7 November 2003 Status of CNGS NBI2003 - presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.

Slides:



Advertisements
Similar presentations
General Infrastructures Services Department LIU-SPS external beam dump - Internal Review Civil Engineering Aspect for Option B (LSS4) 30/7/2014 Martin.
Advertisements

Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
Now2008 Paola Sala for the CNGS SBWG CNGS status Paola Sala, INFN Milano on behalf of the CNGS Secondary beam working group.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
Performance and Operational Experience of the CNGS Facility Edda GSCHWENDTNER, Dario AUTIERO, Karel CORNELIS, Ilias EFTHYMIOPOULOS, Alfredo FERRARI, Alberto.
The CNGS Operation and Perspectives l Edda Gschwendtner, CERN.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
WIN’11 CERN Neutrinos to Gran Sasso: The CNGS Facility at CERN l Edda Gschwendtner, CERN WIN’11, Cape Town, South Africa, 31 st Jan – 5 th Feb 2011.
Vacuum windows at JPARC Contents Introduction Vacuum windows at hadron beam line Helium gas cooling Vacuum windows at neutrino beam line primitive discussion.
1 T2K Beam Operation Summary (earthquake recovery and beamline survey) NBI 2012 T. Ishii (KEK) for the T2K beam group.
NBI CNGS Horns Status Presented by Sandry Wallon 1 NBI 2003 – KEK, Japan 7-11 nov CNGS Horns : Status 8 nov
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns.
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
The CNGS Facility: Performance and Operational Experience Edda GSCHWENDTNER, Karel CORNELIS, Ilias EFTHYMIOPOULOS, Alfredo FERRARI, Ans PARDONS, Heinz.
JPARC- Decay Volume M.Sakuda (KEK) 11 November Decay Volume Requirements Design 2. Construction Status 3. Summary and schedule In collaboration.
Q&A on T2K construction of beam line near detectors budget collaboration (contribution from each) T2KK.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
Electrical Discharge Circuit for CNGS Horn & Reflector PH/DT1 Group Meeting, 23 October 2007 Gilles MAIRE PH/DT1-IC Section Leader.
CNGS PROJECT STATUS D.Autiero 21/5/2003 General status 2003 Project review CNGS upgrade.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
6 April 2006E. Gschwendtner, CERN AB/ATB1 CNGS Project: Secondary Beam 1. Layout 2. Beam Instrumentation 3. Commissioning Plans for the Secondary Beam.
ATC/ABOC days, 24 January 2007Edda Gschwendtner1 CNGS : Status and Outlook Edda Gschwendtner, AB/ATB Summary of CNGS 2006 Reflector Repair OPERA Brick.
Overview of the KEK Neutrino Beam Facility and its Operation Summary after September 2000 FNAL) K.H. Tanaka for the KEK-PS Beam Channel Group.
Beam line Experiment area SC magnet Pion production target
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
CNGS Operation Summary Edda Gschwendtner, CERN. Outline Introduction CNGS Performance Highlights since last NBI 2010 in Japan Issues Summary 2E. Gschwendtner,
6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
Extraction and beamline progress B.Goddard TE/ABT.
Ans Pardons (with input from Jean-Marc Cravero) CERN CNGS Horn Experience (issues since NBI2010) Ans Pardons, CERN 1 NBI2012.
1 CNGS Electrical Services (PBS 5.5) S. AKHTAR - ST/EL.
29 June 2006 CERN Neutrinos to Gran Sasso Seminar for CERN guides, by K. Elsener 1 CNGS - CERN Neutrinos to Gran Sasso > “Neutrinos” and “Gran Sasso” >
20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 OUTLINE 1.Status 2.Preliminary conclusions of the CNGS Review Board (30.
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
WP2 13/07/2011M. Dracos1 Marcos Dracos IPHC-IN2P3/CNRS, Strasbourg.
Engineering studies for CN2PY secondary beam. LAGUNA-LBNO General Helsinki, 26/08/20141 F. Sanchez Galan (CERN) on behalf of the CERN Secondary.
Engineering studies for the Conceptual design of the LBNO Facility 1 F. Sanchez Galan (CERN) on behalf of the CERN Secondary Beam Working Group, With contributions.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
The target handling concept of the pbar- separator at FAIR M. Helmecke, V. Gostishchev, R. Hettinger, K. Knie 6th High Power Targetry Workshop Oxford.
Status of the FAIR pbar target: Target handling study (M. Helmecke)
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
CNGS Review 15 July 2003 M. Meddahi1 EVM for CNGS Definitions Pre-requisites Application to CNGS.
Heating and radiological
CNGS Run 2007: Radiation Issues
News and brief overview of Beamline plans for the next few months
Target and Horn status report
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
CNGS - CERN Neutrinos to Gran Sasso
Use of Beam Loss Monitor type detectors in CNGS muon station
Status of muon monitor R&D and construction
CNGS Project Overview Konrad Elsener.
CNGS horn / reflector in 2005: The story of the glass ring insulator
Teleconference ACS – FREIA 19th June 2017
East Hall under construction
Presentation transcript:

