Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The Expanded Very Large.

Slides:



Advertisements
Similar presentations
1 National Radio Astronomy Observatory The EVLA -- Status, Future Rick Perley National Radio Astronomy Observatory.
Advertisements

May 22/ SAGE Meeting1 EVLA Hardware Systems: Status and Prognosis Rick Perley.
Thirteenth Synthesis Imaging Workshop 2012 May 29– June 5 Planning VLA Observations: Tutorial Michael P. Rupen NRAO/Socorro.
Orion-KL EVLA spectrum Karl Menten, Dec. 24, 2010 Received spectrum from R. Perley on Dec. 23, 2010 Frequency range – MHz Subtracted
Orion-KL EVLA spectrum Karl Menten, Dec. 28, 2010 Received spectra from R. Perley on Dec. 23 and 28, 2010 Frequency range – MHz Subtracted.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The March to Early.
The EVLA and SKA pathfinder surveys Jim Condon NRAO, Charlottesville.
Project status and specifications Douglas Bock Project Manager 1.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array EVLA Observations of.
1 National Radio Astronomy Observatory EVLA Status -- Jim Ulvestad, for Mark McKinnon, Rick Perley, and the EVLA Team.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Cross Correlators Walter Brisken.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with ALMA.
Millimetre Astronomy with the Australia Telescope Max Voronkov Software Scientist – ASKAP 12 th June 2009.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Molecular Gas and Dust in SMGs in COSMOS Left panel is the COSMOS field with overlays of single-dish mm surveys. Right panel is a 0.3 sq degree map at.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array New VLBA capabilities.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The Expanded Very Large.
Introducing the EVLA NRAO Postdoctoral Symposium, 29 April-1 May 2009 Michael P. Rupen Project Scientist for WIDAR.
April 19, 2007 EVLA Update1 The EVLA Project An Update Rick Perley National Radio Astronomy Observatory.
The Expanded Very Large Array: Phase I Science and Technical Requirements Rick Perley NRAO - Socorro.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory EVLA Goals, Progress, Status, and Projections Rick Perley Mark McKinnon.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Transition Operations Claire Chandler.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Moscow presentation, Sept, 2007 L. Kogan National Radio Astronomy Observatory, Socorro, NM, USA EVLA, ALMA –the most important NRAO projects.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
The North American ALMA Science Center North America’s ALMA Regional Center The North American ALMA Science Center acts as the gateway to ALMA for North.
Murchison Widefield Array (MWA) : Design and Status Divya Oberoi, Lenoid Benkevitch MIT Haystack Observatory doberoi, On behalf.
Sub-mm/mm Observing TechniquesThe EVLAAug 14, 2006 The EVLA Project Sean Dougherty National Research Council Herzberg Institute for Astrophysics Rick Perley.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The ALMA Observing.
Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory Correlator Status and Growth of Capabilities Michael P. Rupen Project.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
ALMA and the Call for Early Science The Atacama Large (Sub)Millimeter Array (ALMA) is now under construction on the Chajnantor plain of the Chilean Andes.
ALMA Science Examples Min S. Yun (UMass/ANASAC). ALMA Science Requirements  High Fidelity Imaging  Precise Imaging at 0.1” Resolution  Routine Sub-mJy.
Rick Perley 2 Nov 2001 EVLA Correlator Conceptual Design Review 1 Science Drivers for the EVLA Correlator Rick Perley EVLA Project Scientist 2 Nov 2001.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array EVLA Early Science.
Rick PerleyEVLA Advisory Committee Meeting September 6-7, 2007 Some Illustrative Use Cases Rick Perley.
Early EVLA Science Use Cases EVLA Advisory Committee Meeting, March 19-20, 2009 Rick Perley EVLA Project Scientist.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
THE ALMA ORION BAND 6 SCIENCE VERIFICATION DATA SPECTRAL LINE SURVEY - CONTENT AND DISCOVERY AVAILABLE FOR ALL SCIENCE Anthony J. Remijan ALMA Program.
What is EVLA? Giant steps to the SKA-high ParameterVLAEVLAFactor Point Source Sensitivity (1- , 12 hr.)10  Jy1  Jy 10 Maximum BW in each polarization0.1.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Transition Observing and Science EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The Very Long Baseline.
Obtaining e-MERLIN Data For Use With NRAO Legacy Projects Tom Muxlow May 17 th 2006.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Imaging issues Full beam, full bandwidth, full Stokes noise limited imaging Algorithmic Requirements: –PB corrections: Rotation, Freq. & Poln. dependence,
Surveying Cosmic Time with the WIDAR Correlator
EVLA Availability - or - When Can I Use It?
EVLA Status and Prospects
Rick Perley National Radio Astronomy Observatory
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
VLA to EVLA Transition Plan
Some Illustrative Use Cases
EVLA Advisory Committee Meeting
Science Commissioning
Prototype Correlator Testing
Shared Risk Science with the EVLA
EVLA Advisory Committee Meeting, March 19-20, 2009
Correlator Growth Path
Transition Observing and Science
EVLA Construction Status
Transition Observing and Science
EVLA Advisory Panel Mtg. System Overview
Rick Perley NRAO - Socorro
Presentation transcript:

Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The Expanded Very Large Array Rick Perley 1 and Sean Dougherty 2 1 NRAO, Socorro, NM 2 DRAO/HIA/NRC, Penticton BC

EVLA The Expanded Very Large Array The Expanded Very Large Array is a $90M upgrade of the Very Large Array. – Project began in 2001, will be completed in 2012 – on time, on spec, on budget. The EVLA will multiply by orders of magnitude the observational capabilities of the VLA. Key goals are: – Full frequency coverage from 1 to 50 GHz. – Up to 8 GHz instantaneous bandwidth, per polarization – New correlator with unprecedented capabilities – ~3  Jy (1- , 1-Hr) point-source continuum sensitivity at most bands. – ~1 mJy (1- , 1 km/sec, 1 Hr) line sensitivity at most bands. 2

EVLA Overall EVLA Performance Goals Providing orders of magnitude improvements in performance! ParameterVLAEVLAFactor Continuum Sensitivity (1- , 1 hr.)30  Jy3  Jy 10 Maximum BW in each polarization0.1 GHz 8 GHz80 # of frequency channels at max. BW1616, Maximum number of freq. channels5124,194, Coarsest frequency resolution50 MHz2 MHz40 Finest frequency resolution381 Hz0.12 Hz3180 # of full-polarization spectral windows26432 (Log) Frequency Coverage (1 – 50 GHz)22%100%5 3

EVLA Major EVLA Milestones All 28 antennas now converted to EVLA standards. VLA correlator was shut down on January 11. New EVLA correlator turned on March 2. Wideband Interferometric Digital ARchitecture (WIDAR) correlator contributed by Canada EVLA ‘early science’ OSRO and RSRO programs began March 2010 and continue through end of GHz bandwidth available by June Correlator installation complete July Full bandwidth (8 GHz) available on all antennas late Receiver implementation will be completed end of

EVLA The ‘WIDAR’ Correlator A 10 petaflop special-purpose computer. – Designed and built by Canadian HIA/DRAO. Major capabilities: – 8 GHz maximum instantaneous bandwidth, with full polarization. – minimum, 4.2 million maximum frequency channels – 64 independently tunable full polarization ‘spectral windows’, each of which effectively forms an independent ‘sub-correlator’. – Extensive special modes: pulsar gating/binning, phased array, VLBI- ready, burst modes, and more. Most of this correlator now in place at the VLA site. Fundamental capabilities will be developed first, with specialty modes later. 5

EVLA Early EVLA Results Results shown from: – A 12-antenna sub-array used to test WIDAR-0 prototype channel, Full polarization, Eight adjacent spectral windows – The full WIDAR, with all antennas. Eight tunable spectral windows For more early results, see posters: – WIDAR – the High-Performance Heart of the EVLA (DRAO WIDAR team) – EVLA and Early Galaxies: Current Status (Carilli et al.) – Zeeman Effect at 36 and 44 GHz from Class I Methanol Masers (Momjian and Sarma) 6

EVLA 3C147 Deep 1440 MHz 12 antennas, 110 MHz bandwidth, 6 hours integration Fidelity ~ 400,000:1 Peak/rms ~ 850,000:1 The highest fidelity image ever made with the VLA – using only a fraction of the full capability! The artifacts are due to non- azimuthal symmetry in the antenna primary beams. – Illustrates the need for advanced calibration/imaging software. 7 First Null Primary Beam Half Power

