0 Tilman Drath, Ingo D. Kleinhietpaß, Marco K. Koch Lehrstuhl für Energiesysteme und Energiewirtschaft (LEE) Ruhr-Universität Bochum (RUB) 11 th International.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Nuclear Reactors, BAU, 1st Semester, (Saed Dababneh). 1 Multi-group Model Wide neutron spectrum. One-group, two-group? Should be generalized.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Adding value through knowledge © NNC Limited September 2002International PHOENICS User Conference 1 A PHOENICS model of the hotbox region of an advanced.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft 1 J. Stuckert, FZK/IMF-III11 th International QUENCH Workshop, Karlsruhe, October 25-27, 2005.
(1) Die Kooperation von Forschungszentrum Karlsruhe GmbH und Universität Karlsruhe (TH) 0 | Transient Analysis for the EFIT 3-Zone Core P. Liu, X.-N. Chen,
Forschungszentrum Karlsruhe Technik und Umwelt IRS /FzK W.M.SchikorrEUROTRANS WP1.5 Safety Meeting : Madrid, Nov EFIT Design and Transient.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft M. Steinbrück, FZK/IMF-I 11th Int. QUENCH Workshop, Karlsruhe, October 25-27, Oxidation.
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
The Fukushima Daiichi Incident – Dr. Matthias Braun - 04 June p.1.
ACADs (08-006) Covered Keywords Defense-in-depth, reactor protection system, solid state protection system, reactor trips, Engineered Safety Feature System.
25-27/10/2005, 1 Laboratory for Thermal Hydraulics Nuclear Energy and Safety 11th QUENCH Workshop, FZ Karlsruhe Calculational Support for the QUENCH-10.
ABC Technology Project
VOORBLAD.
Squares and Square Root WALK. Solve each problem REVIEW:
1 ENERGY Gr. 5 Science: Conservation of Energy & Resources BY Full Name Science Unit PowerPoint Outline by Miss Berndl 2009.
© 2012 National Heart Foundation of Australia. Slide 2.
Addition 1’s to 20.
25 seconds left…...
Mo-i-Rana - September 2002 Dam-break floods and sediment movement 1 IMPACT - WP4 Dam-break induced floods and sediment movement IMPACT - WP4 Dam-break.
Week 1.
We will resume in: 25 Minutes.
PSSA Preparation.
OVERVIEW - RELAP/SCDAPSIM
Three Mile Island (TMI-2)
INRNE-BAS MELCOR Pre -Test Calculation of Boil-off test at Quench facility 11th International QUENCH Workshop Forschungszentrum Karlsruhe (FZK), October.
Jiří Duspiva Nuclear Research Institute Řež, plc. Nuclear Power and Safety Division Dept. of Reactor Technology 11 th International QUENCH Workshop Karlsruhe,
ACADs (08-006) Covered Keywords Pressurized Water Reactor (PWR), Boiling Water Reactor (BWR), primary loop, reactivity, reactivity control, reactivity.
1 Application of the SVECHA/QUENCH code to the simulation of the QUENCH bundle tests Q-07 and Q-08 Presented by A.V.Palagin* Nuclear Safety Institute (IBRAE)
PRACTICAL EXAMPLES OF THE ANALYSIS OF SEVERE ACCIDENTS Presented Dr. Chris Allison Regional Workshop on Evaluation of Specific Preventative and Mitigative.
Analysis Simulator for Kozloduy NPP Units 5 and 6 N.Rijova (ENPRO Consult), J.Steinborn (GRS mbH) International Nuclear Forum BULGARIAN NUCLEAR ENERGY.
Institute for Electric Power Research Co. International Workshop On Level 2 PSA and Severe Accident Management Cologne, Germany 29.
October 25-27, th International QUENCH Workshop 1 Top Flooding Experiments and Modeling Estelle Brunet-Thibault (EDF), Serge Marguet (EDF)
Nuclear Plant Systems ACADs (08-006) Covered Keywords
Nuclear Power Dylan Waybright Kendall Caminiti Gina Raimondo Susan Ellington Paige Urbanovsky.
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
Overview of Conventional 2-loop PWR Simulator. PCTRAN Dr
Chapter 4 Nuclear Energy. Objectives Describe how nuclear fuel is produced. List the environmental concerns associated with nuclear power. Analyze the.
Types of reactors.
J. Eyink*, T. Froehmel**, H. Loeffler*** *Framatome-ANP GmbH, Erlangen, Germany **Bundesamt für Strahlenschutz (BfS), Salzgitter, Germany ***Gesellschaft.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Role of the TSO in Public Information/ Debate Openness, Transparency.
By Matt Douglass.  The Three Mile Island accident was a partial nuclear meltdown which occurred in one of the two Three Mile Island nuclear reactors.
Worldwide Commercial Energy Production. Nuclear Power Countries.
Nuclear Thermal Hydraulic System Experiment
ERMSAR 2012, Cologne March 21 – 23, 2012 ESTIMATION OF THERMAL-HYDRAULIC LOADING FOR VVER-1000 UNDER SEVERE ACCIDENT SCENARIO Barun Chatterjee 1, Deb Mukhopadhyay.
ERMSAR 2012, Cologne March 21 – 23, 2012 MELCOR Severe Accident Simulation for a “CAREM-like” Integral Reactor M. Caputo, J. M. García, M. Giménez, S.
ERMSAR 2012, Cologne March 21 – 23, 2012 CONDUCT AND ANALYTICAL SUPPORT TO AIR INGRESS EXPERIMENT QUENCH-16 J. BIRCHLEY 1, L. FERNANDEZ MOGUEL 1, C. BALS.
ERMSAR 2012, Cologne March 21 – 23, 2012 Pretest Calculations of QUENCH-DEBRIS-0 Test Using SOCRAT/V3 Code V ASILIEV A.D. N UCLEAR S AFETY I NSTITUTE OF.
ERMSAR 2012, Cologne March 21 – 23, 2012 In-vessel retention as retrofitting measure for existing nuclear power plants M. Bauer, Westinghouse Electric.
Results of First Stage of VVER Rod Simulator Quench Tests 11th International QUENCH Workshop Forschungszentrum Karlsruhe October 25-27, 2005 Presented.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft FZK, H & HQWS11, KA, Analysis and Comparison of Experimental Data of QUENCH-07.
Ta’Juan Dutrieuille November 4, 2009 Period 1
ERMSAR 2012, Cologne March 21 – 23, 2012 OECD Benchmark Exercise on the TMI-2 Plant: Analysis of an Alternative Severe Accident Scenario G. Bandini (ENEA),
ERMSAR 2012, Cologne March 21 – 23, 2012 ASTEC V2.0 rev 1 Reactor Applications French PWR 900 MWe Accident Sequences Comparison with MAAP4 V. Lombard,
ERMSAR 2012, Cologne March 21 – 23, 2012 Post-test calculations of CERES experiments using ASTEC code Lajos Tarczal 1, Gabor Lajtha 2 1 Paks Nuclear Power.
- Condensate pump and feed pump trip!
- Condensate pump and feed pump trip!
R. B. Vilim Argonne National Laboratory
Presentation transcript:

0 Tilman Drath, Ingo D. Kleinhietpaß, Marco K. Koch Lehrstuhl für Energiesysteme und Energiewirtschaft (LEE) Ruhr-Universität Bochum (RUB) 11 th International QUENCH Workshop Forschungszentrum Karlsruhe, October 25-27, 2005 Analysis of the TMI-2 Accident Using ATHLET-CD

1 Outline TMI-2 Accident ATHLET-CD Short Description Modelling with ATHLET-CD Calculational Results Conclusions

2 TMI-2 Accident Three Mile Island Unit 2 (TMI-2): was planned by a number of organisations (i.e. Babcock & Wilcox Inc.), is banked on the named-giving island in the midst of the Susquehanna River near Harrisburg, USA, beside Unit 1 being still in commercial operation since September 1974, was completed as 2-Loop American PWR, and started operation in the end of 1978 with an electrical power of 0.9 GW el and a thermal power of 2.7 GW th. Google Earth

3 TMI-2 Accident The TMI-2 accident was initiated by problems on the secondary side of the plant. These problems finally led to: the loss of the main feed water pumps and the turbine, an insufficient low heat dissipation in the steam generators, as well as a rise of the primary pressure, and finally the reactor shutdown on the 28 th of March 1979 at 04:00:37 h local time.

