LBT Q2 2008 Eng/SW Review MCSC – Mount Control System.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Advertisements

LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
Network Design and Implementation
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
J. Large Binocular Telescope (LBT) Operational Readiness
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
The Voice Operated and Wirelessly Controlled Elevator Jeremy Hester Advisor: Mohammad Saadeh Class: ET 493 – 01 Class Professor: Dr. Cris Koutsougeras.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBTO software startup/shutdown and troubleshooting July 18, 2006 Chris Biddick 1 cjb.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
20 October 2008LBT Q Eng/SW Review0 PCS – Pointing Control Subsystem Michele De La Peña.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Engineering Review SAB Static Balancing.
Anjanae Brueland & Janet Wingard.  What is Network Design, Planning & Management?  System Development Life Cycle (SDLC)  The phases of an information.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
21 July 2008 LBT Q Eng/SW Review 1 SIN – Software Infrastructure Titus Purdin.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
T Project Review MalliPerhe Iteration 3 Implementation
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
Troubleshooting Windows Vista Lesson 11. Skills Matrix Technology SkillObjective DomainObjective # Troubleshooting Installation and Startup Issues Troubleshoot.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
HOW TO FIX MSVCR100. DLL IS MISSING ERROR? missing-error.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
Do you Have a Problem For- For-. Techiezoncall.com Techiezoncall.com Offers Online Technical Support To Global Customers, Just
Area Covered. Work Done Quantity Financial Progress of work.
By Wilmer Arellano Spring 2010
Request for Proposal and Selection Procedures
Software Requirement and Specification
Presentation transcript:

LBT Q Eng/SW Review MCSC – Mount Control System

July 21, 2008LBT Q Eng/SW Review2Progress HBS and Rotator support HBS and Rotator support Add variables to Data Dictionary to make available to TCS (done for ROT)‏ Add variables to Data Dictionary to make available to TCS (done for ROT)‏ Add MCSPU commands to MCS to make available to TCS (done for ROT)‏ Add MCSPU commands to MCS to make available to TCS (done for ROT)‏ Numerous Events need to be defined for the Event Logging System (some progress)‏ Numerous Events need to be defined for the Event Logging System (some progress)‏ Alter AZ/EL/ROT Hold commands to stop telescope more gently √ Alter AZ/EL/ROT Hold commands to stop telescope more gently √ Make existing AZ/EL software use/monitor newly available information from the HPLC (not done)‏ Make existing AZ/EL software use/monitor newly available information from the HPLC (not done)‏ Repair ELRL read head √ Repair ELRL read head √ Install ELFR read head preload spring (postponed due to telescope schedule)‏ Install ELFR read head preload spring (postponed due to telescope schedule)‏ Work on punch list for commissioning √ Work on punch list for commissioning √

July 21, 2008LBT Q Eng/SW Review3 Additional Progress HBS and Rotator support HBS and Rotator support We now have a good solution to Siemens Communication problem in hand √ We now have a good solution to Siemens Communication problem in hand √ Test MCSPU Rotator Cable Chain software. (mostly done)‏ Test MCSPU Rotator Cable Chain software. (mostly done)‏ Improved MCS elHold and azHold commands √ Improved MCS elHold and azHold commands √

July 21, 2008LBT Q Eng/SW Review4 Open Issues Technical Technical Encoder reset is not as reliable as it should be (probably a hardware issue). Encoder reset is not as reliable as it should be (probably a hardware issue). AZ/EL start-up procedure not as reliable as it should be (probably a TPLC issue). AZ/EL start-up procedure not as reliable as it should be (probably a TPLC issue). ELFR main encoder read head preload spring is missing ELFR main encoder read head preload spring is missing Software stopped using the elevation strip encoder - issue 1326 (broke while implementing ROT)‏ Software stopped using the elevation strip encoder - issue 1326 (broke while implementing ROT)‏ Cleanup necessary for commissioning Cleanup necessary for commissioning Schedule Schedule None None Financial Financial None None Resource Resource MCS competing for engineering resources MCS competing for engineering resources

July 21, 2008LBT Q Eng/SW Review5 Planning Make existing AZ/EL software use/monitor newly available information from the HPLC Make existing AZ/EL software use/monitor newly available information from the HPLC Fix bug that caused elevation to ignore the strip encoder Fix bug that caused elevation to ignore the strip encoder Install preload spring on ELFL encoder Install preload spring on ELFL encoder