1 System Architecture Mark Herring (Stephen Merkowitz Presenting)

Slides:



Advertisements
Similar presentations
This document is not export controlled. Use or disclosure of this information is subject to the restrictions on the Title Page of this document 2.4m Space.
Advertisements

Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
POLICY Space Export Controls Update Since Delivering the 1248 Report to Congress - April 2012 −Congress added language into the FY13 National Defense Authorization.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
1 Interstellar Heliopause Probe M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010 Interstellar Heliopause Probe (IHP) System Design.
Payload Design Criteria for the Space Test Program Standard Interface Vehicle (STP-SIV) Mr. Mike Marlow STP-SIV Program Manager Payload Design Criteria.
Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
LISA 1 LISA/GAIA/SKA Birmingham. LISA A Mission to detect and observe Gravitational Waves O. Jennrich, ESA/ESTEC LISA Project Scientist.
Instrument, Spacecraft, and Launch Overview Joan Howard Ball Aerospace.
Spacecraft Subsystem Introduction to Space Systems and Spacecraft Design Space Systems Design.
Gateway to Space AJ - 1 Mechanical System Design & the StarLight Project Andy Jarski Mechanical Systems Engineer Ball Aerospace & Technologies.
Constellation Orion Visible Light Constellation Orion Infrared Light.
WFIRST Instrument reference information July 1, 2015.
Author Name Page 1 CNES’07 Peer Review 4/17/02 CNES’07 Mars Premier Peer Review Rendezvous and Sample Capture OS Beacon Electronics And Power System Mark.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
Level 1 - LRO Requirements ESMD-RLEP-0010
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
LISA Programme Jan 20, 2005 – LISA France.A.Gianolio – LISA status - 1 LISA Status LISA France College de France January 20-21, 2005 A. Gianolio LISA Project.
1 Project Name Solar Sail Project Proposal February 7, 2007 Megan Williams (Team Lead) Eric Blake Jon Braam Raymond Haremza Michael Hiti Kory Jenkins Daniel.
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
IMPRS June Organigram of ESA, in the late 1980s
G O D D A R D S P A C E F L I G H T C E N T E R 1 GW Interferometry at Goddard Space Flight Center Jordan Camp NASA / Goddard Space Flight Center Jan.
GWADW 2010 in Kyoto, May 19, Development for Observation and Reduction of Radiation Pressure Noise T. Mori, S. Ballmer, K. Agatsuma, S. Sakata,
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
1 LISA Science and Concept Robin T. Stebbins. 2 May 13, 2003 LISA Overview The Laser Interferometer Space Antenna (LISA) is a joint ESA- NASA mission.
MCAO Adaptive Optics Module Mechanical Design Eric James.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Earth Atmosphere.
1 Observatory I&T and Launch Campaign Flow Greg Jones May 20, 2009 JWST-PRES
Space-Qualified Hardware for the CALIPSO Lidar
08/31/2006 ~ Mission specific challenges: Data Analysis GRS Interferometry.
Dynamics Modeling and First Design of Drag-Free Controller for ASTROD I Hongyin Li, W.-T. Ni Purple Mountain Observatory, Chinese Academy of Sciences S.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
Science - Coronal heating - Coronal structure / dynamics - Elementary processes in Magnetic Reconnection Mission instruments - Optical Telescope / Vector.
14th Feb Page 1 LISA Mission Review Presentati on ESTEC, 14th Feb Prepared by the CDF* Team (*) ESTEC Concurrent Design Facility LISA Mission.
Henry Heetderks Space Sciences Laboratory, UCB
System Validation and Verification Testing for LISA Preliminary Concepts Jeffrey Livas, Nicholas Jedrich, Stephen M. Merkowitz, Robin T. Stebbins NASA/Goddard.
Final Version Dick Bolt Code 302 May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Success.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
G O D D A R D S P A C E F L I G H T C E N T E R 1 SMEX  Lite Modular Solar Array Architecture John W. Lyons.
Gravitational Wave Workshop Linthicum, MD Dec This presentation contains no ITAR protected information Group 1: No Drag Free Subsystem (also.
1 Initial Study Task Mark Herring / Jordan Camp. 2 May 13, 2003 Topics Purpose of Initial Study Task Schedule and Format Task Description.
Small Satellite Conference - GEMS Presentation August 12, 2009 Big Astrophysics in A Small Package Erin Walter GEMS Spacecraft Lead/Orbital.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
Final Version Gary Davis Robert Estes Scott Glubke Propulsion May 13-17, 2002 Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
Characteristics of remote sensing satellites. Satellites generally vary in their architecture Usually remote sensing satellites are having two plateforms.
WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1.
1 Integrated Modeling Stephen Merkowitz. 2 May 13, 2003 Integrated Modeling LISA has intricate interactions between subsystems that require an integrated.
EXTP Accomodation Study Hong Bin, Zhang Long Institute of Spacecraft System Engineering. CAST Oct 27th, 2015.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
V - 1 V. System Technology for Large Space Telescopes Session Chair: Juan A. Roman.
G O D D A R D S P A C E F L I G H T C E N T E R 1 Status of LISA Jordan Camp LISA Deputy Project Scientist NASA / Goddard Space Flight Center Jan. 19,
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Date of download: 5/29/2016 Copyright © 2016 SPIE. All rights reserved. Drawing of the Space Infrared Telescope for Cosmology and Astrophysics (SPICA)
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
GLAST Large Area Telescope
SDO Flight Dynamics Subsystem
Henry Heetderks Space Sciences Laboratory, UCB
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
THERMAL CONTROL SYSTEM
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