4 TMI-2 Accident Sequence of Events and Primary Pressure History PORV Failure!

5 TMI-2 Accident Postulated Configurations of the TMI-2 Core Before Reflood (174 min) After Reflood and before Relocation (224 min) Endstate Configuration

6 ATHLET-CD Short Description ATHLET-CD:Analysis of THermal-hydraulics of LEaks and Transients – Core Degradation The code is being developed by the Gesellschaft für Anlagen und Reaktorsicherheit (GRS) mbH in Germany. It deals with the analysis of anticipated and abnormal plant transients, small and intermediate leaks, as well as large breaks in LWRs. The ATHLET code covers the spectrum of design basis and beyond design basis accidents (without core degradation) for PWRs and BWRs. The CD part represents an add-on to ATHLET with modules describing core melting, fission product release, as well as fission product and aerosol transport processes in the primary system. Modular structured Code ATHLET-CD

7 ATHLET-CD Short Description Gesellschaft für Anlagen und Reaktorsicherheit (GRS) mbH Modular Structure of ATHLET-CD

8 Modelling of the TMI-2 Accident ATHLET-CD Nodalisation of the Plant Loop A Loop B

9 Modelling of the TMI-2 Accident ATHLET-CD Nodalisation of the Core ROD1 (Inner Ring) ROD2 ROD3 ROD4 (Outer Ring) Core Reflector Bypass Bypass Cross Connections

10 Results of the TMI-2 Calculations Calculated and Measured Primary Pressure History B-Pump Transient High Pressure Injection End of run using MESOCO! Heat transfer to the coolant is over-predicted due to the under-estimation of core degradation because of still missing late phase models.

11 Results of the TMI-2 Calculations Calculated and Measured Leakage Mass (PORV) The mass flow rate is calculated with the critical discharge model and shows a qualitative good result of the accumulated leakage mass. Measuring inaccuracy during the trip due to the operation beyond design limits.

12 Results of the TMI-2 Calculations Calculated and Measured Pressuriser Water Level Calculated mixture and water level only differ, if the PORV (block valve) is opened, which means a good reproduction of the pressuriser behaviour. Measuring inaccuracy during the trip due to the operation beyond design limits.

13 Results of the TMI-2 Calculations Calculated Water-/Steam Distribution History

14 Results of the TMI-2 Calculations Calculated and Postulated Core Configuration before Reflood (174 min)

15 Results of the TMI-2 Calculations Calculated and Postulated Core Configuration after Reflood and before Relocation (224 min) Debris bed and molten pool behaviour are not calculable at present!

16 Results of the TMI-2 Calculations Calculated History of the Core Configuration

17 Results of the TMI-2 Calculations Calculated and Measured Hydrogen Production The H 2 generation is under-predicted during the reflood due to: 1.) fuel rod failure and material relocation into deeper core sections, 2.) temperatures being too low to contribute significantly to the oxidation rate in the lower core regions, 3.) no access of the coolant to the melt because of blockage formation.

18 Results of the TMI-2 Calculations Calculated Outer Oxide Layer Thickness (240 min) Fuel rod failure: ROD1 and ROD2! Permanent water level!

19 Results of the TMI-2 Calculations Calculated Fission Product and Structure Material Transport into the Primary System (240 min) Transport Rate [%] of Initial Inventory Group of Species ATHLET-CD 2.0A/1.1K Estimation of Akers et al. (Nuclear Technology, Vol. 87, pp ) I, Cs, Xe53 %50 % Te, Sb5 % 1.6 % (available for Sb only) Sr3 %3.5 % U, Ag-St0.4 %-

20 Conclusions The thermal-hydraulics are predicted quite well compared to the TMI-2 data, especially if the measuring inaccuracy during the trip due to the operation beyond design limits is taken into account. The core configurations are calculated in good agreement compared to the postulated status of the core at ascertained times of the sequence. The H 2 generation is under-predicted during the reflood because of fuel rod failure and material relocation into deeper core sections, where the temperatures are too low to contribute significantly to the oxidation rate. Additionally, no access of the coolant to the melt exists because of blockage formation. The calculated fission product and structure material release as well as their transport in the primary system represent plausible results. The calculation of the TMI-2 accident using ATHLET-CD in the current program version 2.0A/1.1K shows a good overall code performance. But the code has, of course, still a potential of improvements in modelling physical phenomena especially concerning the late phase of core degradation and the behaviour and coolability in the lower head.

21 Acknowledgement This work is sponsored by the German Federal Ministry of Economics and Labour (BMWA ). The authors thank for support and interpretational hints from Dr. Klaus Trambauer (GRS mbH). Special thanks to all colleagues from the FZK for hosting the QUENCH Workshop.

22 Tilman Drath, Ingo D. Kleinhietpaß, Marco K. Koch Lehrstuhl für Energiesysteme und Energiewirtschaft (LEE) Ruhr-Universität Bochum (RUB) 11 th International QUENCH Workshop Forschungszentrum Karlsruhe, October 25-27, 2005 Analysis of the TMI-2 Accident Using ATHLET-CD