Discussion, Action Items, & Future Work Plan Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 –

Slides:



Advertisements
Similar presentations
30/10/09 Positron Workshop 1 Future Work Plan, Action Items, Future Meetings Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Advertisements

Ian Bailey University of Liverpool / Cockcroft Institute Target Design and Photon Collimator Overview EUROTeV: WP4 (polarised positron source) PTCD task.
Using Realistic Photon Spectra Mike Jenkins Lancaster University and The Cockcroft Institute.
Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
Simulations with ‘Realistic’ Photon Spectra Mike Jenkins Lancaster University and The Cockcroft Institute.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
Proposed machine parameters Andrei Seryi July 23, 2010.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
28/10/09 Positron Workshop 1 Introduction and Setting the Scene Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
1 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, --- BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima: T.Takahashi,
2015/10/261 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima:
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
Key luminosity issues of the positron source Wei Gai.
Positron Source General Update M. Kuriki(Hiroshima U./KEK) ALCW2015, April 2015,Tsukuba/Tokyo, Japan.
EUROTeV WP4 Report Polarised Positron Source Jim Clarke, on behalf of the WP4 team DESY Zeuthen STFC (Daresbury and RAL) University of Durham University.
Current standing of the undulator based ILC positron source Wei Gai AWLC 14 FNAL, May
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
15 th October CLIC workshop The CLIC/ILC common issues for the sources Jim Clarke and Louis Rinolfi.
Ian Bailey University of Liverpool / Cockcroft Institute UK Target Update EUROTeV: WP4 (polarised positron source) PTCD task I. Bailey, J. Dainton, L.
Target Mechanical R/D Magnetic Immersion Effects (Daresbury Experiment) Pass-Through/Seals (Vacuum, Water union)- leaks, survivability Thermal Loading.
Global Design Effort 1 Sources Parallel Session Summary Jim Clarke STFC Daresbury Laboratory.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
Undulator Based ILC Positron Source Parameters Wei Gai ANL ALLCPG 2011 March 20, 2011,
Welcome and Introduction to the Workshop Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
2016/1/271 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, Hiroshima: T.Takahashi,
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
Update on ILC Production and Capturing Studies Wei Gai, Wanming Liu and Kwang-Je Kim ILC e+ Collaboration Meeting IHEP Beijing Jan 31 – Feb 2, 2007.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
POSIPOL Berlin ILC/CLIC e + generation working group Wei Gai, ANL Louis Rinolfi, CERN Thanks to Omori-san for the coordination of the Webex meetings.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
Positron Source Update Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC 08, University of Illinois at Chicago, 17 th November 2008.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim ILC GDE Meeting DESY May 30 – Jun2, 2007 Work performed for.
Photon Collimator and Conversion Target Status I. Bailey University of Liverpool / Cockcroft Institiute Cockcroft Institiute.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
AD&I Meeting 23/6/10 Jim Clarke
Pair-Production Target
Positron Update ILC R&D Meeting/ March 12, 07 VB & JCS
AD & I : BDS Lattice Design Changes
CLIC Undulator Option for Polarised Positrons
ILC/CLIC e+ generation working group
Future Work Plan and Action Items
Beam Dump outline work plan (UK perspective)
ILC RDR baseline schematic (2007 IHEP meeting)
Summary for the Sources working group
Lithium lens and window tests
J. C. Sheppard SLAC September 29, 2006
Presentation transcript:

Discussion, Action Items, & Future Work Plan Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31 October 2008 The Cockcroft Institute, Daresbury Laboratory

Purpose of the Meeting Review the R & D Review the action items from the last meeting Understand the Minimum Machine proposals Plan Positron Source work for 2009 Be trained in EDMS and agree how we will use it

Aim of session Review action list Try to cover ongoing R&D and needs of Minimum Machine studies (note colour coding)  Set priorities for short term (ILC 08)  Medium Term (KEK April 09)  Longer Term (end 2009)  General comments/outstanding items Discuss future meetings of team  Webex only?  Workshop like this one?  At GDE events? Discuss Positron Source Team Area setup in EDMS

