SMART INCO-MED 5 th Management Board Meeting, January 17-18 2005 Grenoble, France DDr. Kurt Fedra ESS GmbH, Austria

Slides:



Advertisements
Similar presentations
DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.
Advertisements

Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC.
1 OPTIMA INCO-MPC Third Management Board Meeting, May 18/ Gumpoldskirchen DDr. Kurt Fedra Environmental Software & Services GmbH A-2352 Gumpoldskirchen.
SMART INCO-MED kick-off meeting, January 5/ CEDARE, CAIRO DDr. Kurt Fedra ESS GmbH, Austria Environmental Software.
1 Final Review SUTRA: Sustainable Urban Transportation Final Review Gdansk, June 23/ DDr. Kurt Fedra ESS GmbH, Austria
By Mohamed Al-Aawah Disaster Risk Reduction Programme UNESCO Cairo Office.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Implementation of Project Governance at the Center Level
Recent international developments in Energy Statistics United Nations Statistics Division International Workshop on Energy Statistics September 2012,
06/12/ CYPADAPT “Development of a national strategy for adaptation to climate change adverse impacts in Cyprus “ Professor Maria Loizidou National.
Towards the comparative analysis of the case studies: operative steps Carlo Giupponi 1,2 and Gretel Gambarelli 2,3 1 Università degli Studi di Milano 2.
1 Analytical Tools, Data & Scenarios Workshop July 29, 2004 California Water Plan Update 2004.
K.Fedra ENV-e-CITY WP 8, T8.3: Business Model (updates, June 2003) DDr. Kurt Fedra ESS GmbH, Austria Environmental.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy.
Goal and Scope Where are we going and what path will we be taking?
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
OVERVIEW OF INTEGRATED WASTE MANAGEMENT IN WEST AFRICA (IWWA)
HITERM High-Performance Computing and Networking for Technological and Environmental Risk Management HITERM Dr. Kurt Fedra Environmental Software & Services.
SMART Sustainable Management of Scarce Resources in the Coastal Zone WP04: DATA COMPILATION AND ANALYSIS 13–15 June 2003 Beirut, LEBANON DOKUZ EYLUL UNIVERSITY.
Work Package 9 Impacts of ecotourism WP coordinators:  Charles Darwin Foundation (Galapagos Marine Reserve, Ecuador)  ECOLAP/ Universidad de San Francisco.
Towards the comparative analysis of the case studies: current and next steps Carlo Giupponi 1,2 1 Università degli Studi di Milano 2 FEEM SMART Workshop.
The Preparatory Phase Proposal a first draft to be discussed.
Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Overview of activities of the first six months and of the.
1 OPTIMA INCO-MPC Project kick-off Meeting, October 28/29 Malta DDr. Kurt Fedra ESS GmbH, Austria Environmental Software.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
SMART INCO-MED 4 th Management Board Meeting, September , Hammamet, Tunisia DDr. Kurt Fedra ESS GmbH, Austria
Luisa Franconi Integration, Quality, Research and Production Networks Development Department Unit on microdata access ISTAT Essnet on Common Tools and.
SIXTH FRAMEWORK PROGRAMME FP INCO-MPC-1 MEditerranean Development of Innovative Technologies for integrAted waTer managEment.
K.Fedra ‘05 1 Water Resources Simulation and Optimization: a web based approach MSO August 2005, Aruba DDr. Kurt Fedra ESS GmbH, Austria
SMART Workshop Hammamet September Universidade Atlântica - Portugal WP 10 Comparative policy analysis.
OPTIMA Optimisation for Sustainable Water Management corridoio.zero Multidisciplinary Laboratory for Exchanges with the Balkans and the Mediterranean Region.
