Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1 Vorlesung Informatik 2 Algorithmen und Datenstrukturen (Parallel Algorithms) Robin Pomplun.
Kapitel S3 Astronomie Autor: Bennett et al. Raumzeit und Gravitation Kapitel S3 Raumzeit und Gravitation © Pearson Studium 2010 Folie: 1.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
UNITED NATIONS Shipment Details Report – January 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
Grundsätze und Herausforderungen der -Archivierung | SER Forum | Dr. Ulrich Kampffmeyer | PROJECT CONSULT Unternehmensberatung | 2007
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Universität Kaiserslautern Institut für Technologie und Arbeit / Institute of Technology and Work 1 Q16) Willingness to participate in a follow-up case.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
VPN AND REMOTE ACCESS Mohammad S. Hasan 1 VPN and Remote Access.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Was studierst du? Kapitel 4. 4 | 2 Copyright © Cengage Learning. All rights reserved. Present tense of werden.
CpSc 3220 Designing a Database
Traktor- og motorlære Kapitel 1 1 Kopiering forbudt.
Presentation transcript:

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 1 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 1 Messnetzaufbau, Datenfluss und Datenweitergabe im Hamburger Luftmessnetz Structure: I.Übersicht / Struktur II.Datenfluss in der Messstation III.Messnetzzentrale IV.Datenweitergabe

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 2 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 2 Hamburger Luftmessnetz - Stationen 6 Stations for the urban background 4 Traffic stations 6 Ozone stations 4 special Stations (on behalf of external customers)

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 3 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 3 Hamburger Luftmessnetz – Struktur

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 4 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 4 Hamburger Luftmessnetz – Hardwarestruktur der Messnetzzentrale

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 5 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 5 Analysator NO/NO 2 /NOx Hamburger Luftmessnetz – Struktur der Messstation Analysator SO 2 Analysator PM10 Analysator XYZ PC ISDN Täglicher Statusreport / Kalibrierdaten (Ergebnisse des Funktionstests, automatische Korrektur von Null- Punkt und Kalibrierpunkt, Ausfälle von Geräten, Wartung) 5 sec. Abtastrate 1 min. Mittelwert (1 Woche) 10 min. Mittelwert (1 Monat) Station

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 6 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 6 Hamburger Luftmessnetz – Hardware- Konfiguration der Zentrale

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 7 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 7 10 min. Mittelwerte (automatischer Daten- Abruf jede Stunde) ISDN Standardmäßige Nachbehandlung Nur Visualisierung! 1 min. Mittelwerte (nur manueller Datenabruf) Datenbank Rohwerte (werden NIE verändert) Auf Nachfrage:Stündlich:

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 8 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 8 Markiere Werte als vorläufig ungültig, z.B. bei: - Negativen Werten - zu hohen Sprüngen - konstanten Werten Erster Plausibilitäts-Check im Verlauf einer Standard-Nachbehandlung Übertrage Werte in die Fertig-Datenbank Werte unterhalb der Nachweisgrenze werden auf die halbe Nachweisgrenze gesetzt. Stündlicher Datenfluß

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 9 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 9 Ein Blick auf den Bedienungs-Arbeitsplatz – die Warte

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 10 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 10 Oberfläche zur Steuerung und Bedienung des Messnetzes

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 11 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 11 (back) Visualisierung der Messwerte unmittelbar nach deren Abruf

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 12 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 12 Export von Halbstunden- und Stundenwerten zur aktuellen, automatische Veröffentlichung der Messdaten. Incl. Hinweis darauf, dass dies vorläufige, ungeprüfte Messdaten sind! InternetTeletextautom. AnsagetelefonDeutscher Datenaustausch Aggregierung von Halbstunden- und Stundenmittelwerten Automatische Veröffentlichung, stündlich:

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 13 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 13 (back) Datenformat Datenaustausch

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 14 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 14 Datenformat Telefonansage

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 15 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 15 Messwertausgabe Videotext

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 16 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 16 Internetdaten Hamburger Luftmessnetz Startseite

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 17 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 17 Internetdaten Hamburger Luftmessnetz Stationsdarstellung

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 18 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 18 Internetdaten Hamburger Luftmessnetz Monatsdaten

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 19 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 19 Kartenausgabe beim deutschen Datenaustausch Hier eine PM10-Episode Zu Ostern

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 20 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 20 Kartenausgabe beim deutschen Datenaustausch Hier eine Ozon-Episode im Sommer

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 21 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 21 Tages- und stundenaktuelle Belastungskarten für Deutsch- land im Internet

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 22 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 22 Deutschland- weite Stationsdaten- bank im Internet

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 23 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 23 Manueller Anstoß zum Export Tägliche Informationsmail FaxdienstOzonwarnung Täglicher Bericht zur Zeitungsveröffentlichung Aggregierung von Stunden- Und Tagesmittelwerten Manuelle Veröffentlichung, täglich oder nach Bedarf:

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 24 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 24 Ozoninformation per Fax an die Öffentlichkeit bei 1-h-Werten über 180 µg/m³

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 25 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 25 Täglicher Belastungsbericht an die Presse, Institutionen und Interessierte.

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 26 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 26 Monatliche und jährliche Daten- lieferungen für EoI an das Umweltbundes- amt

Dirk Matzen Hamburg Institute for Hygiene and Environment Bucharest, June 30 th to July 4 th 2008 Component 3, Monitoring the state of the environment Activity 3.1, establishment of an integrated monitoring system, air quality Mission on air quality monitoring and planning 27 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at National Level and Coordination of 8 Regional Twinning Projects Phase II 27 Vielen Dank für Ihre Aufmerksamkeit!