Doc.: IEEE 802.11-05/0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 1 Thoughts on the 802.1AM PAR Notice: This document has been prepared to assist.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /90r0 Submission Nov., 2012 NICTSlide b NICT Proposal IEEE P Wireless RANs Date: Authors: Notice: This document.
Advertisements

Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Doc.: IEEE /0803r1 Submission July 2005 TK Tan, Philips Slide 1 WNG SC Closing Report Notice: This document has been prepared to assist IEEE
Doc.: IEEE /0094r0 Submission November 2009 Steve Shellhammer, QualcommSlide 1 Comments on PAR Notice: This document has been prepared.
Doc.: IEEE /0618r1 Submission July 2005 Eleanor Hepworth, Siemens Roke ManorSlide 1 TGu Down Selection Procedure Notice: This document has been.
Doc.: IEEE /0054r0 Submission May 2011 Slide 1Hyunduk Kang, et al, ETRI Discussion on mode of management service Notice: This document has been.
Doc.: IEEE /2237r0 Submission July 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D1.0 Insert and Deletion Notice: This document has been.
Doc.: IEEE /1212r0 Submission TGT and MEF Liaison Notice: This document has been prepared to assist IEEE It is offered as a basis for.
Doc.: IEEE /1528r0 Submission 22 September 2006 Naveen Kakani, Nokia, IncSlide 1 TGn PSMP adhoc Group September Closing Report Notice: This document.
Doc.: IEEE /0460r1 Submission March 2006 Fujio Watanabe, DoCoMo USA LabsSlide 1 Japanese Emergency Call Regulation Notice: This document has been.
Doc.: IEEE /0652r1 Submission May 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D0.12 Insert and Deletion Notice: This document has been.
Doc.: IEEE /0940r1 Submission Sept 2005 Darwin Engwer, NortelSlide 1 Thoughts on the 802.1AM PAR Notice: This document has been prepared to assist.
LB84 General AdHoc Group Sept. Closing TGn Motions
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
IEEE WG Status Report – July 2005
IEEE White Space Radio Contribution Title
Thoughts on the 802.1AM PAR Date: Authors: Sept 2005
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
March 2014 Election Results
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
Motion to accept Draft p 2.0
3GPP liaison report July 2006
[place presentation subject title text here]
Motions Date: Authors: January 2006
(Presentation name) For (Name of group) (Presenter’s name,title)
TGp Closing Report Date: Authors: March 2006 Month Year
TGn PSMP ad hoc Agenda – September 14 ‘06
On Coexistence Mechanisms
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
JTC1 Ad Hoc Mid-week Report
On Coexistence Mechanisms
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
Experimental DTV Sensor
ADS Study Group Mid-week Report
Selection Procedure Recommendation
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
PHY Ad Hoc September Opening Report
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGp Closing Report Date: Authors: March 2007 Month Year
TGr Proposed Draft Revision Notice
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
Thoughts on the 802.1AM PAR Date: Authors: Sept 2005
Liaison Report From Date: Authors: Month Year
Beamforming and Link Adaptation Motions
Draft P802.11s D1.03 WordConversion
Questions to the Contention-based Protocol (CBP) Study Group
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGu Motions Date: Authors: May 2006 May 2006
WNG SC Closing Report Date: Authors: November 2005
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGr Proposed Draft Revision Notice
Selection Procedure Recommendation
Presentation transcript:

doc.: IEEE /0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 1 Thoughts on the 802.1AM PAR Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Authors:

doc.: IEEE /0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 2 Abstract “I've flown from one side of the network to the other. I've seen a lot of strange stuff, but I've never seen anything to make me believe there's one all-powerful force that can control everything.”

doc.: IEEE /0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 3 The field is very broad A: not clear whether 802.1AM will address over-the-air mgmt or over-the-backhaul network mgmt, or both –poor scope definition in in the 802.1AM PAR B: Technical feasibility is greatly in question

doc.: IEEE /0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 4 Technical Feasibility over-the-air management over-the-backhaul network management

doc.: IEEE /0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 5 over-the-air "management” there is no common framework for over-the-air "management" between different RF technologies (within let alone within 802) it is not viable bcus the devices operate in difference frequency bands using different modulation types and no single radio can (simultaneously) operate across all those bands/ modulation types. perhaps a SDR could perhaps do something in this regard by altering it's operational mode over time. But doing so on the fly is [today] impossible. –needs to be real-time to address temporal aspects of the issue

doc.: IEEE /0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 6 over-the-air "management” (cont’d) well, unless you have a universal wideband transceiver. maybe this is a "subspace" communication [vs. today’s "ether" space communications] and we don't know how to do that today –subspace communication would need to occur outside space and time; currently that is only science fiction hence my updated position is not that over-the-air "management” is impossible, but that the fundamental support technologies required to make it work don't yet exist.

doc.: IEEE /0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 7 over-the-backhaul network management there is no common framework for over-the-backhaul network management between different types of RF networks the backhaul networks are different types, and are not interconnected even if they were interconnected they are likely in different administrative domains –e.g. the hotel network is isolated from the 802 meeting net even if not isolated; which network has higher authority? –e.g. hotel net does what our network tells it to do or vice versa?

doc.: IEEE /0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 8 over-the-backhaul network management (cont’d) further, some RF network types have no backhaul component at all (e.g and IBSS/ ad hoc networks)

doc.: IEEE /0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 9 Summary Feasibility remains in question –this is not addressed by the 802.1AM PAR –not yet responded to by –therefore the question remains open could be addressed by a supporting document if space in the PAR document is unduly constrained Value proposition is also unclear –i.e. what is the value or benefit vs. the required effort?

doc.: IEEE /0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 10

doc.: IEEE /0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 11

doc.: IEEE /0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 12 Q & A Q: Is there a useful partial solution? –because RF is a shared medium, solving part of the problem essentially doesn't solve the problem –a partial solution would be like arranging things so you can be partially not pregnant I'm an optimist so I won't say that's impossible but any partial proposal should indicate how it will avoid the "9 month surprise"

doc.: IEEE /0940r0 Submission Sept 2005 Darwin Engwer, NortelSlide 13 References wng-dot1am-work-sizing.xls wng-dot1am-management-plane.ppt wng-dot1am-management-par-5c.doc