CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.

Slides:



Advertisements
Similar presentations
2002 LHC Days at Split, Split, October 2002 D J A Cockerill - RAL 1 The ECAL Endcap Calorimeter for CMS D J A Cockerill RAL - UK 2002 LHC Days at Split.
Advertisements

Vacuum Phototriodes for the CMS Electromagnetic Calorimeter Endcap
CMS ECAL Annual Review - CERN Sept 2001 R M Brown - RAL 1 Test results from 500 preproduction VPTs R M Brown RAL - UK CERN 19 September 2001.
ECAL End Cap Schedule issues Justin Greenhalgh This presentation will be at under EE356.
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions,
LHCC Comprehensive Review 26/6/06 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps LHCC Comprehensive Review, June 2006 D Cockerill EE  EE large.
ECAL FB Meeting, D Cockerill (RAL)1 Large EE Mechanics update.
Duct numbering for EE- Wolfgang Funk - CERN CMS 23/09/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
E0’ setup at CERN, , lab 187-R-D06, via bat 70, tel Is there a sock over the umbilical - if so how connected to chassis. and how far does.
RBX PRR - March 1-2, H C A L HCAL RBX PRR Readout Box (RBX) PRR Dan Green HCAL Project Manager.
ECAL Testbeam Meeting, Rome 28 March 2007 Toyoko Orimoto Adolf Bornheim, Chris Rogan, Yong Yang California Institute of Technology Lastest Results from.
ECAL TIMING. 20/04/092 Ratios’ Method Basics Position of pulse maximum parameterized using the ratio of two consecutive samples, i.e., R = A(t)/A(t+1)
B W Kennedy, CCLRC Rutherford Appleton Laboratory VPTs for the CMS experiment B W Kennedy CCLRC Rutherford Appleton Laboratory St Petersburg, 26 April.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
G.Barber - Imperial College London - EE Workshop March EE Dee Assembly Contents:- Area Manipulator Future Plans.
1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,
CMS Week, CERN, 2002 R M Brown - RAL 1 Performance Characteristics of Production VPTs R M Brown, B W Kennedy, P R Hobson (with crucial input from D J A.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
PSD8 September 2008, Glasgow.P R Hobson, Brunel University 1 Avalanche Photodiodes and Vacuum Phototriodes for the Electromagnetic Calorimeter of the CMS.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Rutherford Appleton Laboratory CMS ECAL Split 08/09/04 R M Brown - RAL 1 The Status of the CMS Electromagnetic Calorimeter R M Brown On behalf of the CMS.
CMS SLHC workshop, D.J.A. Cockerill (RAL)1 CMS SLHC Workshop The CMS ECAL Detector at SLHC D Cockerill RAL
Valery Dormenev Institute for Nuclear Problems, Minsk
The CMS Electromagnetic Calorimeter Roger Rusack The University of Minnesota On behalf of the CMS ECAL collaboration.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
CMS ECAL Elba May 2006 R M Brown - RAL 1 The Status of the CMS Electromagnetic Calorimeter R M Brown On behalf of the CMS ECAL Group.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
CMS ECAL Laser Monitoring System Christopher S. Rogan, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
The CMS Electromagnetic Calorimeter at the LHC
B W Kennedy, CCLRC Rutherford Appleton Laboratory Vacuum Phototriodes for the CMS Electromagnetic Calorimeter Endcaps K.W.Bell, R.M.Brown, D.J.A.Cockerill,
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1 P.Rebecchi (CERN) “Monitoring of radiation damage of PbWO 4 crystals under strong Cs 137  irradiation in GIF-ECAL” “Advanced Technology and Particle.
TTF - ECAL Plenary in CMS week ECAL Stability Contacts: Marc Dejardin, Julie Malcles (laser)
The CMS electromagnetic calorimeter
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
SLHC Working Group - Nadia Pastrone1 CMS ECAL Detector at SLHC SLHC high radiation environment  consequences on ECAL Bunch crossing period:
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- THERMAL STEPS ANALYSIS Goals & Means : –apply a “step function” on the cooling water –look at : APD response.
EE EDR Workshop CERN March 2002 R M Brown - RAL 1 The VPT HV System lOverview of the architecture lThe HV filter card lRadiation tolerance lPower supply.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
CMS ELECTROMAGNETIC CALORIMETER Jean-Pierre Ernenwein OVERVIEW 6th international conference on advanced technology and particle physics Villa Olmo, Como,
Calibration of the CMS Electromagnetic Calorimeter with LHC collision data Maria Margherita Obertino on behalf of the CMS Collaboration Introduction The.
HEP2001, Budapest, July 2001 R M Brown - RAL 1 The Vacuum Phototriodes for the CMS Electromagnetic Calorimeter P R Hobson, D C Imrie, O Sharif Brunel University,
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
G. Dissertori ETH Zürich May 1, 2003 LHCS03, CMS ECAL 1 CMS: Electromagnetic calorimetry and e/gamma performance G. Dissertori ETH Zürich LHC Symposium,
2004 LHC DAYS IN SPLIT- October 8 th 2004 L. Dobrzynski - LLR CMS - ECAL Test beam results Ludwik Dobrzynski On behalf of ECAL CMS LLR- Ecole polytechnique.
Sept 2000E. Auffray, P. Lecoq, EP-CMA Results on the 100 R&D EndCap crystals measured in RCCERN on ACCOCE2 E. Auffray, P. Lecoq CERN EP-CMA.
Overview Detector details Crystals Photo-detectors
CMS-ECAL Front-End monitoring Matteo Marone
The Status of the CMS Electromagnetic Calorimeter
CMS ECAL Calibration and Test Beam Results
Quick link: cern.ch/cmstb04
4x5 SC array for the test beam in Apr 2007
Studies of the effect of the LHC cycle on
UK CMS Oversight Committee Mtg
Endcap Crystal Properties
Type 2 Supercrystal Type 1 Supercrystal
Duct numbering for EE- 09/06/2008 Wolfgang Funk - CERN CMS 1 06.B 07.B
PROGRESS on EE VPTs, Dees D Cockerill
Data NIMA 545 Table 3 and Fig.18 NIMA 564 Fig 3 (top)
ELECTROMAGNETIC CALORIMETER
Presentation transcript:

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using VPT and crystal lab data - Detailed scan across 4 SCs: SC across to SC, across 4 SC meeting point - Comparison to Monte Carlo, constant term versus FNUF: lead shading of chamfers - Quantify level of white/coherent noise for 50cm read out lines - Laser monitoring - laser light in rear of xtal, signal with VPT instead of APD - Measure R for endcap crystals/endcap monitoring, especially ‘soft’ 2001 crystals - Data analysis - Complementary work to that of existing teams looking at barrel data E0’ test beam targets in 2003

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (2) E0’ Up to 4 Standard SCs Dee services and electronic integration issues Umbilical noise, optimal cable layout studies

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (3) E0’ SC01 being prepared for E0’Mounting SC01 to E0’ Fibres Umbilical

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (4) E0’ stages of build Backplate cooling NOTE OFFSET SLOTS in X Interim cooling plane Power cooling plane HV 8 cm moderator LV F.O bundle Umbilical

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (5) E0’ complete Accurate cross section through Dee All service planes incorporated 50 channel analogue readout box currently incorporated Noise studies to end 2002 SC01 SC02

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (6) E0’ Thermal screen

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (7) E0’ – current positional spacers 6,45,4 5,5 6,5 Spacer numbering Column, Row

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (8) E0’ – current positional spacers IP, beam Establish angles to beam needed for positioning plate on H4 turntable Angle (y-z plane) At top of array11.5 o At centre of array ~ tan -1 (60cm/320cm) 10.6 o At bottom of array 9.7 o

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (9) E0’ Supercrystals SC01 and SC02 not suited for test beam: high FNUFs, La doping (SC01), etc. Require 4 new SCs, 100 crystals Propose to use existing EE crystals with ACCOS FNUF ~<0.55% correction factor, ACCOS to Alveolar ~ correction factor, lead shading of chamfers, ~ -0.1 should achieve all FNUFs ~< IC (D Britton) prepared to shade chamfer of higher FNUF crystals Measure FNUF before/after operation. Try to make SCs from same batch, all year 2000, or all year 2001 (rad soft) Will need crystals from next order of 100 EE crystals

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (10) E0’ crystals. Current EE Crystal Stock, FNUF < 0.57 TotalKnown whereabouts 100 R&D Year (5 in SC02) 22RAL 4 CERN Total available: 26 => 1 SC 100 Pre-production, (77 including bad RNUF/gradTT) (18 Ren Yuan) 15 Roma 3 ETH 13 UK 20 CERN, Bldg 27 Total available: 51 => 2 SCs Enough for 3 of 4 SCs

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (11) EE crystal inventory SC02 R&D EE crystals, year 2000, ACCOS, no FNUF corrections

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (12) EE crystal inventory Pre-production crystals, 2001, ACCOS, no FNUF corrections

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (13) E0’ lab setting up/readout issues Location: 867 or Meyrin site ? Light – to –light : how many ULR crates/stations ? Lasers : more than one or share with EB activities? MEM boxes : share ? Use single VPT test box/Stephenson preamp => camac to monitor laser into E0’? Status for charge injection ? Electron calibration in lab ?

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (14) E0’ Proposal: 1)Approve sending pre-production crystals to UK, FNUF<0.57 2)Approve crystals for E0’ from order for 100 production crystals due to be launched shortly 3)Shipment of E0’ from RAL to 867 or Meyrin in Feb )Fitting E0’ with ‘most useful/available’ light to light electronics, March – May, 2003

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (15) Appendix

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (16) FNUFs SC01 (La), SC02 FNUF > <FNUF<1.0 FNUF<0.5 SC La xtals SC02 from 100 R&D xtals in 2000 SC01 and SC02 intended for noise studies, not test beam

CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (17) SC01 FNUF values 27 La crystals, 1998 SC01