The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.

Slides:



Advertisements
Similar presentations
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
PVSS and JCOP Framework Organization, Support & News Oliver Holme IT-CO.
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
André Augustinus 16 June 2003 DCS Workshop Safety.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
ALICE DCS Meeting.- 05/02/2007 De Cataldo, Franco - INFN Bari - 1 ALICE dcsUI Version 3.0 -dcsUI v3.0 is ready and will be soon posted on the ACC site.
ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels.
1 Responsibilities & Planning DCS WS L.Jirdén.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
André Augustinus 9 October 2006 Interlocks update.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
60kW Thermosiphon control system
TS workshop 2004U. Epting, M.C. Morodo Testa - TS department1 Improving Industrial Process Control Systems Security Uwe Epting (TS/CSE) Maria Carmen Morodo.
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
ALICE PC Cooling System Sensor Marco Boccioli André Augustinus Giulia Fanti.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
External Data and DIP Oliver Holme 18 th January 2008.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
1 Infrastructure and DCS Presentation of the Infrastructure Controls aspect in the ALICE DCS Based on U ser R equirements D ocument …you should still know.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
MAUVE CO2 cooling review
Presentation transcript:

The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo

The SPD cooling system control The SPD cooling system is controlled by a dedicated Schneider PLC  Process Control functions: Common outlet pressure controlled by the liquid pump speed Common inlet pressure controlled by the compressor speed Operating cycle (Stop, Stand-By, Run and Recovery) General System Status (Alarm and Warning)  Distribution Control functions: the PLC doesn’t control the distribution lines except the OPEN- CLOSED-LOCKED status of each loop.

The SDP cooling plant In the rack on the left are located the pumps, the loop manifolds and all the relevant sensors and actuators to monitor and control the hardware. In the right rack are located respectively:  The local operator panel that allows for a full monitoring and plant control; The plant operation from this panel doesn’t require any PVSS project; however it will be mandatory for its integration in the DCS  The Schneider PLC;

Final communication scheme Alice HMPID ALICE DCS & detector DCS Process PLC MODBUS TCP/IP Gateway PLC TIM TS/CV SCADA CCC TS/CV SCADA Actual communication scheme In order to safely manage the communication between all the process PLCs of the ALICE experiment and the technical network, the TS/CV/DC group will install in the experimental cavern the Gateway PLC. Alice SPD Process PLC CCC = CERN Control Center TIM=Technical Installation Monitory TIM Available Digital programmable I/O (ex: relays for Interlocks) Gateway PLC MODBUS TCP/IP CCC TS/CV SCADA

The FW C&V prototype component PVSS 3.01 SP1 fwCoolingAndVentilation_0.14:  The JCOP has not yet officially released the component. It will be done in the next months after the collection of comments and suggestions from the 4 LHC experiments “SPD.scy” file:  Provided by the ST/CV group. Respects the naming convention EDMS  The time schedule for delivering to others sub- detectors the scy file is not yet available, but it is under discussion in the ST/CV group. For the HMPID it is foreseen not before the end of June No need to install OPC drivers

The FW C&V scy parser panel

The Plant and Loop configuration panels of the FW component

The synoptic panel of the SPD cooling plant Each sub-detector can provide a similar synoptic panel with the representation of the cooling system and possibly the detector. It can be integrated either in the FW component, either in the monitoring zone of the FSM control panel

Second example: the synoptic panel and cooling plant for the HMPID

The FSMs of the SPD and HMPID cooling plants and their integration in the DCS STOPSTAND-BY RUNRECOVERY Operating cycle OK WARNINGALARM General System Status Automatic recovering when the warning is over Cooling Once the plant is delivered, each detector has to integrate the plant control in PVSS using the C&V FW component. It is still under the responsibility of each sub-detector to integrate the cooling FSMs in the DCS FSM. A possible hierarchy is presented in figure. Details can be discussed case by case. In the ACC is under way the discussion of a project integrating, after the pre-installation phase, all the ALICE cooling plants in a unique control system. Exit on local RESET Severe alarm conditions

Synchronization tables COOLING Operating Cycle General System Status STOP OK STANDBY OK RUN OK WARNINGRUNWARNING ERRORSTOPERROR INFRACOOLINGHV PSLV PS OFFSTOPOFF STANDBY ON READYRUNON WARNING ERROR OFF NO_CONTROL WA_REPAIR ER_REPAIR PWS_FAILURE INTERLOCK INTERLOCK_WENT (Not yet final)

Conclusions The FW component and the scy file ( provided by the TS/CV group ) have been successfully tested with the SPD cooling plant; For the HMPID the scy file will be released not before the end of June 06, and for the remaining cooling plants the schedule is being studied; During the pre-installation, the cooling plant control has to be done at level of single sub-detector; therefore the corresponding cooling FSM has to be integrated in each DCS. Each sub-detector has to prepare a synoptic panel with the representation of the cooling system and possibly the detector. This user panel can be used in both the FW component and in the FSM control panel.