7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division

7 November 2003 Status of CNGS NBI presented by K. Elsener 2 before I start...

7 November 2003 Status of CNGS NBI presented by K. Elsener 3 OUTLINE 1. The CNGS beam 2. Schedule 3. Status of works 4. Summary Status of CNGS

7 November 2003 Status of CNGS NBI presented by K. Elsener GeV protons from SPS, fast extracted ( 2 x 10.5  s,  t=50 ms) 10 cm long graphite rods (13 segments, interspaced); total length 2 m;  = 5 / 4 mm 1. The CNGS beam Helium tanks

7 November 2003 Status of CNGS NBI presented by K. Elsener 5 p-beam target magazine monitor (BPKG)

7 November 2003 Status of CNGS NBI presented by K. Elsener kA 180 kA  = 2.45 m steel tube, t = 18 mm surrounded by 50 cm concrete; - NO COOLING - vacuum 1 mbar entrance window 2mm Ti exit window 50 mm steel Helium tanks

7 November 2003 Status of CNGS NBI presented by K. Elsener 7 V = 1 litre air-filled ionisation chambers (17 fixed + 1 moveable detector in both muon detection chambers) 800 m 100 m 1000m 67 m Helium tanks

7 November 2003 Status of CNGS NBI presented by K. Elsener 8

7 November 2003 Status of CNGS NBI presented by K. Elsener 9 CNGS + fixed target CNGS + LHC SPS supercycles for CNGS running with Fixed Target or LHC filling For 1 year of CNGS operation (200 days) we expect: (4.8x10 13 protons in SPS, 55% efficiency ) 4.5 x protons on target (“nominal”)

7 November 2003 Status of CNGS NBI presented by K. Elsener 10 SPS magnet cycle for CNGS – Sept. 2002

7 November 2003 Status of CNGS NBI presented by K. Elsener 11 SPS magnet cycle for CNGS – Sept. 2002

7 November 2003 Status of CNGS NBI presented by K. Elsener Schedule Note: due to PS/SPS stop in 2005 (decided in June 2002) -> start of CNGS now planned for 2006 instead of 2005

7 November 2003 Status of CNGS NBI presented by K. Elsener Status of works 3a. Civil Engineering – Phase I 12 October 2000

7 November 2003 Status of CNGS NBI presented by K. Elsener 14

7 November 2003 Status of CNGS NBI presented by K. Elsener 15 Proton beam tunnel – Feb. 2002

7 November 2003 Status of CNGS NBI presented by K. Elsener 16 Proton beam tunnel – April 2003

7 November 2003 Status of CNGS NBI presented by K. Elsener 17

7 November 2003 Status of CNGS NBI presented by K. Elsener 18 Target Chamber Service Gallery Horn Helium tank Air cooling unit (reserve) pump transformer strip-line beam

7 November 2003 Status of CNGS NBI presented by K. Elsener 19 Absorbed does in concrete walls of service gallery targe t side passage “horn” beam

7 November 2003 Status of CNGS NBI presented by K. Elsener 20 3b. Infrastructure Hadron stop + muon detector access galleries: (access via LHC – TI8) going towards completion (Jan. 2004) shot-crete 10% slope