LOGO of SL Introduction to the NEEDS project SIXTH FRAMEWORK PROGRAMME [6.1] [ Sustainable Energy Systems] Andrea Ricci, coordinator ISIS Cairo, 28 January.
Roberta Camera Valerie Cogan Beirut 12 | 06 | 03 Requirements and Constraints Analysis D01.1.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
SMART INCO-MED 1 st Management Board Meeting, June NCRS, Beirut DDr. Kurt Fedra ESS GmbH, Austria Environmental.
1 OPTIMA INCO-MPC Third Management Board Meeting, May 18/ Gumpoldskirchen DDr. Kurt Fedra Environmental Software & Services GmbH A-2352 Gumpoldskirchen.
WP 9: 1 st Planning meeting summary Clarification between WP members of common objectives: Workshop planning and logistics with time- line Planning for.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
African Centre for Statistics United Nations Economic Commission for Africa Proposed Framework for Monitoring, Evaluation and Reporting Negussie Gorfe.
Coordinating an Observation Network of Networks EnCompassing saTellite and IN-situ to fill the Gaps in European Observations Kick-Off Meeting, February.
Work Package 6 L2C Kick-off meeting Fontainebleau, March 7th 2006.
THE INTERACT PROGRAMME Contents:  Objectives  Delivery structure  Services  Themes  Target Groups and Networks  What is new?  Status of Knowledge.
NATO CCMS Pilot Study Meeting, Athens 2006 | Slide 1 Applying Innovative Land Remediation Johan van Veen (TNO) NATO CCMS Pilot Study Meeting Athens, June.
1 OPTIMA INCO-MPC Fourth Management Board Meeting, December 19/ Milano DDr. Kurt Fedra Environmental Software & Services GmbH A-2352 Gumpoldskirchen.
UNSD Recent international developments in Energy Statistics.
CRISP 1 st Workshop June 20, 2001 Communication and Dissemination Status of work Sylviane Nibel, CSTB (F)
DSS for Integrated Water Resources Management (IWRM) Success and failure DDr. Kurt Fedra ESS GmbH, Austria Environmental.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Water Bodies in Europe: Integrated Systems to assess Ecological Status and Recovery Funded under FP7, Theme 6: Environment (including Climate Change) Contract.
SMART INCO-MED 2 nd Management Board Meeting, September , Izmir, Turkey DDr. Kurt Fedra ESS GmbH, Austria
Development Account: 6th Tranche Strengthening the capacity of National Statistical Offices (NSOs) in the Caribbean Small Island Developing States to fulfill.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
CASE STUDY: LITANI LOWER BASIN Progress Gumpoldskirchen May 2006.
Brussels, January 16th, Overview and status of the project.
MULTIPLIER EVENT January , Brussels.
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
Prof. Maria Loizidou Nicosia, Hilton Park Hotel, 15th June, 2006
WP5: Dissemination, studies, web portal and tools
JRC’s Follow-up work to improve GES assessment
The basics ESSnet on SDMX prepared in 2008/2009
Energy Statistics Compilers Manual
ESS.VIP ADMIN EssNet on Quality in Multi-source Statistics, progress report 19TH WORKING GROUP ON QUALITY IN STATISTICS, 6 December 2016 Fabrice Gras,
The GEOSTAT project Work Package 2 Geostatistics Working Party/Meeting
Projects under Pillar I of White Paper on Climate Change Adaptation
OPTIMA INCO-MPC Management Board Meeting, April 1/ Izmir
OPTIMA INCO-MPC Project Kick-off Meeting, October 28/ , Malta
OPTIMA INCO-MPC Management Board Meeting, April 1/2 2005, Izmir
Presentation transcript:

SMART INCO-MED 5 th Management Board Meeting, January Grenoble, France DDr. Kurt Fedra ESS GmbH, Austria Environmental Software & Services A-2352 Gumpoldskirchen DDr. Kurt Fedra ESS GmbH, Austria Environmental Software & Services A-2352 Gumpoldskirchen

SMART: Project Overview 09:15 – 10:15 3 year duration to August 2005 Started: September 2002 Current PM: 29 of 36 Or about 80% !!! 7 months left. 3 year duration to August 2005 Started: September 2002 Current PM: 29 of 36 Or about 80% !!! 7 months left.

SMART: time table

SMART

SMART: Work Plan Phases 1.Requirements analysis, data availability, specifications 2.Data compilation, tool development 3.Parallel case studies 4.Comparative evaluation, dissemination. 1.Requirements analysis, data availability, specifications 2.Data compilation, tool development 3.Parallel case studies 4.Comparative evaluation, dissemination.

SMART: Milestones 1 PM 09 End of preparatory phase, first workshop – DELAYED (1 month) 2 PM 12 Methods and tools prototypes ready, start of operational phase 3 PM 18 Case studies implemented, first results of scenario analysis ??? 4 PM 24 Analysis and assessment phase 5 PM 30 Case studies completed, comparative analysis 6 PM 36 Project and reporting completed 1 PM 09 End of preparatory phase, first workshop – DELAYED (1 month) 2 PM 12 Methods and tools prototypes ready, start of operational phase 3 PM 18 Case studies implemented, first results of scenario analysis ??? 4 PM 24 Analysis and assessment phase 5 PM 30 Case studies completed, comparative analysis 6 PM 36 Project and reporting completed

SMART: work packages WP 01: Requirements and constraints analysis completed WP 01: Requirements and constraints analysis completed

SMART: work packages WP 02: Socio-economic framework and guidelines nominally completed, indicator definitions and data compilation/analysis not yet completed WP 02: Socio-economic framework and guidelines nominally completed, indicator definitions and data compilation/analysis not yet completed

SMART: work packages WP 03: Analytical tools, models SOGREAH, PM 3-18 TELEMAC (scenarios completed ?) WaterWare (LUC, RRM, WRM) Nominally completed, web implementation of LUC, RRM, WRM complete, but no fully operational (calibrated) or complete scenarios yet. HOW TO PROCEED ? WP 03: Analytical tools, models SOGREAH, PM 3-18 TELEMAC (scenarios completed ?) WaterWare (LUC, RRM, WRM) Nominally completed, web implementation of LUC, RRM, WRM complete, but no fully operational (calibrated) or complete scenarios yet. HOW TO PROCEED ?

SMART: work packages WP 04: Data compilation and analysis SUMER leads, PM 6-24 Includes parallel sub-tasks, one for each case study/country SHOULD BE COMPLETED !!! Deliverable due in February. WP 04: Data compilation and analysis SUMER leads, PM 6-24 Includes parallel sub-tasks, one for each case study/country SHOULD BE COMPLETED !!! Deliverable due in February.

SMART: WP04 1.Develop meta-data structure 2.Formats, technical specifications 3.Coverage and resolution (space and time) 4.Develop checklists 5.Monitor compilation: WHERE ARE WE ??? 6.DATA BASE IMPLEMENTATION (on-line, with ESS) 7.Comparative analysis (completeness, consistency, plausibility) 1.Develop meta-data structure 2.Formats, technical specifications 3.Coverage and resolution (space and time) 4.Develop checklists 5.Monitor compilation: WHERE ARE WE ??? 6.DATA BASE IMPLEMENTATION (on-line, with ESS) 7.Comparative analysis (completeness, consistency, plausibility)

SMART: WP04 OBJECTIVE and PRODUCT (the PLAN): Common, consistent data base Extensive documentation/Meta data ! On-line access and analysis Accessible from the project web site with interactive display and basic on-line analysis tools: GIS, TimeSeries Map server at CEDARE – Egypt CS example on-line – any data submitted ? OBJECTIVE and PRODUCT (the PLAN): Common, consistent data base Extensive documentation/Meta data ! On-line access and analysis Accessible from the project web site with interactive display and basic on-line analysis tools: GIS, TimeSeries Map server at CEDARE – Egypt CS example on-line – any data submitted ?

