QA/QC Week 2006 Review of state wide results Waterwatch Coordinators Meeting September 8, 2006 Melbourne And strategising a plan for 2007.

Slides:



Advertisements
Similar presentations
Study Habits Successful students have good study
Advertisements

WELCOME TO FIRST GRADE North Topsail Elementary Schools Curriculum Night September 1, 2011.
JQuery MessageBoard. Lets use jQuery and AJAX in combination with a database to update and retrieve information without refreshing the page. Here we will.
Chair side Teaching Valuing the Experience? Students & Nurses Perspectives Lesley Pugsley, John Sweet & Jeff Wilson Cardiff University.
Volunteer feedback questionnaire analysis September 2009.
Equipment Edited by COSCON BPS BRIEF. Issue  Using Excel file submit EQP Event.
Educational Champion Training MODULE 3: Communication with Child and School © National Center for Youth Law, April This document does not constitute.
Educational Assistants role in Independence From critical need to FADE.
Introduction to Project Planning
ISE Ion Selective Electrodes Prepared By Michigan Department of Environmental Quality Operator Training and Certification Unit.
National Conference on Public Employee Retirement Systems: National Research Findings from a Survey of 500 Small Business Owners Nationwide.
Common Problems & Solutions to High Routine Immunization Coverage An Introduction to the RED strategy.
The Comparison of the Software Cost Estimating Methods
Important concepts in software engineering The tools to make it easy to apply common sense!
Monitoring and Pollutant Load Estimation. Load = the mass or weight of pollutant that passes a cross-section of the river in a specific amount of time.
Standard Operating Procedures l At l Call for help at Orlando Office Tallahassee.
Software Development Unit 6.
Water Quality Supplies Waste bottle 1413 solution pH 10 solution pH 4 solution Solution cups Water sample cup Hanna Meter.
Design and Technology – Rain Gauge Project
THE BIG ROCKS Time Management for Principals. Covey, 1989 pg.161 “The key is not to prioritize what’s on your schedule, but to schedule your priorities.”
AARP Tax-Aide FOR ALL AARP TAX-AIDE SITES.
Binary Arithmetic Math For Computers.
Algebra 1 R. Jenkins, M.S., M.A..
Skills and Techniques Lesson One. Our aim during badminton… Is to improve our performance by developing our understanding of skills and techniques: 
This is what BC Students told us…
The Ten Study Habits of Successful Students
 Basic Rules and Concepts  Conversation and Listening  Practices - Check Answers and Further Practice  Writing Practice  Checkpoint.
1 Reportnet for Noise: Feedback from member countries Colin Nugent Eionet National Reference Centres for Noise meeting Copenhagen October 2009.
SPORTS DEVELOPMENT EXECUTIVE Daisy Clarke. What is my role at CSSC? To review the overall provision of sport at CSSC Provide recommendations on how CSSC.
IB Business and Management Measuring the effectiveness of the Workforce.
Sphere Standards and Standard Spheres Dr. Richard Young Optronic Laboratories, Inc.
Good Practice for monitoring plans Viewpoint of a DOE Marco van der Linden, SGS Climate Change Programme
1 3132/3192 User Accessibility © University of Stirling /3192 User Accessibility 2.
To go to next page, click on Page- Chlorine testing with HACH colorimeters 22 Instrument care Wipe cells dry with lint free tissue before inserting into.
“It is not the critic who counts; not the man who points out how the strong man stumbles, or where the doer of deeds could have done them better. The credit.
Waterwatch Victoria QA/QC Week What is QA/QC Week? Mystery samples (2 ranges) for pH, EC, turbidity and orthophosphates and macroinvertebrates (6.
Soft skills training JUST A CALL AWAY When You Can’t Say YES.
Volunteer. Educate. Advocate. PowerPoint: The Good, the Bad and the Ugly Center for Microfinance, Nepal September 15, 2008.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
Protocol for inter-laboratory calibration of Male’s monitoring network Nguyen Thi Kim Oanh EEM/SERD, AIT Male’ Declaration 4 th Regional Stakeholders-cum-
Syllabus Talbot Middle School 8thGrade Science Syllabus
Changes to assessment and reporting of children’s attainment A guide for Parents and Carers Please use the SPACE bar to move this slideshow at your own.
Reception Reading Meeting Monday 21st September 2015.
Classroom Expectations English Classroom Greenview High School Marcy Winkelmann.
Proposal for a Global Network for Beam Instrumentation [BIGNET] BI Group Meeting – 08/06/2012 J-J Gras CERN-BE-BI.
Watewatch Victoria’s Statewide QA/QC Week 2007 July Process, expectations and outcomes.
Looking is showing that you’re paying attention and listening to what the teacher has to say. Don’t have side talks with your friend when the teacher.
Classic Connections: Innovative Methods for Making Education Work.
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
How to Revise well… By 10W. Equipment Creating good notes to revise from is important when working, the following equipment can help create imaginative.
Year 6 KS2 tests Tuesday 22 nd March. Overview of 2016 tests For 2016, a new set of KS2 national curriculum tests has been introduced consisting of: English.
School Based Intervention. Scenario In Mr. Smith’s class, homework is assigned three to four times a week. Students have been instructed to place completed.
STUDY TIPS FOR COLLEGE SUCCESS CPCC TRiO STUDENT SUPPORT SERVICES PERSONAL DEVELOPMENT SERIES.
The Five Reasons to Use Lighter Weights. Many people go to the gym and think that the goal is to lift the heaviest weight they possibly can, regardless.
Team Contracts We can work together! Copyright © Texas Education Agency, All rights reserved. 1.
Review of Trigger Effectiveness How Much is Enough? Rob Klausmeier, de la Torre Klausmeier Consulting, Inc. IM Solutions April 29,
Field Equipment Calibration PH, Temperature, Conductivity, Turbidity, Dissolved Oxygen, Free & Total Chlorine Gregory Langland CCSF.
109 Wardens Survey – 16/17 Season End of Season Get Together –
Writing a Constructed Response
EMSA 22 Lab Module 1 Field Equipment Calibration
An agency of the Office of the Secretary of Education and the Arts
Recruiting & Keeping Loyal Volunteers
Fall 2016 MATH 250: Calculus III.
Student Fellows Scheme: ‘Online Submissions for Creative Writing’
ASHRAE’S GOVERNMENT AFFAIRS COMMITTEE
i&r quality assurance on a shoestring budget
Welcome to Mrs. Andes’s Class
Tier One Report 2013 Welcome to the Tier One Report webinar. During this webinar, we will discuss a report that was built to help manage staff members’
From DePaul University Mission
Presentation transcript:

QA/QC Week 2006 Review of state wide results Waterwatch Coordinators Meeting September 8, 2006 Melbourne And strategising a plan for 2007

2006 demand compared with 2004/ Number of phys-chem sets ordered Number of macro sets ordered Number of phosphate std sets ordered -2025

Returned phys-chem datasheets 104% (50%-200%) 125% (75% - 180%) 85% (62% - 130%) Returned macro datasheets 70% (50 – 133%) 86% (0 – 220%) 65% (25%-120%) Returned phosphate datasheets -Too few returned 44% (0% - 80%) Return rate of datasheets 2006 compared with 2004/2005

Congratulations and THANKYOU to the following regions for exceptional datasheet return rates: Phys-chem (100% or greater): Corangamite Central Highlands Wimmera North Central Macro (100% or greater): Corangamite Central Highlands Mallee North Central North East

Samples wasted during this year’s QA/QC Week – phys-chem samples Despite there being a total 235 data sheets returned: the greatest number of participants for any one parameter/sample was 167 responses (75%, turbidity 1) the least being 136 responses (61% being for phosphate sample 2)

Working on a per sample basis, the amount lost in unused samples during this year’s QA/QC Week was $2786 (including macros and phosphate stds) As a percentage of total sample costs (minus pH samples), this loss was 35% of total sample preparation costs. We do not have the budget to support this sort of waste/loss each year.

The good, the not so good, and the ugly

The Good - Clear handwriting, QA/QC code included, almost all information filled in (EC cal missing), dilution information supplied, pH troubles clearly documented

Terrific to see monitors questioning the values they were measuring, I was so impressed with the number of thorough notes recorded on some datasheets. And so amused by the ‘sorry’ stories I received….

The Not So Good - Easy to read, but no calibration or dilution information, no information about instrument performance. Feedback = guesswork when there is no supporting information provided.

The Ugly - illegible handwriting, multiple results per datasheet. However most information was provided including calibration information, dilutions and instrument problems.

Ugly continued -

2006 results compared with 2004/5 Overall, good results for EC, not too bad for most turbidity readings, but phosphate reading needs work. Regional reports should provide more specific areas to focus efforts on.

EC Results All results above 80% this year, vast improvement. Right equipment resolution for range.

Turbidity (tube) results * Not shaken * test done at night indoors

Turbidity (meter) results

Ortho-P (comparator)

Ortho-P (colorimeter) results

Overall, parameter of most concern is PHOSPHATES, regardless of the equipment used. Colorimeters MUST be well maintained and checked often against calibration standards for accuracy. Otherwise, pressing the button is as accurate as reading from a colour guide while squinting. Dilution results were poor for Coordinators and Monitors Smart 2 range 0 – 0.978mg/l PO4-P Hach DR700/890 range 0 – mg/l PO4-P ±3% light refraction = 0.029mg/L P 0.024mg/L P

Plan for QA/QC Week 2007 How do we reduce wastage? Order less and make it stretch further? Individual regional orders of parameters and sample type? (eg 6 x ECsample1, 10 x Turbidity sample2) Introduce co-investment so that you are wasting half of your own $$ instead of all of ours (I’m serious) Other ideas...

How do we support volunteer monitors and improve these results in 2006/7? Regional DC Plan - scheduling of QC activities, including refresher training, shadow testing, mystery samples. Standard monitoring methodologies, including dilutions if used regularly in your region. Maintain calibration solutions, batteries, perishables. Regions are responsible for providing feedback and follow up support to monitors after QA/QC Week.

Macroinvertebrates results 2006 CoordinatorsCombined Pretty happy with Coordinators results, would hope to see 80% pass rates for families in the future too.

I have a story to confess about the Macro QA/QC. We were moving office and I was doing it on the rush one day with stuff just everywhere. I took out my first bug and started to ID it, turned back to grab a something or other (pen, tweezers, light, can't remember what) and knocked the lid-less vial onto the floor - bugs everywhere. I managed to find 3 but the little ones were camouflaged with the carpet + dirt so I just gave up. So a huge sorry for not sending in my bug QA/QC, shall not happen again. My favourite ‘Sorry, no bugs’ story (from a Coordinator) -