Land Clearing. Aims of cleaning land 1.Remove the obstacles 2.Remove the topsoil.

Slides:



Advertisements
Similar presentations
Asexual Propagation.
Advertisements

H 2 O & CH 3 CH 2 OH A couple of polar molecules.
Bardia Baheri Rotary High Voltage Motor Physics project.
Site Grading Site Grading Civil Engineering and Architecture
Loading and Hauling.
Power Tools Safety. Portable Circular Saws Stock must be well supported in such a way that the kerf will not close and bind the blade.. Thin materials.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Log Rules. Tree versus Log Volumes Trees contain sections that resemble different geometric solids. Trying to fit one rule to approximate the entire tree.
Tree Planting Techniques Mark J. Platten CSU Extension Director, Teller County.
Earthwork Operations & Equipments
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
 Land class of our proposed site: Class Two  There may not be enough sunlight during some parts of the day to support plant growth because there are.
Tree Planting MMXI.
The Math of Maple Sugaring By Mary Carter GED /30/09 By Mary Carter GED /30/09.
Horticulture CD Unit C: Nursery, Landscape, and Gardening.
Girl and Boy Scouts know this equipment for this type of cooking as buddy burners and vagabond stoves. As with stick roasting, anyone can construct the.
Lecture 4 Excavating and Lifting
Front-End Loader Training.
Coal The goal of coal mining is to economically remove coal from the ground. Coal is valued for its energy content, and since the 1880s is widely used.
Landscape Pitfalls Myths, Mistakes, and Misconceptions.
Front shovel, back hoe and loader. Group member: Lam Wai Kei Hui Tan La
Projectile Motion Review Game
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
TRENCHING AND EXCAVATIONS
Soil Cultivation. Introduction By cultivation we mean the preparation of the soil for sowing or planting by digging, rotavating or ploughing. In a domestic.
Foundations and basements
E4014 Construction Surveying
Instructions 1.  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
MAINTENANCE PART 2. Inlet free of obstructions Inlet free of obstructions Adequate scour protection provided.
Construction Analysis Hydrographs
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
Vocabulary Words Landform- Examples; mountains and hills.
CONSTRUCTING A FIVE CABIN LATRINE
By Catherine Fontenot LTEC /29/ Preparations for your tree Preparations for your tree The tools you will need for the job The tools you.
Erosion and Deposition
Flight. Floaters A floater does not really fly but, rather the wind controls the speed and direction of flight. Gliders Gliders have wings that interact.
Lecture 6 Loading and Hauling
Soil Science Faculty of Agricultural and Applied Biological Sciences Ghent University.
Humans are causing the sahel region to shrink, making the desert grow larger each year.
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Kite Science Why a Kite Flies?.
Surface Drainage Crown (flat A shape) c Dirt & Gravel: 1/2” - 3/4” per foot (4 - 6 inches in 10 feet)
Chapter 19 Urban Soil. Problems With Urban Soils Problems differ between Rural Growers and Urban Soil Users Problems differ between Rural Growers and.
Lecture 2 Introduction to Earthmoving
E4014 Construction Surveying Pavement Setout. Road Construction Consists of a number of sequential steps –clearing –earthworks –drainage works –pavement.
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
Preparing Foundations for Cylinders & ASME Tanks
Reclaiming Surface Mines ©2007 Dr. B. C. Paul. Mines That Can Be Concurrently Reclaimed  Area Strip Mines and Most Contour Strip Mines can be reclaimed.
Run Off Water. Run off water is a result of water not being able to be absorbed by the surface of the ground. Gravity pulls the run off water along the.
Materials needed: a tree in a pot, shovel, watering can, poles, garden scissors, hammer.
Weathering and Soil Formation
Planting landscape trees by Edward F. Gilman, professor Environmental Horticulture Department University of Florida
Soil Compaction Topic I Topic I.
Site where the cabins will be build Two cabins put up at Stenshult.
Erosion and Deposition
This house sits on the top of a hill that is covered with loose soil and rocks. The new owners of this house have some concerns about their property. What.
Chapter Review. 1. Two forces are applied to a stump by two tractors. One is a 150 N force to the east. The other is 100 N in a direction 35°
This is a self-propelled hovercraft, designed to use only one motor which will both lift the vehicle and propel it forward. The hovercraft works by creating.
Forestry Science I Unit 4: Wildfires Lesson 2: Fire Behavior Prepared by Chad Bass December 5, 2001 To accompany Georgia Agriculture Education Curriculum.
{ 4.2 Low-pressure systems can become storms.  A tropical storm is a low-pressure system that starts near the equator and has winds that blow at 65km/h.
August 2008 Preparing the Planting Site Developed by: Dr. Teri Hamlin Georgia Department of Education.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
HYDROGRAPHS: CONSTRUCTION AND ANALYSIS 01/10/2016.
3. LAND CLEARING AND DEVELOPMENT OPERATION AND EQUIPMENT
1. Where the line cuts the coordinate axes
FVCC Fire Rescue LADDERS PART B.
Planting Forest Trees.
North Carolina's Selective Vegetation Removal.
Presentation transcript:

Land Clearing

Aims of cleaning land 1.Remove the obstacles 2.Remove the topsoil

Remove the obstacles 1.All vegetation e.g. bushes, scrub 2.Roots of trees and bushes 3.Rocks Then the site will be leveled for construction. Also, the equipment and the service (e.g. water, electricity system and drainage ) will be accessed more easily.

Remove the topsoil Topsoil – under ground level about 150mm Since it contains organic material which decomposes, shrinks or swelling by changing moisture content. It will affect he concrete and mortar if it is used for backfilling.

The main sequence of clearing technique by using bulldozer

Above the ground level all vegetation above ground is removed first, leaving stumps and roots in the ground

For small trees (6 Inches or Less in Diameter, and Brush) Operate the bulldozer with the blade Inserts it slightly below the ground level Run straight and digging slightly Cuts, breaks off or uproots most of the trees and roots.

For medium trees (6 to 12 Inches in Diameter) set the blade of the bulldozer as high as possible to gain added leverage dozer put the blade lower travels forward again and digs the roots free by lifting the blade

For medium trees (6 to 12 Inches in Diameter)

As the tree falls, the bulldozer is backed up quickly to clear the roots

For large trees (over 12 inches in diameter) It is very difficult and dangerous Because: 1. gently and cautiously the tree for dead limbs that could fall and injure you 2. position the blade high and center it for maximum leverage 3. determine the direction of fall before pushing the tree over

For large trees (over 12 inches in diameter) The method is listed below: Opposite the direction of fall, make a cut deep enough to cut some of the large roots.

For large trees (over 12 inches in diameter) Cut side 2 and 3 To obtain greater pushing leverage, build an earth ramp. Then push the tree over. As the tree starts to fall, reverse the tractor quickly to get away from the rising root. After felling the tree, fill the stump hole so that water will not be collected in it.

For large trees (over 12 inches in diameter)

For small to medium area From outside to center –the operator rolls the unwanted materials to the outside and away from the uncut area.

For small to medium area From center to outside – the cut materials are rolled to the center.

For the slope area The unwanted materials are taken to the windrow at the edge of the slope. It is better to move downward to slope in order to obtain maximum efficiency and reduce fuel consumption.

Clearing technique (removing stumps from ground) Clearing blade with stinger is used –Stumps are pushed out form ground –The stinger is designed to be used as a knife –The edge of the blade is used for pushing For extremely large trees 1.cutting the lateral roots around the tree 2.Pushing the tree with the blade raised high to provide leverage

Clearing technique (removing stumps from ground) For extremely large trees 1.cutting the lateral roots around the tree 2.Pushing the tree with the blade raised high to provide leverage

Clearing technique (removing stumps from ground)

Earth ramp is needed on one side of the tree to gain greater pushing leverage

References Peurifoy R. L., Schexnayder C. J., Construction planning, equipment, and methods, 6th ed., Mc Graw Hill Newfoundland guidelines for clearing land Clearing, grubbing and stripping, 1/CH4.htm#fig4_4 McKay, John Kenneth. Building construction, Volume 4 / J.K. McKay ; Harlow, Essex : Longman Scientific & Technical, Seeley, Ivor H. Building technology 4th ed. Ivor H. Seeley Houndmills, Basingstoke, Hampshire : Macmillan, 1993

Group members Vicky Lam (QS) Tina Hui (QS)