Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay, 05-06.10.2007.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
March, 11, 2006 LCWS06, Bangalore, India Very Forward Calorimeters readout and machine interface Wojciech Wierba Institute of Nuclear Physics Polish Academy.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
1 Laser alignment system Status report Leszek Zawiejski INP PAN, Cracow EUDET Annual Meeting 2008, October 6-8, Amsterdam, Holland W. Wierba, K. Oliwa,
Luminosity and beam calorimeter report E. Kouznetsova, DESY.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
1 FD Support and Pacman for GLDc 27 Aug Yasuhiro Sugimoto KEK.
Tracking Integration Challenges Y. meeting 2013/9/25.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
1 LumiCal Optimization and Design Takashi Maruyama SLAC SiD Workshop, Boulder, September 18, 2008.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
Ronen Ingbir Collaboration High precision design Tel Aviv University HEP Experimental Group Krakow2006.
Ronen Ingbir Collaboration High precision design Tel Aviv University HEP Experimental Group Cambridge ILC software tools meeting.
Beam Commissioning Marco Oriunno (SLAC), May 14, 2014 ALCW 2014, Fermilab Engineering Issues.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
Analysis of Beamstrahlung Pairs ECFA Workshop Vienna, November 14-17, 2005 Christian Grah.
Laser positioning system Status Wojciech Wierba, Krzysztof Oliwa, Leszek Zawiejski, Michał Karbowiak (diploma student) Institute of Nuclear Physics.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
Beam-Beam Background and the Forward Region at a CLIC Detector André Sailer (CERN PH-LCD) LC Physics School, Ambleside 22st August, 2009.
Fast Beam Diagnostics at the ILC Using the Beam Calorimeter Christian Grah, Desy FCAL Workshop February Cracow.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
Octobre MPI Munich VFCAL Report W. Lohmann, DESY Laser alignment system Infrastructure for sensor diagnostics Sensor test facilities FE design Labs.
Si sensors for LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
1 Laser alignment system Status report Leszek Zawiejski Eryk Kielar, Krzystof Oliwa, Wojciech Wierba, INP PAN, Cracow, Poland Wojciech Slominski, Jagiellonian.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
December 7, 2005DESY EUDET in FCAL VINCA, Belgrade Univ. of Colorado, Boulder, BNL, Brookhaven, AGH Univ., INP & Jagiell. Univ. Cracow, JINR, Dubna, NCPHEP,
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
BPM for FF test (ATF2) Vladimir Vogel KEK 2nd Nano Workshop, KEK, December 12, 2004.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
February 12-13, 2006 FCAL Collaboration Meeting INP PAN, Kraków, Poland Readout electronics for LumiCal – first approach Wojciech Wierba Witold Daniluk.
Laser Alignment System for LumiCal and BeamCal Arkadiusz Moszczyński, Wojciech Wierba, Leszek Zawiejski Institute of Nuclear Physics PAN, Cracow 22nd FCAL.
September 2007SLAC IR WS Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY Talks by M. Morse, W. Wierba, myself.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
1 LoI FCAL Takashi Maruyama SLAC SiD Workshop, SLAC, March 2-4, 2009 Contributors: SLAC M. BreidenbachFNALW. Cooper G. Haller K. Krempetz T. MarkiewiczBNLW.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
November, 7, 2006 ECFA06, Valencia, Spain LumiCal & BeamCal readout and DAQ for the Very Forward Region Wojciech Wierba Institute of Nuclear Physics Polish.
Octobre 2007LAL Orsay Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
Very Forward Instrumentation: BeamCal Ch. Grah FCAL Collaboration ILD Workshop, Zeuthen Tuesday 15/01/2008.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
Alignment of the CMS Tracker
Update of MVD services and requests
Layout of Detectors for CLIC
cooling and supports of the forward endcap EMC
Challenges of vacuum chambers with adjustable gap for SC undulators
IR Detector - Test cryostat : Machining
Assembly procedure – Inner Region
Summary of the FCAL Workshop Cracow, February 12-13
Laser positioning system
C.Clerc ILD session, ALCPG /03/2010
LumiCal mechanical design, integration with LDC and laser alignment
Integration issues at IHEP
Requirements of the support mechanics
on behalf of the FCAL collaboration
Integration and IR Hall
VELO-meeting January 25, 2007 Sub-projects: SX & SX
Luminosity and beam calorimeter report E. Kouznetsova, DESY
Presentation transcript:

Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,

Outline of talk Integration with LDC: Integration with LDC: LumiCal inner & outer radius, support, cables & cooling pipes patch, beam pipe shape, opening scenario. LumiCal alignment in push-pull concept: LumiCal alignment in push-pull concept: requirements, solutions, problems

Integration with LDC How to fix LumiCal? (~250 kg) How to fix LumiCal? (~250 kg) Where to put signal, power cables and cooling pipes? (~10-20 cm 2 ) Where to put signal, power cables and cooling pipes? (~10-20 cm 2 ) Beam pipe shape – minimize the material in front of LumiCal Beam pipe shape – minimize the material in front of LumiCal Opening scenario (Vertex, TPC maintenance) Opening scenario (Vertex, TPC maintenance)

LumiCal inside LDC LumiCal can be mounted to special support fixed to the ‘construction’ pipe. Cables and cooling water pipes can be feed out in the gap between TPC and ECal endcap. Space for connectors Access to connectors LumiCal has to be centered on the outgoing beam.

LumiCal mech. dimensions Inner active radius = 100 mm Inner mech. radius = 96 mm Outer active radius = 208 mm Outer mech. radius ~270 mm

Auxiliary systems Output digital links: max. 360 TP cables LVDS (estimated 180) Output digital links: max. 360 TP cables LVDS (estimated 180) Power cables: 180 power lines Power cables: 180 power lines Control cables (+clock): a few TP cables coax cables Control cables (+clock): a few TP cables coax cables Water cooling: ~4 copper pipes ~10 mm dia. Water cooling: ~4 copper pipes ~10 mm dia. Thermal insulation of the LumiCal to prevent temperature changes Thermal insulation of the LumiCal to prevent temperature changes

Beam pipe centered on detector axis Solution not convenient for BeamCal and vacuum (to small pipe diameter)

Beam pipe centered on outgoing beam Better for BeamCal and vacuum, the LHCal has to be centered on the outgoing beam. The beam pipe diameter between LumiCal and BeamCal has to be discussed more carefully.

Opening scenario It is not necessary to open and take out LumiCal for Vertex and TPC maintenance. It is not necessary to open and take out LumiCal for Vertex and TPC maintenance. But, to pull out TPC, it is necessary to disconnect cables and cooling pipes. But, to pull out TPC, it is necessary to disconnect cables and cooling pipes. Need space for connectors and access to cables and pipes. Need space for connectors and access to cables and pipes. For LumiCal maintenance (beam pipe exchange) it is necessary to install temporary support with movable cars. For LumiCal maintenance (beam pipe exchange) it is necessary to install temporary support with movable cars. Disconnect cables and cooling pipes Disconnect cables and cooling pipes Unscrew halfbarrels and move both LumiCal parts out. Unscrew halfbarrels and move both LumiCal parts out.

Two LumiCal’s alignment LumiCal x, y position with respect to the beam (incoming) should be known with accuracy better than ~700 µm (better ~ µm) (LumiCal’s will be centered on outgoing beam) LumiCal x, y position with respect to the beam (incoming) should be known with accuracy better than ~700 µm (better ~ µm) (LumiCal’s will be centered on outgoing beam) Distance between two LumiCal’s should be known with accuracy better than ~ µm (14 mrad angle) Distance between two LumiCal’s should be known with accuracy better than ~ µm (14 mrad angle)

Alignment measurement based on beam pipe and BPM.s Beam pipe (well measured in lab before installing, temperature and tension sensors for corrections) with installed BPM Beam pipe (well measured in lab before installing, temperature and tension sensors for corrections) with installed BPM (BPM’s also on outgoing beam?) Laser beams inside ‘carbon’ pipe (need holes, but possible) Laser beams inside ‘carbon’ pipe (need holes, but possible) Reflective laser distance measurement – accuracy ~1-5 µm, resolution ~ µm Mirrors glued to beam pipe Calibration of sensors procedure – detector push-pull solution (?) Calibration of sensors procedure after power fault (?)

Summary Very challenging project: Very challenging project: precisely positioned Si sensors (inner radius accuracy < ~4 µm), x & y alignment with respect to the beam < ~700 µm, distance between Calorimeters < ~100 µm, tilts < ~10 mrad. Alignment is a crucial task: Alignment is a crucial task: distance between LumiCals (z) should be known better than ~100 µm over 4.5 m. A lot of problems to be solved, a lot of work to be done… A lot of problems to be solved, a lot of work to be done…