Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.

Slides:



Advertisements
Similar presentations
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

Team Members:  Kyle Bloomer  Josh Geiman  Lucas Bennett Team Sponsor:  Dr. Cindy Harnett Team Mentor:  Dr. Andy Dozier.
ATLAS Module building at Glasgow
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 1 ATLAS Tracker Upgrade: Hybrid Wire-Bonding and Test Setup at Birmingham.
DEMONSTRATION FOR SIGMA DATA ACQUISITION MODULES Tempatron Ltd Data Measurements Division Darwin Close Reading RG2 0TB UK T : +44 (0) F :
Stephen Pemberton TE-MPE-EE 1 DQLPUR Prototype Testing Initial Results: Thermal Tests Voltage Drop Off Tests.
Hybrid Wind & Solar Generation Project
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Received new "130nm" jigs from Liverpool and after the "module workshop" 25/3/15 at Liverpool and ready to make dummy modules New jigs need to be slotted.
BODHPS PROTOTYPE B Testing and Documentation of improved prototype with a record of power output.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
S Pyatt Dummy module with copper on glass sensor An adhesive tape has been identified that is suitable for dummy module building. This tape can be stuck.
U.B. Presentation October Bernard COURTY L.P.C.C. College de France - Paris.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Hardware Training Product: ITMS2.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 1 - Small vacuum pump holding hybrid flat on panel (which it is ‘strong enough’ to do) - Since picture.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Preparations for Irradiation of ABCN250-Hybrid (1) 10 th August 2015, Petal/Stave Meeting Following-up on Craig’s plans for irradiation at the B’ham cyclotron:
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
21 Nov 2013 Juergen Thomas: ATLAS Tracker Upgrade: Hybrid Production and Test Setup at Birmingham 1 ATLAS Tracker Upgrade: Hybrid Production and Tests.
Petalet-Stavelet; 13 July Birmingham Update Gluing to mechanical sensor with Epolite (as reported earlier). 1 st hybrid – too much glue on stencil.
Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
WP3_Bham; 10July 2014; John Wilson1 Gluing: more investigations (Simon and Sam) New clamping method provides a good base for systematic studies. Sketch.
ATLAS UK Tracker Upgrade AIDA-2020 Transnational Access Facility
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
WP3_Bham; 29May 2014; John Wilson1 Heated plate curing Tests with 130nm hybrids and glass ASICs the glue thickness is controllable. i)Room temp curing.
ABC130 Hybrid/module and HCC Bond Detail ABC130 Left & Right Handed Hybrid and Module Topology Original proposal – same flavour hybrids Hybrid-module.
Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Gluing trials continuing: Loctite is favourite (for Dispensemaster) Bonding: exercising the machine; practising in laying down patterns (Simon and.
US stavelet update 12th April PPB2s on serial power side 12 Apr SAMTEC connector (floating) Bond pad (connected to EoS through WB + bus tape.
WP3; 15 Jan 2015; John Wilson.1 Birmingham Update All back and operational after Christmas! Simon in contact with Dario Ariza at DESY re gluing (Boron.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting, 9 th November Phil Allport, Matt Baca, Daniel Briglin, James.
WP3_Bham; 15May 2014; John Wilson1 Heated plate curing Tests with 130nm hybrids and glass ASICs i) Room temp curing the glue thickness is controllable.
Birmingham Status ASIC shear tests (250nm Panel with hybrids cured at room temp and with heated plate, sent to Berlin for shear testing. (Complication:
TM Module Measurements (1) 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Figure 3-9: Implementing the Load Diverter CAUTION Do NOT connect the wires to the Diversion Load Controller or the terminal block at this point. IF.
Team Members:  Kyle Bloomer  Josh Geiman  Lucas Bennett Team Sponsor:  Dr. Cindy Harnett Team Mentor:  Dr. Andy Dozier.
Programming and Debugging with the Dragon and JTAG Many thanks to Dr. James Hawthorne for evaluating the Dragon system and providing the core content for.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
Making a 24hr Timer.
Intro to USB-6009 DAQ.
Cold Temperature Test Jig
→ need to guide UV light into gap; also beware temp effects
Glue curing studies (contd)
Markus Friedl (HEPHY Vienna)
Baby-Mind SiPM Front End Electronics
+ Steve Worm (since Monday)
SCADA for Remote Industrial Plant
Ladder Assembly All tools and jigs produced Glue dispensing works
ITK Strip Module Meeting; 12st October 2015
Use USB_DAQ to Complete the Calibration of PGA308 EVM
HIC Assembly - Liverpool
ATLAS ITK WP3 WP3 Bi-weekly meeting
Group meeting, 2nd Sept, 2013; JAW
Update from Birmingham
WELCOME.
SIDECAR ASIC Characterization Dan Pontillo
Presentation transcript:

Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured glue (glues not quite in hand; which glue?) Luise via make electrical EC hybrids with various glues; irradiate (at KIT) : choose the best. Bonding: bonder exercised and programme Hybrid to sensor Gluing: two modules made (mechanicals). i)OK on 2 nd attempt – no bleed. Bonding i) Practise on Cu tape. 1WP3; 30 July

Birmingham: practice modules Hybrid to sensor Bonding (contd) ii) Patterned ASICs to mechanicals. No problem bonding to Si. Difficulty bonding to patterned glass: first hybrid only; better after cleaning with alcohol but…. 2nd hybrid bonded fine; programme OK Make more dummy modules? Need more patterned glass 2 OK Problem WP3; 30 July

S Pyatt (After Steve’s presentation on 16July)) £13.62 each from Farnell; requires a 5 Vdc supply; draws 200 μA; almost linear voltage output vs % RH WP3; 30 July

S Pyatt Test: temp and RH vs time WP3; 30 July

HIH-4000: conclusions: Will help with optimising the N2 purging of the ALiBaVa freezer. Low cost and easy to set up. Low power. Could be run off a battery or a modified USB supply. Can be used with the Data logger. Either use the front panel display on the data logger or invest in a licence (About £500) to allow real time graph monitoring. Also capturing of the data for export to a spreadsheet. Simultaneous monitoring of temperature (with a thermocouple) and %RH can be achieved with the data logger. 20 channels of monitoring are available. Also try to use in cold box in cyclotron irradiation. S Pyatt WP3; 30 July

Atlys+ABCN250-Hybrid at B'ham (1) (Juergen, AndyC, SimonH) John Wilson, Phil Allport, Simon Pyatt, Sam Edwards, Juergen Thomas, James Broughton, Kostas Nikolopoulos, Andy Chisholm, Simon Head -Clean-room PC (Win7) with Atlys connected to Birmingham- assembled Stave09 hybrid, ‘B1_H6’ -Now using LVDS Driver Board (at 4V) and 1m tw. pair cable -Powering Hybrid at 2.5V, readout fine, draws ~3A during tests. (Before: ~3.3V, >4.5A) -Now running ‘script mode’ (‘.x myTest.cpp’): No more GUI clicking, no need to sit next to system -> Run for many hours using loops. WP3; 30 July

Atlys+ABCN250-Hybrid at B'ham (2) (Juergen, AndyC, SimonH) John Wilson, Phil Allport, Simon Pyatt, Sam Edwards, Juergen Thomas, James Broughton, Kostas Nikolopoulos, Andy Chisholm, Simon Head Taken TrimRange run and loaded values into SCTVAR/config (see output below): Much smoother outputs, slimmer histos Next steps: Get better in running script mode. Run again with second hybrid (‘B2_H7’, our best production-wise). Setting up a Linux (SLC6) PC in lab, already compiled DAQ s/w on SLC6 (using ‘waf’). When done, connect Atlys and hybrid. WP3; 30 July