SMART: WP04 1.Common Land Use classification (CORINE) 2.INDICATORS (WP2/WP10): FEEM/UATLA: TO BE FINALIZED 3.BASIN DATA, MODEL INPUTS and SCENARIOS 1.Common Land Use classification (CORINE) 2.INDICATORS (WP2/WP10): FEEM/UATLA: TO BE FINALIZED 3.BASIN DATA, MODEL INPUTS and SCENARIOS

SMART: WP05-9 Scenario definitions (for all models !) : 1.Base line (calibration) 2.Business as usual 3.Worst case 4.Optimistic incomplete according to the SUMER spreadsheets, no operational on-line scenarios ready to run/analyse Scenario definitions (for all models !) : 1.Base line (calibration) 2.Business as usual 3.Worst case 4.Optimistic incomplete according to the SUMER spreadsheets, no operational on-line scenarios ready to run/analyse

SMART: work packages WP 05 – 09 Case Studies Respective partner, PM 12-30, Overlaps with data compilation Actual case study work to have started in September 2003 WHICH WAS 17 MONTHS AGO and should be completed !!! WP 05 – 09 Case Studies Respective partner, PM 12-30, Overlaps with data compilation Actual case study work to have started in September 2003 WHICH WAS 17 MONTHS AGO and should be completed !!!

Case Study reports: WP 05 – 09 Case Studies PM (NOW: 29 ?!), Overlaps with data compilation Actual case study work to have started in September 2003 WHICH WAS 17 MONTHS AGO and should be completed NOW. WP 05 – 09 Case Studies PM (NOW: 29 ?!), Overlaps with data compilation Actual case study work to have started in September 2003 WHICH WAS 17 MONTHS AGO and should be completed NOW.

Case Study reports: Reports are due: MAY 2005 Proposed content (common structure) Template for the reports: proposed on ~/SMART/casestudytemplate.html Build on WP01, WP04 Use model data bases/scenarios Use model results, screendumps Reports are due: MAY 2005 Proposed content (common structure) Template for the reports: proposed on ~/SMART/casestudytemplate.html Build on WP01, WP04 Use model data bases/scenarios Use model results, screendumps

Case Study reports: Tabular comparison of scenarios: Main assumptions (discuss, relate to WP02) 1.Structural change (network, strorage, sources) 2.Demand change (absolute, by sector – use model summary pages to document for common structure, easy comparison) 3.Allocation (priority/rule changes) 4.Efficiencies and losses 5.Performance (supply/demand, reliability, coastal WQ) Tabular comparison of scenarios: Main assumptions (discuss, relate to WP02) 1.Structural change (network, strorage, sources) 2.Demand change (absolute, by sector – use model summary pages to document for common structure, easy comparison) 3.Allocation (priority/rule changes) 4.Efficiencies and losses 5.Performance (supply/demand, reliability, coastal WQ)

SMART: work packages WP 10: Comparative analysis FEEM, PM Requires input from all case studies (FEEM presentation) Based on indicators and scenario definitions/results WP 10: Comparative analysis FEEM, PM Requires input from all case studies (FEEM presentation) Based on indicators and scenario definitions/results

SMART: work packages WP 11: Dissemination and exploitation ESS, PM 3-36 (Web server) EXPLOITATION STRATEGIES: CONTINUOUS UPDATES for the plans per partner and country (PPR 3). WP 11: Dissemination and exploitation ESS, PM 3-36 (Web server) EXPLOITATION STRATEGIES: CONTINUOUS UPDATES for the plans per partner and country (PPR 3).

WP 11: Dissemination Web site (images, links, contributions: don’t be shy, please do send material such as case study descriptions/extensions !!!Web site (images, links, contributions: don’t be shy, please do send material such as case study descriptions/extensions !!! Meetings, conferences, scientific and technical literature (CONFERENCES ?)Meetings, conferences, scientific and technical literature (CONFERENCES ?) Local workshopsLocal workshops NETWORKINGNETWORKING –Informal network, start with a common address data base – on-line ? INCOMPLETE, no activity reports Web site (images, links, contributions: don’t be shy, please do send material such as case study descriptions/extensions !!!Web site (images, links, contributions: don’t be shy, please do send material such as case study descriptions/extensions !!! Meetings, conferences, scientific and technical literature (CONFERENCES ?)Meetings, conferences, scientific and technical literature (CONFERENCES ?) Local workshopsLocal workshops NETWORKINGNETWORKING –Informal network, start with a common address data base – on-line ? INCOMPLETE, no activity reports

