26 Apr 2004RSWG G.Guaglio 1/4 Reliability Sub-Working Group False Dumps generation.

Slides:



Advertisements
Similar presentations
(x + 4)(x + 7) = x2 + 11x + 28 (x + 14)(x + 2) = x2 + 16x + 28
Advertisements

S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
LHC Machine Protection
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Etienne CARLIER AB/BT/EC
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
LHC Commissioning WG 27/03/ Commissioning of BLM system L. Ponce With the contribution of B. Dehning, E.B. Holzer, M. Sapinski, C. Zamantzas and.
MPSCWG 12/12/ Operational scenario of the BLM system.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Injection test? Mike Lamont For initial discussion.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
The Architecture, Design and Realisation of the LHC Beam Interlock System Machine Protection Review – 12 th April 2005.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
Eva Barbara Holzer IEEE NSS, Puerto Rico October 26, Beam Loss Monitoring System of the LHC Eva Barbara Holzer, CERN for the LHC BLM team IEEE Nuclear.
BIW May 2004 LHCSILSystemsBLMSSoftwareResults Reliability of BLMS for the LHC. G.Guaglio, B Dehning, C. Santoni 1/15 Reliability of Beam Loss Monitors.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
1 LHC vacuum Rossano Giachino Acknowledgments Jimenez,V.Baglin,J.C.Billy,I.Laugier Rossano Giachino November 2007.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
Premature Dumps in 2011 Acknowledgements: A.Macpherson, G.Papotti, M.Zerlauth M.Albert LHC Beam Operation Workshop December 2011.
Weaknesses of the LHC Machine Protection System Bernhard Holzer, CERN BE-ABP... what a MPS should do: 2 major tasks * protect the machine in case of hardware.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
1 Beam Plans for Accelerator Systems: The Machine Protection System Jan Uythoven On behalf of the MPWG and the MPS Commissioning WG Special thanks to R.Schmidt,
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
LHC 1 st August :34 Dump on TDI.B2 jaw position while filling –Checks and change TDI.B2 reference position by 0.1 mm outwards 09:40 Lost cryo in.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
1 Will We Ever Get The Green Light For Beam Operation? J. Uythoven & R. Filippini For the Reliability Working Group Sub Working Group of the MPWG.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
Schedule IT General Schedule 9 th, September 09 Today.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
Running scenario 2009/10 Run through components – and then synthesis.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Saturday 9 th April 10:24 Finally « 600 » bunches 14:30 Dump the 600 x :00 Loss maps Green light for 800 bunches 18:40 Fill for 800 bunches 20:48.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Injection issues overnight 10:50 Access  QPS & EPC  Vacuum leak SPS – magnet to be replaced Monday – cycling for FT and LHC only over the weekend 12:15.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Saturday 14:10 Cryogenics back [26 hours 40 minutes] Pre-cycle 15:30 Beam 2 in  Interlock on TCLIB.6R2.B1. Alessandro Masi found a broken sensor, it would.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Beam Loss Monitor System Reliability and False Signals
External Review on LHC Machine Protection, B.Dehning
Initial Experience with the Machine Protection System for LHC
Machine Protection Xu Hongliang.
Wednesday 31 October: Morning
BLM changes HV software interlock (SIS)
Will We Ever Get The Green Light For Beam Operation?
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Presentation transcript:

26 Apr 2004RSWG G.Guaglio 1/4 Reliability Sub-Working Group False Dumps generation

26 Apr 2004RSWG G.Guaglio 2/4 LHC main systems Magnet protection Loss Duration <10ms >10s middle False dump generator Resistive magnets Lifetime RF BPM Access Timing Experiments Collimation Vacuum DCCT LBDS BEM BIS Cryogenics QPS BLMS 4-5 first line systems: average < 1E-7/h/4 = 2E-8/h ~20 beam permit systems: average < 1E-6/h/20 = 5E-8/h Power converters ? ?

26 Apr 2004RSWG G.Guaglio 3/4 Annual False Dumps SystemFalse Dumps/yMain causeFalse Dumps/y after actions BLMS?Power supplies~4 BIS LBDS … Work proposal

26 Apr 2004RSWG G.Guaglio 4/4 BLMS UPS situation ‡68 in the straight sections: MTBF 1E5? (3) ‡1080 in the arc: MTBF 1E9 (0.004) ‡24 in surface VME : MTBF 60,000 (2) Possibility to use non LHC standard VME rack configuration to improve the reliability: disable/check fans interlock, parallel configuration,…