1 System Architecture Mark Herring (Stephen Merkowitz Presenting)

2 May 13, 2003 Launch and Cruise Delta IV medium launches all 3 spacecraft Each Spacecraft coupled to propulsion module – Delta-V = 1.22 km/sec – Bi-propellant system with RCS for attitude control – Prop module is controlled by S/C computer 13-month cruise phase Prop. Modules jettisoned during setup phase

3 May 13, 2003 Orbits Heliocentric orbit, trails Earth orbit by 20 degrees Constellation plane inclined 60 degrees with respect to the ecliptic Triangle rotates 1 degree per day (one complete revolution in one-year circuit) Constellation “breathes” ~ 1 degree per year Provides stable, low-disturbance environment – Thermal effects – Acceleration noise – Radiation

4 May 13, 2003 Spacecraft 2.7 meter diameter X 0.57 meter high (not including prop. Module) Aluminum honeycomb and CFRP Triple-junction GaAs solar array, 3.45 square meters Straightforward subsystem designs with extensive flight heritage Electronics mount on top and bottom plates, depending on thermal considerations

5 May 13, 2003 Payload Two key functions: – Proof mass control and disturbance reduction (DRS) – Strain measurement (IMS) Supporting elements include: – Structure (Y-tube), pointing mechanisms, payload computer

6 May 13, 2003 Payload ~ DRS/GRS Housing Proof Mass

7 May 13, 2003 Payload ~ IMS

8 May 13, 2003 Strawman Integration Flow NASA/JPLNASA/GSFCESA Initial Optical Integration Partial Payload Integration Payload STM S/C EM S/C Qual. Test Payload EM (ITAR-proofed) Final Payload Integration Payload EM Payload Flight Units (3) Payload EM S/C Flight Units (3) Constellation Test Final ATLO S/C Flight Fab. / Assy Payload EM  Flight Spare S/C EM  Flight Spare Observatory Integration S/C Flight Acceptance Test

9 May 13, 2003 Verification During I&T

10 May 13, 2003 Initial IMS Integration INTEGRATION COMPONENTS PERFORMANCE TESTS ENVIRONMENTAL TEST MODELING Dummy proof mass, ULE block, fiber, laser stabilization cavity, optics Wavefront quality, contrast, scatter, bond stability VibrationNone

11 May 13, 2003 Intermediate IMS Integration INTEGRATION COMPONENTS PERFORMANCE TESTS ENVIRONMENTAL TEST MODELING Optical bench, laser, CCD, phase modulator, phase detector, ultra- stable oscillator, electronics Detector noise, phase noise, laser frequency and amplitude noise, oscillator noise, pointing stability TV, EMI / EMCFrequency noise corrections, pointing, STOPG

12 May 13, 2003 Final IMS Integration INTEGRATION COMPONENTS PERFORMANCE TESTS ENVIRONMENTAL TEST MODELING Electro-optical bench, telescope, star trackers Wavefront quality, pointing actuation and stability, phase stability, IMS subsystem test Vibration, Thermal, EMI / EMC, Magnetic Frequency noise corrections, pointing, WFE at 5x 10 6 km, STOPG

13 May 13, 2003 GRS Integration INTEGRATION COMPONENTS PERFORMANCE TESTS ENVIRONMENTAL TEST MODELING Initial optical assembly, charge management unit, flight proof mass, proof mass housing, caging and vacuum assembly Charge control, proof mass actuation and control, vacuum level Vibration, TV, EMI / EMC, Magnetic GRS performance

14 May 13, 2003 Y-Tube Integration INTEGRATION COMPONENTS PERFORMANCE TESTS ENVIRONMENTAL TEST MODELING Final optical assembly, Aft Fiber, Payload C&DH FSW, Y-Tube Structure Pre-ship functional of GRS, Pre-ship functional of optical assembly, Pre-ship testing of thermal isolation, Pre-ship testing of phase readout, Pre-ship testing of laser stabilization Mass properties, EMI / EMC, Magnetic Acceptance level vibration STOPG, Frequency noise corrections, Pointing

15 May 13, 2003 Observatory Integration INTEGRATION COMPONENTS PERFORMANCE TESTS ENVIRONMENTAL TEST MODELING Spacecraft bus and payload Displacement sensitivity, alignment sensitivity, pointing control, wavefront quality, frequency noise, gravity gradient TV, EMI / EMCSTOPG, WFE at 5x10 6 km

16 May 13, 2003 Constellation Testing INTEGRATION COMPONENTS PERFORMANCE TESTS ENVIRONMENTAL TEST MODELING Three spacecraftMichelson sensitivity, frequency noise rejection, lock acquisition, spacecraft communication, data processing, constellation testing Thermal, Vibration, EMI / EMC, TV DRS Performance, pointing errors, frequency noise corrections, science data simulator

17 May 13, 2003 Final Integration STEPINTEGRATION COMPONENTS PERFORMANCE TESTS ENVIRONMENTAL TEST MODELING Final IntegrationThree spacecraft, Payload attach fitting, shipping container Functional tests for launch campaign None

18 May 13, 2003 Launch

19 May 13, 2003 Operations Concept After set-up, operations are straightforward – 1 science mode – Periodic interruption for “tuneup” IMS pointing HGA pointing DSN 34 meter antenna, X-band, 7kbps down / 2 kbps up JPL Mission Operations Center One or more Science Data Analysis center(s) Performance monitoring to determine schedule for tuning