WP 11: Dissemination Web site, other material ?Web site, other material ? Meetings, conferences, scientific and technical literature, manuscriptsMeetings, conferences, scientific and technical literature, manuscripts Local dissemination workshops (planning ?)Local dissemination workshops (planning ?) SMART: the eBook ?SMART: the eBook ? Web site, other material ?Web site, other material ? Meetings, conferences, scientific and technical literature, manuscriptsMeetings, conferences, scientific and technical literature, manuscripts Local dissemination workshops (planning ?)Local dissemination workshops (planning ?) SMART: the eBook ?SMART: the eBook ?

WP 10: Evaluation Aggregated into Sustainability Indicators 1.Economic efficiency 2.Environmental compatibility 3.Equity (intra- and intergenerational) Aggregated into Sustainability Indicators 1.Economic efficiency 2.Environmental compatibility 3.Equity (intra- and intergenerational)

WP 10: Evaluation EASY PRACTICAL SOLUTION: Use the indicators directly generated by the models: 1.Supply/demand ratio (global and sectoral) 2.Reliability of Supply % 3.CWQ (TELEMAC) standard violations EASY PRACTICAL SOLUTION: Use the indicators directly generated by the models: 1.Supply/demand ratio (global and sectoral) 2.Reliability of Supply % 3.CWQ (TELEMAC) standard violations

WP 10: Decision Support Comparative analysis of cases/scenarios in terms of the indicators; THE PLAN: Participatory approach: Stake holders define criteria, objectives, constraints, and expectations – DSS tool finds the nearest feasible solution in the set of alternatives. Comparative analysis of cases/scenarios in terms of the indicators; THE PLAN: Participatory approach: Stake holders define criteria, objectives, constraints, and expectations – DSS tool finds the nearest feasible solution in the set of alternatives.

WP 10: Decision Support Participatory approach: current status Stake holders: contact, inform, involve. CURRENT STATUS: On-line Stakeholder DB with ~100 entries, but MANY incomplete: –NO ADDRESS !!! or Contact Person/details –WITHOUT activity reports. These are the central part – actors should at least have been informed, better asked, invited, involved. Participatory approach: current status Stake holders: contact, inform, involve. CURRENT STATUS: On-line Stakeholder DB with ~100 entries, but MANY incomplete: –NO ADDRESS !!! or Contact Person/details –WITHOUT activity reports. These are the central part – actors should at least have been informed, better asked, invited, involved.

WP 10Decision Support Reference point approach: nadirnadir utopiautopia A1 A2 A3 A4 better efficientpoint criterion 1 criterion 2 A5 dominated A6

WP 10: Decision Support SIMPLE SOLUTION: 1.Eliminate dominated solutions 2.Use UTOPIA as reference point 3.Show results to stakeholders, obtain/analyze comments BUT: it still needs a set of alternative scenario results from the models SIMPLE SOLUTION: 1.Eliminate dominated solutions 2.Use UTOPIA as reference point 3.Show results to stakeholders, obtain/analyze comments BUT: it still needs a set of alternative scenario results from the models

SUMMARY: PROJECT IS BEHIND SCHEDULE. Strategy for safe completion: 1.Withhold CS2 payments 2.Organize additional, individual model workshops (at ESS ?) 3.Use on-line tools (new data bases) for direct extraction of report contents 4.Submit DRAFT reports early PROJECT IS BEHIND SCHEDULE. Strategy for safe completion: 1.Withhold CS2 payments 2.Organize additional, individual model workshops (at ESS ?) 3.Use on-line tools (new data bases) for direct extraction of report contents 4.Submit DRAFT reports early