Status of PMD DCS. PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48.

Slides:



Advertisements
Similar presentations
PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48 Nos. Total Unit module.
Advertisements

ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
André Augustinus 5 March 2007 Infrastructure status.
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
MDT PS DCS for ATLAS Eleni Mountricha
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Responsibilities & Planning DCS WS L.Jirdén.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
21/6/2004 Colmar, DCS Work. G. De Cataldo Cern-CH&INFN Ba,I; A. Franco INFN BA,I 1 The candidate STANDARD diagram for the HV FSM in ALICE TO WHAT AND WHY.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
ARCHITECTURE. PRR November x 32 PADs Up to 26 or 3 x 17 MANU BOARD. PATCH BUS Translator Board. FEE DETECTOR Up to 100 PATCH BUS per detector. MANU.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
8-May-2010 LV Workshop1 Alignment LV: quick’n dirty HW review Alignment uses CAEN low voltage –No HV –Low power consumption electronics: under kW.
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
CLAS12 ECAL PCAL DC FTOF... Region 2 DewPnt Region 3 Region 4 Region 1 Mod 1... Mod 2 HV TEMP LV Hierarchy of Slow Controls: Driven by Finite State Machine.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Status Report TOTEM Collaboration Meeting 17-NOVEMBER-2014
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
CERN Summerschool 2007 Monitor and Control of the CANbus power supplies of ATLAS’ MDTs Wilco Koppert (UU)
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Status of PMD DCS

PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48 Nos. Total Unit module components Honeycomb (4608 cells) Top, bottom PCBs

PMD DCS SMI Control Unit SMI Device Unit Hardware Device Being done by CERN GWG GAS HV LV PMD DCS Tmon Crate Ctrl

HV System HV CAEN SY1527 From LVPS SMI Control Unit SMI Device Unit Hardware Device PREVETO HVPS UM2448 UM 023

LV SYSTEM LV LVPS CROCUS6 CAEN EASY CAEN 48V CROCUS CROCUS1 +3.3V To SY1527 SMI Control Unit SMI Device Unit Hardware Device PRE VETO UM24 48 UM24 UM 0 23

Tmon ELMB2ELMB1 ELMB Status SMI Control Unit SMI Device Unit Hardware Device Crocus UM 0 UM 48

GAS AND CRATE CONTROL GAS Gas Crate Ctrl VME Crate SMI Control Unit SMI Device Unit Hardware Device

CONFIGURING ON Go_INTERMETIATE Go_OFF Go_ON RESET OFF CONFIGURED_OFF INTERMEDIATE RAMP_DOWN_HIGH RAMP_DOWN_LOW RAMP_UP_HIGH RAMP_UP_LOW RAMP_UP_FULL Go_CONFIGURED_OFF Go_ON Go_CONFIGURE RESET Go_INTERMEDIATE Go_CONFIGURED_OFF RESET Go_CONFIGURED RESET CONFIGURING RAMP_DOWN_FULL

OFF CONFIGURING CONFIGURED STANDBY PEDESTAL ON RAMP_UP_LORAMP_DOWN_LO RAMP_UP_HIGH RAMP_DOWN_HIGH RAMP_UP_FULL RAMP_DOWN_FULL GO_STANDBY GO_PEDESTAL GO_ON GO_OFF RESET GO_CONFIGURED RESET GO_STANDBY GO_PEDESTAL GO_CONFIGURED_OFF RESET

LVPS CAEN EASY SYSTEM USES CAEN A1676 Branch Conroller Control through SY1527 Crate. Branch Controller uses Can Bus to control the different Crates. 6 Easy Crates visualized for all LV channels First crates to be available ending April (OCT)2006 sample for testing ???

Temperature Monitoring 32 PT100 4 wire sensors for monitoring temperature on the 48 modules 6 sensors for 6 CROCUS crates 2 ELMBs (Embedded Local Monitor Board) to interface with the sensors 1 ELMB for each half of PMD

Temp Monitoring 1 ELMB and 2 PT 100 temp sensors were taken from CERN early November. ELMB is installed and temp monitoring system is implemented as an FSM Software interlock between HV system and Temp monitoring is tested and working