14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September 29 30 The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Francis Perez ALBA Status.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Injection System with a Booster in Separate Tunnel T. Shaftan for the NSLS-II team.
1 Slow Global Orbit Feedback at Pohang Light Source (PLS) Heung-Sik Kang Pohang Accelerator Laboratory Pohang, Korea.
1 Enhancements to the Linac Coherent Light Source.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 1 G.Penco, M.Svandrlik Operation Uptime Maintenance Performance vs filling.
Diamond and the UK new light source Chris Christou, X-band workshop, Cockcroft Institute, 1 st December 2008.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Low Emittance RF Gun Developments for PAL-XFEL
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
RF 1/33 ALBA RF system why, how and other questions Francis Perez.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
Operational experience of high-power RF at Diamond Light Source
Power Supply & Electrical Engineering for sustainable science
Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University.
Laser-Undulator Compact X-ray source (LUCX) POSIPOL2006 Workshop at CERN 1/23 Experimental Plan of X-ray Generation using Optical Resonator using Optical.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Machine Operation and Studies at SSRF Wenzhi ZHANG Dec. 16, 2013 Spain.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
ALBA RF Systems Francis Perez.
Emanuel Karantzoulis– ESLS XXIII, November, PSI 1 Elettra Status and upgrades Emanuel Karantzoulis.
MAX IV linac overview and scope of automation Sara Thorin.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Injection System Update S. Guiducci (LNF) XVII SuperB Workshop La Biodola, Isola d'Elba, May 29 th 5/29/111.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Operation Status of the RF Systems and Taiwan Photon Source
Seesion1 summary Unwanted Beam Workshop (UBW 2012) Dark Current Issues for Energy Recovery Linacs.
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
PETRA III, Status and Upgrade
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Status of the ASTRID2 facility
Sara Thorin, MAX IV Laboratory
Status of the CLIC main beam injectors
Tango status at Elettra
WP11: electron and proton beam testing
Superbeams with SPL at CERN
Injection facility for Novosibirsk Super Charm Tau Factory
SuperB project. Injection scheme design status
Machine Operation and Progresses in SSRF
CEPC RF Power Sources System
LAL meeting on e+ studies, Oct. 2010
Operation Progress and Upgrade in SSRF
Advanced Research Electron Accelerator Laboratory
Overview LINAC BOOSTER STORAGE RING 100 Mev Commissioned in 2008
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
Status and New Developments of ALBA RF Systems
Presentation transcript:

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Past and Present Configurations From hours /year to the users

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September : Operations transition year Decay mode, 2 GeV (340mA) and 2.4 GeV (140) – FEL at 1 GeV. Top-up at 2 GeV (300mA) and 2.4 GeV (140) – FEL upgrades to 2 GeV to be users compatible; for the moment 1.8 GeV 130 nm. Fill: Any, mainly multibunch and on request hybrid. SB exists but not requested except for FEL.

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Machine Parameters

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Elettra’s new injector 2005 project funded 2007 autumn connection with SR 2008 Finished on time (3 March 2008 for user shifts already programmed since 2007) and within budget Difficulties with the booster main PSs Stability Reproducibility

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September MeV pre-injector Linac made of a thermionic gun, cathode Th306 Thales, a 500 MHz pre bunching cavity, an S-band 3 GHz bunching structure and two LIL (CERN) 5 m accelerating sections of about 50 MeV each providing thus ≥10 MeV /m. The sections are powered by a 3 GHz 45 MW pulsed Thales 2132A S–band klystron using a MDK modulator Performs quite well, still margin for improvement especially on the klystron discharges; many are false water/ambient temp stability is vital Spare gun and modulator constructed (redundancy)

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Booster

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September RF plant from Elettra (RF9) 500 MHz 60 kW (TV klystron ) and a 5- cell PETRA type cavity. Power transmission via coaxial line. The system performs well. Many problems mainly due to big PSs (also their controls); hard work of about 1 year main problems fixed Acceptable operations established. Booster operates at full cycle (2.5 GeV ) and up to 3 Hz Full energy injection to Elettra at any energy up to 2.4 GeV and any filling (multibunch, single bunch,few bunch) up to 2.4 Hz rep. rate with efficiencies up to 100% Booster / 2

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Booster PS faults

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Elettra Availability

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Elettra uptime

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September 29 30

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Includes air conditioning too

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Top Up Radioprotection measurements finished as scheduled by end of March However due to 2 low gap chamber installation during the April shutdown some more controls were required in May. Gating is provided via internet, some lines have also additional interface boards provided by the top-up team. On May 10, top-up operations for users was implemented at 2.0 GeV. On May 24, top-up operations for users was implemented at 2.4 GeV Implementation to the machine achieved in 1 year (2009)

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Refill / Top-up controller Next, fast dcct already installed will allow bunch to bunch fill

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Systems stability during top-up > 90% homogeneity within 1 mA in 56 hours

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September e-bpm system – ambient temperature effects No top up, current decay from 330 to 260 mA – slow drift of horizontal beam position in the middle of ID9 of about 7 um in 5 hours Top up at 300 mA – no drift, peak to peak 1.5 um Oscillations are due to the Libera e-bpm electronics being affected by ambient temperature oscillations in the Service Area (± 2 deg).

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Long term stability from 16/9/ :00 to 20/9/ :00 4  m 1.5  m Horizontal vertical for 102 hours

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September hours non stop RF trip Beam current

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Actual working projects Installed 2 low gap (9mm ) chambers Air cooling of hot points to increase the intensity (but users very reluctant) Ambient temp stabilization Realignment BBA 8 th corrector Photon bpm

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Present Conclusions Top up is now the regular mode of operations A big effort towards reproducibility and stabilization is under way Acknowledgements to : A. Carniel, S. Krecic, M. Vento and the operators G. Gaio, F. Giacuzzo, C. Scafuri, L. Zambon and the controls K. Casarin, E. Quai, G. Tromba, A. Vascotto and the radioprotection O. Ferrando and S. Ferry for simulations and algorithms …and certainly all members of the ODAC project

14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September Looking to the future (next 3 years ) Installation of skew elements and other improvements BUT most important: Should we continue with IOTs or move towards solid state? (assume that returning to klystrons is out of question?) I hope by the end of this workshop we can get some answer I wish all of you a very successful workshop