TB 19.1.06 L.Jirden 1 Detector ethernet switches u ~55 switches for FEE needed by 6 detectors u KTI switch tested ok in B-field by TRD u Not included in.

Slides:



Advertisements
Similar presentations
Two Special Right Triangles
Advertisements

R&M Fiberliner LAN / WAN applications R&Measynet.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 The TRD Ethernet network at Point 2 David Emschermann Physikalisches Institut Universität Heidelberg.
1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
André Augustinus 5 March 2007 Infrastructure status.
AMORE - AliRoot Detectorv4-18-Rev12 ACORDE EMCal FMD HMPID MCH MTR PHOS PMD SDD SPD SSD T00 TOF TPC TRD V00 ZDC v4-18-Rev13v4-18-Rev14v4-18-Rev15v4-18-Rev16.
F. Formenti - ALICE forum 16/03/ Contacted some teams for system GND discussions: cases analyzed are presented here Planned to continue with others.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
FF - August 30th 2004 Meeting ALICE radiation tolerance. Some reasons for this meeting: A part very inner detectors (Pixels and SDD), ALICE has wide grey.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
1 LV Power Supplies L.Jirden* u Detector solutions u Contracts u Tests u Outstanding issues *Presented by André Augustinus.
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
1 Low Voltage Power Supplies for ALICE ALICE week June 04 L.Jirden u Detector requirements u Target Devices u Procurement u Actions.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
1 Cost of controls TB L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
PHOS progress in LS1 Alexander Vinogradov 11 August 2014.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Doug, here are some slides. FGT Electrical Integration ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 2 mA ARC module (APV Readout.
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
18/6/03GS/ALICE Forum1 LVPS - Grounding Meeting of LVPS TF on Tuesday 17/6 Overview of TPC, TRD and TOF subsystem with F. Szoncso/TIS-GS Review of subsystems.
André Augustinus 9 October 2006 Interlocks update.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Target devices (reminder) u Market Survey and Tender u Actions.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
TPC Collaboration Meeting Peter Glassel 1 Reminder on Installation Schedule (ALICE Forum June 2002)  Install Muon magnet directly into experimental.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
DCal-ALICE integration and installation plan and status A. Tauro.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
(Alice COsmic Ray Detector) Status Report
TS2 preparatory meeting
Gas system Commissioning procedures and status
TPC Commissioning: DAQ, ECS aspects
352MHz Klystron Control for the 3MeV Linac test stand
Update on the Ethernet Network Installation Campaign
Fiber Installation for RUN 3&4
Главни развод (MC) главна тачка концентрације
Структурно каблирање Систематски приступ каблирању
Presentation transcript:

TB L.Jirden 1 Detector ethernet switches u ~55 switches for FEE needed by 6 detectors u KTI switch tested ok in B-field by TRD u Not included in IT networking responsibility u Switches to be purchased, installed, managed and maintained by ALICE u Installation required in April u DCS team ready to help u Waiting for feedback from TRD

TB L.Jirden Detector Ethernet switches (DCS, RCU) [total: 51]

TB L.Jirden 3 detector switch in rack maximum length (m) cable entry side number of cablescomment TOF I A18estimate O A18estimate I C18following cable trays O C18following cable trays TPC A A114estimate, with patch-panel! C C114following cable trays TRD I A64estimate O A64estimate C C128following cable trays I C1following cable trays FMD A A2estimate I C1Following cable trays SDD A A10estimate I C10following cable trays PHOS A A5estimate ETHERNET CABLE LENGTHS max length allowed: 45m without intermediate patch panel