Failures encoutered during build and test of Swea sensor instrument MAVEN-Swea sensor pre-shipping review - December 1-2/2011 1.

Slides:



Advertisements
Similar presentations
Interfacing Lab Part Guide. The Solderless Breadboard Rows along the top and bottom are connected horizontally along the length of the board Holes in.
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Electronics Modification: Critical Design Delta Review 2 Tom Montagliano July 27 th,
Adaptive Headlight System Betzayda Rivera Projects II Design Review Tuesday,
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
Introduction to PSpice Simulation Software. The Origins of SPICE In the 1960’s, simulation software begins –CANCER Computer Analysis of Nonlinear Circuits,
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
CXC EPHIN Status and Alternatives Michael Juda. CXC EPHIN StatusPage 2 Outline 1.EPHIN description 2.Thermal issues 3.+27V rail anomaly and impacts 4.Operations.
EE 2303 Week 2 EE 2303 Week 2. Overview Kirchoff’s Current Law (KCL) Kirchoff’s Voltage Law (KVL) Introduction to P-spice.
CERN VIBRATION SENSOR PROPOSAL The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures.
Electronic Component Functions What is this component doing my in electronic device?
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
Write a program that will automatically control the brightness of a light based on the surrounding light level. Automatic Night Light.
Segway Controller Notes. = connection on top layer of circuit board = connection on bottom layer of circuit board Ground Plane: Areas enclosed by the.
ELMB miscellanea Dr Zhige (Gary) Zhang. ELMB miscellanea 1)Over voltage protection for analog input 2)Hardware resetting 3)Allocation for RICH2 4)Configuration.
DC Circuits Muhajir Ab. Rahim School of Mechatronic Engineering Universiti Malaysia Perlis.
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
FIRST Electrical Design FIRST Robotics Championship Conference Steven Shade Team 1111 April 16, 2003.
Design and fabrication of electrical measurement system for microchannel plates (LAPD weekly group meeting) Feb Anil Mane, Qing Peng, Jeffrey Elam.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
SphinX - electronics and software The schematic representation of the instrument’s electronics. Details of the software together with respective Electrical.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Pressure Sensors are always pushed around Click within the blue frame to access the control panel. Only use the control panel (at the bottom of screen)
Grounding Studies Metal box sensor SVX4/hybrid Analog cable GND(20W)
1 Device Simulations & Hardware Developments for CBM STS Sudeep Chatterji CBM Group GSI Helmholtz Centre for Heavy Ion Research CBM Collaboration Meeting,
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
New Product Developments World Leaders in Combustion Management Solutions C.E.M.S., MCERTs & E.P.A. Exhaust Gas Analysers C.E.M.S., MCERTs.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
New Product Developments World Leaders in Combustion Management Solutions C.E.M.S., MCERTs & E.P.A. Exhaust Gas Analysers C.E.M.S., MCERTs.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
SPP FIELDS DFB Quarterly June 16, 2015 Solar Probe Plus FIELDS Instrument Quarterly Q Digital Fields Board (DFB) 1.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
ATTENTION SENIORS WHO NEED SSL HOURS!!! Please Follow These Instructions.
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
Detection Circuit ENGR Pre Lab.
1 LAPPD Team meeting 6/10/2010 Ossy Siegmund, Experimental Astrophysics Group, Space Sciences Laboratory, U. California at Berkeley Integration of Front-End.
Anomalies &/or differences with the configuration Explanations, analyzes, impacts Updates EUSO-BALLOON, Flight review 04/06/2014 Guillaume Prévôt (APC)
1 PST Heaters – Proposed Segmentation Forward = 2289mm. 6 hoops. 10 heaters Barrel = 1606mm. 4 hoops. 7 heaters.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
HV Cable and Snout Conflict: Problem and Possible Fix James Mott g-2 Tracker Meeting 02/25/16.
March 28, 2011 MAVEN SWEA instrument Pre-CDR Peer IRAP March 28-29, IRAP Management MAVEN SWEA Instrument Pre-CDR Peer Review IRAP, March.
1 PFP Team Meeting Particles and Fields Package Weekly Team Meeting, SSL April Dave Curtis, PFP PM.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
SWEA sensor FM model work remaining before delivery
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
Electric Field and Waves Instrument (EFW)
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
GLAST Large Area Telescope
Universal Interface, 12-fold, FM US/U 12.2
HCAL HV splice box.
Introduction to Wiring Logic Gates
Superposition Theorem.
Presentation transcript:

Failures encoutered during build and test of Swea sensor instrument MAVEN-Swea sensor pre-shipping review - December 1-2/2011 1

2  Maven/ SWEA is a remake of Stereo/ SWEA for which 4 models were developped (2 X FM + 2 x EM)  The proposal to CNES for Maven/ SWEA was to build an instrument for MAVEN as close as possible to Stereo one (limited funding and manpower)  A limited number of changes were identified by IRAP and SSL (Stereo to Maven doc) due to: o Different mission profile o Stereo anomalies considering datas o Improve the instrument  These changes induced some anomalies, failures or new concerns  Some failures or anomalies were already present on Stereo

MAVEN-Swea sensor pre-shipping review - December 1-2/ When commanding HV deflectors to zero, the deflectors HV was not zero. The same supply return line was used to command HV deflectors and to supply MCPs high voltage, So when commanding the deflectors to zero there were not zero on deflector HV command but differents positive values depending of differents MCPs high voltage supply currents. (Deflectors HV offsets did not comply to ICD)

MAVEN-Swea sensor pre-shipping review - December 1-2/ Proposition: Connect all interface connector spare wires to analog ground both on sensor side and on electronic box side (SSL) to reduce the changing impedance of analog return line and so reduce deflectors HV command offsets. IRAP to make a calibration of deflectors HV offset vs MCP HV value.

Radiation doses expected more important than for Stereo Make a new thicker electronics boards housing part (2.5mm). (mech. Part #23) MAVEN-Swea sensor pre-shipping review - December 1-2/2011 5

6 Three M2x4 CHC obturator fixation screws suspected to be in detector field of view. Solution: replaced by 3 M2x4 FHC screws as on drawing here. Obturator modified to fit FHC screws.

MAVEN-Swea sensor pre-shipping review - December 1-2/ On Maven project, after SSL simulations, it was decided to raise top deflector by 1mm and drop bottom deflector by 0.3mm to have better deflexion homogeneity. After this operation, it appeared that part #32 was partly in detector field of view. Solution: Slightly modify part #32 (see mechanical parts list & drawing)

MAVEN-Swea sensor pre-shipping review - December 1-2/ Following part stress analysis: Osram SFH421 LED not qualified Tests according to “EEE-INST-002 Instructions for EEE parts selection, screening, qualification and derating.” were made by Hirex with SSL agreement.  LAT tests on samples  Life test (1000 hours)  Radiation tests up to 20KRad at low dose flow (smaller or equal to 360 rad (SI) per hour) Tests results successfuls (See Hirex reports)

MAVEN-Swea sensor pre-shipping review - December 1-2/ Following part stress analyser: Vishay HV resistor had under rated voltage Vishay HTS68 (1GΩ) rated 2KV Vishay HTS523 (1GΩ) rated 5KV

MAVEN-Swea sensor pre-shipping review - December 1-2/ Following part stress analyser: diodes JANTXV1N6642 has peak inverse voltage overstress (100V) Were replaced by JANTXV1N6638 (rated 150V)

MAVEN-Swea sensor pre-shipping review - December 1-2/ END