EVLA Orion-KL Spectrum – 3 GHz Wide 8 Three short obs. of Orion, each 1024 MHz wide, with ~1.5 km/sec velocity resolution and 2.5” spatial resolution, show 31 strong lines. From ammonia (NH3): 8 lowest meta-stable inversion transitions (J,K) = (1,1) to (8.8) (6,6) line from 15 NH 3 isotopologue, the 4(1,4)-4(0,4) line from NH 2 D. meta-stable (9,8) & (10,9) lines, Two E/A doublets of methyl formate: CH 3 CHO OCS 2-1 Three lines from SO 2 Ten strong methanol maser lines from E-type series (J=2 – 11). One unidentified line Numerous weak lines channels

EVLA Orion-KL: Zooming in … 9 Left Side: The lowest 1.0 GHz, showing identifications. Right Side: The two lowest meta-stable transitions, showing blended hyperfine structure. Two SO 2 lines

EVLA Spectra from the 128 x 128 x data cube 10 Moment-0 Image End to end processing done in CASA by Steve Myers Data Cube available at: projectstatus/index.shtml

EVLA EVLA K-band Observations of massive young stellar objects in NGC6334-I 8 x 8 MHz subbands with 256 channels, 0.4 km/sec; 10 minutes on source!!!! Test for RSRO project AB1346 (PI Crystal Brogan): “A Diagnostic K-band Survey of Massive Young Protostellar Objects” which will use 16 subbands NGC63 34-I maser s NH 3 (3,3)

EVLA Crystal’s ‘RSRO’ Project : A Diagnostic K-band Survey of 30 Massive Protostellar Objects 12 In the “best case” scenario we will use 32 subbands (solid and dotted lines above) which includes a number of rare and deuterated species In the “great case” scenario we will use 16 subbands (solid lines above) Current tests uses 8 of the subbands above

EVLA Early Science Programs Two early science programs: March 2010 through December Open Shared Risk Observing (OSRO): – A ‘business as usual’ observing protocol. – Observers will access EVLA in same manner as current for VLA. – Initial configuration provides 512 spectral channels with one or two spectral windows of 128 MHz (maximum) each. Resident Shared Risk Observing (RSRO): – Must be resident in Socorro for at least 3 months. – Participants will have access to more extensive observing capabilities. – Participants will assist NRAO staff in expanding capabilities – Observing time proportional to length of residency. – 27 proposals received on first call, 13 have been accepted. For details, see: – 13

EVLA 14 WIDAR Growth: Observational capabilities will grow rapidly through All early observations will be with the ‘fundamental homogeneous correlator setup’ – All spectral windows adjacent, with same width & channelization, arranged to maximize total bandwidth (BW) coverage Resident observers (RSRO Program) should have access to: – 2 GHz/polarization BW (all antennas) by mid-2010 – 8 GHz/polarization BW (all antennas) by end of – Recirculation (increased spectral resolution) by late 2010 – Independent spectral window tuning by early 2011 – Flexible resource allocation (trading spectral windows for more spectral resolution) by mid 2011

EVLA Summary EVLA is now conducting science observations with all antennas and unprecedented new capabilities Wide-band (full tuning range) receivers available on all antennas – Highest frequency bands (18 – 50 GHz): mid 2010 – 4 – 8 GHz: end 2010 – Remaining four bands: 2012 Ever Increasing Science opportunities: Mar Dec 2011 – Basic modes via OSRO Program: 256 MHz max BW, and you stay home – Advanced modes via RSRO Program: 2 – 8 GHz max BW, and you come to Socorro – Specialty modes as implemented, guided by user interest Full Regular Observing begins Jan

EVLA 16 Full-Bandwidth Availability Timescale During transition, L, C, and X band receivers are on all antennas.

EVLA Spectral Windows Continuity 17 Eight continuous subbands, each of 128 MHz, spanning 1 – 2 GHz band GHz Satellites Aircraft Navigation Cellphones Single baseline, ampscalar average, showing RFI, but also extensive ‘empty space’. These are raw data, with no bandpass correction. Same data, vector average, showing how RFI is decohered over a few minutes integration. GPS