7 November 2003 Status of CNGS NBI presented by K. Elsener 21 3c. Equipment Extraction from SPS + TT40 (common with LHC): concept tested successfully with beam; pulse shape for CNGS double pulse to be done

7 November 2003 Status of CNGS NBI presented by K. Elsener 22 Extraction from SPS – Timing foreseen for 10.5  s CNGS pulse: ( Note: two such pulses are needed, 50 ms apart ) SPS: 23  s CNGS needs: fast rise and fall time, 2% ripple over the full length of flat top

7 November 2003 Status of CNGS NBI presented by K. Elsener 23 extracted beam (8 Oct. 2003)  x = 1 mm,  y =0.6 mm

7 November 2003 Status of CNGS NBI presented by K. Elsener 24 3c. Equipment Proton beam (cf. M. Meddahi + R. Jones): magnets from Novosibirsk are arriving at a regular rythm (37 bends arrived, 1 st quad arrived ; corrector magnet design is finished) vacuum system design complete (except window -> L. Bruno) beam monitoring equipment under construction (except target monitor -> R. Jones)

7 November 2003 Status of CNGS NBI presented by K. Elsener 25

7 November 2003 Status of CNGS NBI presented by K. Elsener 26

7 November 2003 Status of CNGS NBI presented by K. Elsener 27 3c. Equipment (cont.) Target station (cf. L. Bruno): design progressing, shielding design approaching completion, target unit prototype under construction Horn/Reflector (cf. S. Rangod, S.Wallon, G. Maire) under construction (horn inner conductors: finished, under test) water cooling circuit in design phase electrical system: new capacitors ordered

7 November 2003 Status of CNGS NBI presented by K. Elsener 28 3d. Decay Tube + Windows (cf. A. Pardons): first decay tube sleeves have arrived at CERN long, difficult job to build the 1 km tube; (contractor has reserved a lot of time for vacuum testing...)

7 November 2003 Status of CNGS NBI presented by K. Elsener 29

7 November 2003 Status of CNGS NBI presented by K. Elsener 30 3d. Decay Tube + Windows (cont.) (cf. A. Pardons): exit window is already in the hadron stop chamber (ready) entrance window: exists, needs to be mounted vacuum pumps: ordered

7 November 2003 Status of CNGS NBI presented by K. Elsener 31 exit flange “in the box”

7 November 2003 Status of CNGS NBI presented by K. Elsener 32 3e. Hadron Stop (beam dump) (cf. A. Pardons): finished (except water cooling connections)

7 November 2003 Status of CNGS NBI presented by K. Elsener July 2003

7 November 2003 Status of CNGS NBI presented by K. Elsener Summary CNGS civil works are completed (phase I), hadron stop installed --> CNGS is “on schedule” for May 2006 Next major step on the site: --> installation of decay tube, then finalize civil works –> Aug. ’04 Our worries: welding decay tube, windows, beam stability, target rods, target monitor, shielding + radioactive handling,... (cf. the other CNGS talks) Main problem: m & m

7 November 2003 Status of CNGS NBI presented by K. Elsener 35

7 November 2003 Status of CNGS NBI presented by K. Elsener 36 V = 1 litre air-filled ionisation chambers (17 fixed + 1 moveable detector in both muon detection chambers)

7 November 2003 Status of CNGS NBI presented by K. Elsener 37 Examples:effect on  cc events horn off axis < 3% by 6 mm reflector off axis 3% by 30 mm proton beam on target< 3% off axis by 1 mm CNGS facility misaligned< 3% by 0.5 mrad (beam 360 m off) CNGS: effects of alignment errors – study the needs of remotely controlled movements

7 November 2003 Status of CNGS NBI presented by K. Elsener 38

7 November 2003 Status of CNGS NBI presented by K. Elsener 39 3b. Infrastructure other areas of CNGS: - crane in target chamber: contract adjudicated - ventilation: bids opened - water cooling systems: call for tender - electrical systems: in progress (using existing contracts)