Up and Over Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

MPV project. WHY BUILD AN MPV? Goals of the MPV project 1.To follow directions successfully and build a mousetrap-powered vehicle that moves at least.
Step-by-step assembly instructions
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Click on this image to open the full PDF document.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Step-by-step assembly instructions
Typical Walk-in Closet with elfa® décor
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Pneumatic Arm Assembly Instructions
Classroom Activity – Fluid Power Introduction to the History of Fluid Power Compressibility of Fluids Pascal’s Law Relationship of Force, Pressure & Area.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Making A Motor Exploring the Magic of Electricity.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Fluid Power Challenge: Workshop Day
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
Pneumatic Clamp Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Fluid Power Challenge: Workshop Day PRESENTERS:. Fluid Power Workshop Day INSERT DATE HERE Fluid Power Challenge Day INSERT DATE HERE Discovering Fluid.
Rotating Base Model Assembly Instructions copyright Mechanical Kits Ltd
How to Make PVC Pan Pipes
Step-by-step assembly instructions
Agriscience Toolbox Plan of Procedure 1. Table Saw (equipment) Rip the bottom of the toolbox to a width of 10 inches.
Scratch Build a Water Tower
This is a fold-down clothes bar that will hold up to 12 plastic clothes hangers or even more wire hangers. As I don’t have a trailer wall to put it on,
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Investigating Fluid Power Rig Operating instructions (c) 2012 Mechanical Kits Ltd.
A Review of the Basics n OraSure ® device n Collection procedures.
Wheels and Axles Model Assembly Instructions copyright Mechanical Kits Ltd
Levers & Fluids Rig Step-by-step assembly instructions (c) 2012 Mechanical Kits Ltd.
Wheels and Axles Model Assembly Instructions copyright Mechanical Kits Ltd
Adding to your Diagnostic Station Adding thermometry The temperature module attaches to the top of the BP module. It is made up of the following two.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Foldable Tie Book Instructions. Materials Needed 2 pieces of scrap paper Glue stick Paper Hole Punch Tool 1 piece of yarn cut to one arm’s length.
Build A Motor You must follow the directions step-by-step!
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Lesson Plan in Fluid Power
Fluid Power Challenge: Workshop Day
Catapult.
Investigating Fluid Power Rig
Hand-cranked Windmill Assembly Instructions
Air is Matter It takes up space and it has weight
Workshop Rotating Platform
Workshop Rotating Platform
Step-by-step assembly instructions
Workshop Rotating Platform
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Step-by-step assembly instructions
Workshop Rotating Platform
Step-by-step assembly instructions
Step-by-step assembly instructions
Exploring the Magic of Electricity
Ballista Project 2 120mm Axle hole 3 Nails 1 200mm
Step-by-Step Assembly Instructions – Cube Version
Constructing Your Bridge
Step-by-step assembly instructions
Step-by-step assembly instructions
Building a Tissue Paper Hot Air Balloon
Presentation transcript:

Up and Over Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1

Contents of Up and Over Kit Wooden pieces (⅜” cross-section): 4 X 20 cm (7.87”); 2 X 11cm (4.33”); 3 X 12cm (4.72”); 2 X 6cm (2.36”); 2 X forks 1 X 3²cm Block (1.81²”) Syringes, 20cc: 2 (1 has a hole in the plunger) Plastic Tubing: 1 length Wooden dowel, 3/16” diam.: 2 X 10.5cm (4.13”); 1 X 8cm (3.15”); 1 X 6.5cm (2.56”); 2 X 4cm (1.57”); 2 X 3.5cm (1.38”); 2 X 2cm (0.79”) Syringe Holder: 1 Mini-washers: 10 Plus a small piece of sandpaper (c) 2013 Mechanical Kits Ltd.2

3

Lay 3 X 12cm (4.72”) arms (with 3 holes) on the working surface. Connect 2 X 20cm (7.87”) pieces (with 4 holes) to them using the smallest lengths of dowel. Use 2 X 4cm (1.57”) dowel in the holes shown at the top of the picture below. Use 2 X 3.5cm ( 1.38”) in the “top-middle” holes to connect the 6cm (2.36”) pieces and 2 X 2cm (0.79”) in the bottom holes – to flush. The holes in the side of the 6cm pieces face across the width. (c) 2013 Mechanical Kits Ltd.4

Use the 8cm (3.15”) dowel to connect the two forks to the other two 20cm (7.87”) pieces. Use the holes at the “top end” (as before). The forks are placed at 45° to the long pieces and can be secured using a tiny amount of wood glue on the dowel. (c) 2013 Mechanical Kits Ltd.5

Insert a 10.5cm (4.13”) dowel through the 3cm block and secure with two mini-washers, as shown. A piece of cardboard could be glued to the underside of the block for extra strength if desired. Strip off the plastic from the syringe holder and press firmly onto the 3cm block. (c) 2013 Mechanical Kits Ltd.6

Slide to dowel holding the 3cm block and the syringe holder through the side holes of the 6cm (2.36”) upright, as shown below. Use two mini-washers to secure the dowel on the outside of the 6cm piece. (c) 2013 Mechanical Kits Ltd.7

Push the 6.5cm (2.56”) dowel through the hole in the plunger of one of the syringes and then through the “top-middle” holes of the long pieces with the fork attached, as shown below). Use two mini-washers to secure. (c) 2013 Mechanical Kits Ltd.8

Connect the 11cm (4.33”) pieces or holders to the protruding 4.5cm dowel. Use the other 10.5cm dowel to attached the fork arm to the “top” holes of the 11cm pieces and four mini-washers, as shown below (c) 2013 Mechanical Kits Ltd.9

Swing the arm over and push the syringe into its holder. The device will look like the picture below - (c) 2013 Mechanical Kits Ltd.10

Push the plunger all the way into the syringe and position the syringe in the holder as shown below. Connect the tubing to the syringe. Extend the plunger of the other syringe and connect it to the other end of the tubing. Air and water can be used in the syringes to compare pneumatic and hydraulic operation. Use a very small drop of washing-up liquid with the water as a lubricant. The position of the 6.5cm dowel can also be changed to create a different levered motion. (c) 2013 Mechanical Kits Ltd.11