be manufactured under a quality management programme that includes: (i) A description of the organizational structure and responsibilities of personnel with regard to design and product quality; (ii) The relevant inspection and test, quality control, quality assurance, and process operation instructions that will be used; (iii) Process controls that should include relevant activities to prevent and detect internal short circuit failure during manufacture of cells; (iv) Quality records, such as inspection reports, test data, calibration data and certificates. Test data shall be kept and made available to the competent authority upon request; (v) Management reviews to ensure the effective operation of the quality management programme; (vi) A process for control of documents and their revision; (vii) A means for control of cells or batteries that are not conforming to the type tested as mentioned in (a) above; (viii) Training programmes and qualification procedures for relevant personnel; and (ix) Procedures to ensure that there is no damage to the final product. NOTE: In house quality management programmes may be accepted. Third party certification is not required, but the procedures listed in (i) to (ix) above shall be properly recorded and traceable. A copy of the quality management programme shall be made available to the competent authority upon request.

11 GTR No.8 “Electronic Stability Control System” 5.7.ESC System Technical Documentation. To ensure a vehicle is equipped with an ESC system that meets the definition of "ESC System" in paragraph 3., the vehicle manufacturer shall make available to the regulatory entity designated by the Contracting Party, upon request, the documentation specified in paragraphs to System diagram identifying all ESC system hardware. The diagram shall identify what components are used to generate brake torques at each wheel, determine vehicle yaw rate, estimated side slip or the side slip derivative and driver steering inputs A brief written explanation sufficient to describe the ESC system basic operational characteristics. This explanation shall include the outline description of the system's capability to apply brake torques at each wheel and how the system modifies propulsion torque during ESC system activation and show that the vehicle yaw rate is directly determined. The explanation shall also identify the vehicle speed range and the driving phases (acceleration, deceleration, coasting, during activation of the ABS or traction control) under which the ESC system can activate Logic diagram. This diagram supports the explanation provided under paragraph Understeer information. An outline description of the pertinent inputs to the computer that control ESC system hardware and how they are used to limit vehicle understeer.