Northwest Nazarene University Chad Larson, Ben Gordon, Seth Leija, David Vinson, Drew Johnson, Zach Thomas June 1 st, 2012.

Slides:



Advertisements
Similar presentations
RockOn! Canister Integration RockOn! 2009.
Advertisements

Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
RockSat-C 2012 CoDR Minnesota Sound Wreckers Conceptual Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
Individual Subsystem Testing Report Northwest Nazarene University Advisor: Dr. Lawrence Chad Larson Ben Gordon Seth Leija David Vinson Zach Thomas Drew.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
RockSat-C 2012 LRR Launch Readiness Review University/Institution Team Members Date.
Full Mission Simulation Test Report UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus May 14, 2010.
RockSat 2010 Harding Flying Bison RockSat-C Rocket Team Harding University Ethan Lilly, Eric Locke, Darah McDaniel, Ed Wilson June 22, 2011.
Preliminary Design Review Northwest Nazarene University Advisor: Dr. Lawrence Chad Larson Ben Gordon Seth Leija David Vinson Zach Thomas Drew Johnson.
Critical Design Review Northwest Nazarene University Advisor: Dr. Lawrence Chad Larson Ben Gordon Seth Leija David Vinson Zach Thomas Drew Johnson.
Launch Readiness Review SloshSAT University of Northern Colorado Sage Andorka Dan Welsh Maurice Woods III Motoaki Honda Zach Sears 6/11/2010.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
Interactive Xylophonic Keyboard Mini-Mozarts October 12, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
Launch Readiness Review JASMM Virginia Tech Team Members: Robbie Robertson Zack HarlowJeremiah Shiflet Daniel Martin Matt James Anthony Rinaldi Senior.
Launch Readiness Review Team Name University/Institution Team Members Date.
Launch Readiness Review River Rock 2010 University of Puerto Rico June 9, 2010.
NORTHWEST NAZARENE UNIVERSITY CHAD LARSON, BEN GORDON, DAVID VINSON, SETH LEIJA, ZACH THOMAS, DREW JOHNSON NNU Team Conceptual Design Review.
RockSat-C 2011 CoDR CSU RocketSat-C Conceptual Design Review Colorado State University Isaiah Franka Jordan Rath Abby Wilbourn Mike Yeager 10/1/10 1.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
Conceptual Design Review Metro State College of Denver Daniel Bass, Matt Hanley
Launch Readiness Review MinnSpec University of Minnesota Bryce Schaefer, Chris Woerhle, Art Graf
Full Mission Simulation Report New Jersey Space Grant Consortium at Stevens Institute of Technology and Rutgers University Ethan Hayon, Mark Siembab, Mike.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Miscellaneous Notes: This is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here. Basically this.
All applications will be accepted until May 15, Remember the institute is limited to 70 people, so get your information to us soon! Week-long attendance.
New Mexico Space Grant Consortium Student Launch Program Provide annual access to space for student experiments from Spaceport America.
Technology Class Rules/Expectations Ms. Wurtenberger.
Critical Design Review Team Name University/Institution Team Members Date.
Hy-V.1 Skin Friction Sensor Experiment Presenters: Ryan F. Johnson Mitchell Foral-Systems November 24, 2008 University of Virginia.
MinnRock Design and Canister Layout Team members Bryce Schaefer (team coordinator)- AEM Cameron Japuntich- AEM Liz Sefkow- ME Mitch Andrus-
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
RockSat-C 2012 SITR Full Mission Simulation Report Harding University William Waldron, Joshua Griffith, Drew Cancienne, Edmond Wilson, David Stair 22 April.
RockSat-C 2012 SITR Full Mission Simulation Report University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson 4/23/2012.
Full Mission Simulation Test Report SloshSAT University of Northern Colorado Team Members: Sage Andorka Dan Welsh Motoaki Honda Maurice Woods III Zach.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
1.2 What Can We Work Together? Pg. 6 Creating a Quilt Using Symmetry and Investigations.
MNROCK CONCEPTUAL DESIGN REVIEW University of Minnesota William Ung Scott Balaban Bryce Schaefer Tom Thoe 11/3/2008.
Launch Readiness Review
RockOn! October 26, 2008 RockOn! A Sounding Rocket Payload Workshop Colorado & Virginia Space Grant Consortium, Wallops Flight Facility.
Simple Predicates ONE MAIN WORD IN THE PREDICATE! THE VERB! Action that is being done It’s what the subject is exactly doing…
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
Section 1: Mission Overview Mission Statement Mission Objectives Section 2: The Payload! User’s Guide Compliance Beta Prototype Testing Section 3: Check-In.
Technology Class Ms. Wurtenberger Rules/Expectations.
RequirementMethodStatus The payload must not exceed a weight of 1.45 Kgm.Design, Test The payload must conform to the WFF “no volt requirement”
RockSat-C 2012 LRR Launch Readiness Review University of Minnesota Alex Richman, Jacob Schultz, Justine Topel, Will Thorson 5/27/2012.
Section 1: Mission Overview Mission Statement Mission Objectives Expected Results System Modifications Functional Block Diagrams 2.
Preliminary Design Review Metro State College of Denver Matthew Hanley, Daniel Bass 14 November 2008.
RESEARCH PROJECTS Rules to Follow When Doing Research.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
RockOn! RockOn! Structure Build RockOn! 2009.
RamRack Conceptual Design Review Colorado State University Zach Glueckert Christopher Reed Timothy Schneider Brendan Sheridan Christina Watanuki Advisor:
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Reconfigurable Computing for Space Applications
Blueprint for Excellence
Receiving and Handling
Physical Inventory Training
Launch Readiness Review
Launch Readiness Review
Team Name Conceptual Design Review
Team Name Conceptual Design Review
RockOn... A Sounding Rocket Payload Workshop
Launch Readiness Report West Virginia University
Presentation transcript:

Northwest Nazarene University Chad Larson, Ben Gordon, Seth Leija, David Vinson, Drew Johnson, Zach Thomas June 1 st, 2012

 Study the effects of a rocket launch on superhydrophobic material developed at Oakridge National Laboratory  Study radiation hardened chips in partnership with American Semiconductor Inc.

RequirementPayloadStatus Mass Allotment:6.5 with ballasts, ballasts need to be added to structure Volume Allotment:4.75” high Center of GravityIn the allotted 1x1x1inch center of canister. Will be retested once the ballasts have been added. Activation1.SYS.2. G-switch Structure MountsNo mounts to side of can. SharingMore contact with Harding will be necessary this next week.

 Our electrical system is essentially fully integrated except for one chip.  Between the two experiments, they will both fit on the one polycarbonate plate and there are no foreseeable problems.  We have not yet written out a integration procedure. We will be contacting Harding a lot this week, preparing for a smooth and hassle free integration.

 Our electrical system has been fully integrated into the RockOn board and is activated through the g-switch.  Our payload will fulfill our mission requirements testing both superhydrophobic materials as well as radiation hardened chips.

 The electrical system has been fully integrated with the RockOn board and is only missing one chip until it is fully ready for flight.  The FleX chip was placed in a socket at BSU and is expected to arrive today after which it will be integrated into the system.  The code for the FleX chip has to be finished, but should be done as soon as the chip arrives.

 The manufacture of the superhydrophobic experiment boxes will be completed this following week. One box has been manufactured and the other one is being made and should be completed today.  After today, only the interior boxes will need to be put together using the superhydrophobic plates.

 We are in the process of being ready for the launch. We are extremely close to being fully prepared and should be completely ready to go by next week. We have several team members who will work all next week and the week before we leave to ensure a completed payload.  The polycarbonate plate has been ordered and will be made next week, after which we will attach the boxes and electrical system and fully assemble the entire payload and prepare for integration.

 Complete Outer boxes: June 1 th  Complete Inner boxes: June 4 th  Attach final chip/code/sim: June 6 th  Complete polycarbonate plate: June 8 th  Fully attach payload to plate: June 9 th

 Our hotel has been booked and flights have been purchased.  One professor wanted to come later in the week of the launch and has filled out registration. We will talk to Wallops when we arrive to see if it is worth it for him to fly down.

 Almost the entire team was out of the U.S. the last three weeks, but arrived back today. Our sole focus the next 12 days will be our RockSat experiment and are confident that everything will be completed and ready to go by next week.