Undulator Generate beam test plan – Jim Horizontal magnet measurements required at some stage Electron beam tests required at some stage Modules need to be engineered for large scale production and operation Intermodule connections need engineering “Real” Undulator spectrums required for modelling of source – Duncan (next meeting) Write a Report on vertical test results – Nick/Duncan/RAL (next meeting) Store cryomodule safely so can be powered at a later date Alignment requirements justified/jitter studies/impact on polarisation – Duncan Complete 4m cryomodule & test (fix leak!) – Jim Jim R’s presentation in Chicago to Akira (straightness & training) – Jim Cross-check und parameters selected for minimum machine (probably easier) - RAL

Source Modelling Write-up undulator emittance effect – Wei (next meeting) How thick does concrete/other material need to be - Andriy Move undulator to 250GeV, reoptimise source parameters (und, target, OMD) - Wei Ongoing yield/polarisation evaluation with source design evolution (Wei) Operating scenario (hours in tunnel when off) – Nick/Marc suggest 200 hours per year, 10mSv allowed dose per year Write list of current simulation codes and objectives + input files – Ian Running at 50GeV for calibration (what is energy spread etc) – Wei Look at PTRAN losses in ANL simulations - Wei

Compton Continue DR stacking studies and work with DR group to ensure optimum solution - Frank cavity stability tests (LAL/KEK) - Omori Laser demonstration – Fabian Zomer, Vitaly ATF demo – Omori 2010/11 demo with new cavity of high gamma flux at ATF

Polarisation Write brief report justifying need for 5Hz positron spin flipping at some point and ability to reverse – Sabine (next meeting) Confirm investigation showing we can destroy polarisation in DR completely – Larissa Close contact with IP group polarimeter (Tony) Ensure spin survives to DR Electron spin also within undulator – Des Close contact with simulations group – spin track to IP Select spin rotator design (5GeV/400MeV?) – check concern of Alexander - Sabine

Collimation High power photon collimator needs to be studied  Study activation – Lei (next meeting) Positron collimation – design documented, needs updating as source evolves Variable aperture collimator needed for polarisation upgrade?

Target Complete Eddy current tests at Daresbury – Ian/Leo Store target properly – Ian/Jim Generate simulations to compare with experimental results – Jeff / RAL/Leo Pressure shock wave analysis – Stephan (next meeting) and numerical modelling later Energy compression before DR to be studied – Nick?/Wan Ming Lifetime studies of target (LLNL) Engineered solution, including prototype tests – water, vacuum, … Alternative liquid metal & window (BINP/KEK tests) – Junji RIA Ferrofluidic seal study information – Jeff Joint target for auxiliary & und source (3 X0 and 0.4 X0) Report on hybrid target scheme for ILC - Omori

OMD Li Lens  Evaluate level of radiation damage in window & implications for lifetime  Stress-strain in window with liquid flow  Thermal cycling fatigue  Cavitation wear on windows  Proton beam tests?  Contact experienced Li lens experts to discuss this idea (Jerry Dugan?) – Marc to provide names  KEKB BN window tests (liquid lead target)  Discuss with M Harrison (solid/liquid?)  Concern with liquid li containment in steel (Pavel)  Discuss with Harrison and create work package for 2009 – Jim/Nick/Marc/Jeff/Alexander/Wei Flux Concentrator  Need feasible design - Jeff

Remote Handling Preliminary use of detailed target model in Fluka – Luis/Lei/Andriy (next meeting) Collimator in RH (next mtg) Shielding thickness around target etc – Andriy (next mtg) - duplicated RH scenarios refined  Changeover times (requirement ties in with lifetime of kit in RH)  Replacement of pillow seals? Auxiliary source (needs RH as well) – KEKB?/Kuriki Pillow seals need R&D Need engineered design compatible with source layout (remove inconsistencies!) If yield increases then RH not needed (limited only?)

Integration Understand timing issues for ILC, work with DR group to look at options – Jim/Andy W Minimum machine integration with BDS etc - Norbert

EDMS work package Define structure - Jim Report back on EDMS status – ongoing action Ian/Lars

Auxiliary Source Define new specification for Auxiliary positron source – Jim Establish link with KEKB high intensity conventional source project – Jim/Kamitani

Meetings Discussion on future meetings of team … PMs ask for positron source team to attend the main ILC/GDE meeting each year – general agreement on this from team Next main event probably Autumn 2009 No decision on how we should meet at other times  Could have WebEx meeting 6 months out of phase with main ILC meeting (eg Spring 2009)  Could have Collaboration Meeting but concern raised over travel budgets