District Five Upcoming Projects
Structures Estimated Value AA MD 648AA Over Cattail Creek500K – 1M CA MD 261 Over Fishing Creek 15M – 30M SM MD 5 Over Eastern Branch2.5M – 5M
Intersection Improvements Estimated Value AA MD 2 at Earleigh Heights Road/Magothy Bridge Road 5M – 10M SM MD 4 from MD 235 to Patuxent Boulevard2.5M – 5M AA MD 175 at Reece Road and Mapes Road – BRAC 10M – 15M AA MD 2 at Owensville Sudley Road2.5M – 5M AA MD 2 at MD 256 1M – 2.5M CA MD 2 at Mount Harmony Road2.5M – 5M AA MD 2 at Harwood Drive 1M – 2.5M
System Presevation Estimated Value AA MD 2 at MD 214 Concrete Overlay/Full-Depth Replacement 500K – 1M XY Area-Wide Resurfacing in Northern Anne Arundel County 5M - 10M XY Area-Wide Resurfacing in Southern Anne Arundel County 5M – 10M XY Area-Wide Resurfacing in Calvert County 5M – 10M XY Area-Wide Resurfacing in Charles County 5M – 10M XY Area-Wide Resurfacing in St. Mary’s County 5M – 10M
Pedestrian and Bicycle Improvements Estimated Value AA MD 424 from MD 3 to MD 450 1M – 2.5M XX District-Wide Sidewalk Retrofits 2.5M – 5M Traffic Barrier AA MD 10 from MD 177 to MD 695 1M – 2.5M XY District-Wide Traffic Barrier Improvements 500K – 1M Drainage Improvements AX MD 32 from Sappington Station Road to MD 175 1M – 2.5M AA I-97 Southbound West of East-West Boulevard 500K – 1M
Environmental AT Tree Planting at Various Locations in Anne Arundel 1M – 2.5M and Charles Counties AA MD 665 Broad Creek Stream Restoration/Wetlands 1M – 2.5M Replacement Signalization and Lighting Estimated Value XY District-Wide Signalization 2.5M – 5M XY District-Wide Lighting 1M – 2.5M AA Lighting at I-695 Interchanges with I-895 and MD 2 1M – 2.5M