The Optimum Kiln System

Slides:



Advertisements
Similar presentations
VORTEX FINDERS (DIP TUBES, IMMERSION TUBES)
Advertisements

Welcome.
Power Plant Engineering
The Cement Experience More than 50 years of expertise.
Dave Stropky, VP Research Process Simulations Ltd East Mall, Vancouver, BC, Canada Industrial Process Modeling.
Triple Effect of Reject to Power on Joburg’s Waste Vision
Reference Concrete Sidney Mindess J. Francis Young Prentice-Hall, Inc Chapters 3 and 4.
POZZOLANS (Supplementary Cementitious Materials)
ECDP332 Concrete Technology Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lect. 2 2 nd Semester 2008/2009 UP Copyrights.
PC Cement Hydration PCC consists of binder and aggregates. Aggregates are typically used in two factions: fines and coarse. The binder phase normally.
Design Steps : Furnace Of A Steam Generator P M V Subbarao Professor Mechanical Engineering Department Selection of Geometric Parameters….
A TEC’s Mjolnir mill: The future of alternative fuels preparation & burning By Pedro Montes de Oca and Jonathan Forinton.
Modeling Lime Kilns in Pulp and Paper Mills Process Simulations Ltd. #206, 2386 East Mall, Vancouver, BC, Canada August 23, 2006.
Watertube Boiler.
Progress in Ca-based CO 2 capture research at Cranfield University Ondřej Mašek, Adina Bosoaga, John Oakey.
5 critical areas in Cement plants
LIME. Lime Naturally occurs as: Limestone Lime Chemistry for pure rock: CaCO 3 (calcium carbonate) but, impurities are always present: MgCO 3,Al 2 O.
European Commission Enterprise and Industry GReening business through the Enterprise Europe Network Linking energy efficiency with environmental protection.
Previous MACT Sub Categories EPA has recognized differences in other industry rules by using sub-categorization: – Differences in processes – Differences.
Bereichskennung oder Produktname Process Instrumentation and Analytics Januar, 2003 Folie 1 A&D PI2 SE1 Siemens Process Analytics in the Cement Industry.
An Introduction To Chemical Soil Stabilization Presented by: Marco Silvestre, P.EGary Dukewits.
CEMENT INDUSTRY GRUPO 5 PILAR DELICADO HERRERAS REBECA DIEZ MORALES
Boiler Circulation Natural Circulation
Steam Power Plant.
Dave Stropky, VP Research Process Simulations Ltd East Mall, Vancouver, BC, Canada Industrial Process Modeling.
Coal Burning System.
Fluidized Bed Solids Management: How Knowledge of Fundamentals can Help Optimize Plant Operations.
Aero Engines 9.02 Oil & Fuel References: FTGU pages
KING SAUD UNIVERSITY COLLEGE OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Students Names: Abdulrahman Albedah Ali Al-theeb CE-477 Supplementary.
Mechanisms of Fuel Combustion P M V Subbarao Professor Mechanical Engineering Department A Basis for Development of Compact SG Systems……
Estimation and Selection of Air for a Fuel P M V Subbarao Professor Mechanical Engineering Department A Criteria for Sizing of Furnace & Furnace Accessories.
PRESENTED BY: S.Neelakandan, R.S.Karthikeyan, P.Ashok, GUIDED BY: V.S.Venkatesan, Prof. S.Vijayaraj Final Year Mechanical, (HOD/MECH) A.V.C College of.
WHAT IS CEMENT???  A cement is a binder, a substance that sets and hardens independently, and can bind other materials togetherbinder  It was 1 st introduced.
 Spray drying - formation of droplets from the bulk liquid – moisture removal  liquid droplets - sprayed –drying chamber  the low-humidity hot gas.
Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant.
Ruth Allington 1 How to make cement-raw material requirements RUTH ALLINGTON.
Physical Conversion of Biomass
Thermal Power Station.
OVERVIEW OF PMSB INCINERATOR PLANT 1.Primary Chamber 3.Secondary Chamber 4.Heat Exchanger 5.Cooling Tower 7.Rotary Contactor 8.Fabric Filter 9.ID Fan 10.Stack.
1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.
Advanced Process Modeling Improves Efficiency Process Simulations Ltd East Mall, Vancouver, BC, V6T 1Z3 Dave Stropky and Jerry.
Presentation of HASLE Refractories A/S Ceramic Diptube Case Story at a plant in Thailand
Thermo-chemical Conversion Technologies The Basics
PORTLAND CEMENT.
An evaluation and suggestion for a sustainable concrete industry
CVL 2407 Faculty of Applied Engineering and Urban Planning Civil Engineering Department 2 nd Semester 2013/2014 Dr. Eng. Mustafa Maher Al-tayeb.
Advantages of Rotating Machines Less balancing problems Low lubricating oil consumption Higher reliability.
What is PET-COKE *Petroleum coke is a by-product / undesirable product of oil refining cracking process. *The most attractive thing for use of Pet-coke.
Energy Balance across pulverizer is very critical for satisfactory
REDUCTION OF NOx & SOx EMISSION WITH ALTERNATIVE FUEL UTILIZATION IN CEMENT INDUSTRY SOx NOx.
Lesson 7 Steam Power Plant.
POZZOLANS (Supplementary Cementitious Materials)
How long will your concrete bridge last?
LIME.
Government Engineering College Valsad
Prof. Mayur M. Maske HoD Civil Engineering(Diploma) RIT, Rajaramnagar
Portland Cement- Manufacturing process
LIME.
Subject: Properties of Cement Prepared by Dr. Salah Al-Dulaijan
How long will your concrete bridge last?
Ch. 10 Heat Transfer in Engines
Power Plant Engineering. Boilers Boilers Boiler is an apparatus to produce steam. Thermal energy released by combustion of fuel is used to make steam.
Cement: Cement is the mixture of calcareous, siliceous, argillaceous and other substances. Cement is used as a binding material in mortar, concrete,
The Blast Furnace.
Processing Coal Ash into Products: A Pre-Combustion Perspective
OPTIMIZATION OF EXCESS AIR IN COAL FURNACE
Copyright Materials This educational activity is protected by U.S. and International copyright laws. Reproduction, distribution, display, and use of.
OPTIMIZATION OF EXCESS AIR IN COAL FURNACE
Presentation transcript:

The Optimum Kiln System 1) 5 stage preheater with low pressure drop cyclones 5) Oversized kiln for AFR 2) Large in-line calciner with AFR feeder 6) High momentum multi channel burner 3) Low NOx with staged TA swirl chamber 7) High efficiency cooler 8) Roller crusher 4) Hot spot (e.g. chamber) staged meal feed 10) Splined tyre fixation 9) Pneumatic seals at both ends

Pre-Calciner: Typical Problems 1) CO at outlet of PC or cyclone 5) Material build-ups 6) Refractory damage 2) Locally too high temp. 7) Tertiary air damper failure 3) Unburnt fuel particles in hot meal 8) Tertiary air duct blockage (elbow type only) 4) Too high / low calcination degree

Main Benefits of Precalciner Technology 1. More stable kiln operation due to better kiln control via two separate fuel feed/control points 2. More stable kiln operation due to controlled meal conditions at kiln inlet 3. Reduced thermal load of burning zone 4. Lower refractory consumption as a result of 1. to 3. 5. More than double capacities possible with given kiln (10'000 t/d: 6 x 95m) 6. Possibility of increasing capacity of existing kilns 7. Reduced volatilisation of circulating elements 8. Reduction of cycles (S, Cl, Na2O, K2O) with lower bypass rate / losses 9. Makes short kilns possible with 2 stations, L/D < 12 10. Possibilities of NOx reduction 11. Lump fuel (AFR) utilization (in-line only)

True and Apparent Calcination Degree True calcination degree: Degree to which the calcination is completed, i.e. extent to which the CO2 is dissociated from the CaCO3. Extremes: Raw meal 0% (LOI=35%) Clinker 100% (LOI= 0%) Apparent calcination degree: The calcination degree determined from a hot meal sample taken from the meal duct of the bottom cyclone

Dimensioning Criteria for Precalciners 1. Gas Retention Time (for combustion in pure air) decisive for complete combustion Fuel Reactivity Gas Retention Time low > 3.5 sec medium > 2.5 high > 2.0 2. Meal Retention Time decisive for complete calcination Actual meal retention times are 6 to 12 seconds, at the above gas retention times. Calcination takes much less than that which means that meal retention time is not a decisive design criteria. Fuel Reactivity Examples: Low: Petrol coke Medium: Bituminous coal, natural gas High: Lignite, fuel oil Inline Calciners: Due to less favourable conditions for combustion (presence of kiln gas, imperfect mixing of tertiary air with kiln gas), the following rule of thumb can be used for sizing this PC type: Recommended gas retention time + 0.5 to 1 sec

Cyclone Preheater: Typical Problems 1) Dip tube missing or damaged 5) Too high velocity 6) Meal flaps not working 2) False air 7) Thermocouple bad location 3) Meal deposit 8) Splash plate worn; splash box not clean 4) Cyclone blockage

Counter-Current Heat Exchange

Co-Current Heat Exchange

Energy Turnover in a Grate Cooler

Cooler Efficiency h cooler Q combustion air S Q loss h cooler = = 1 - Q clinker from kiln S Q clinker from kiln

Tube Cooler

Problems of Conventional Grate Coolers Uneven clinker distribution “Red River” Air breaking through (“Geyser”) Overheated / burnt plates Thin clinker bed Poor UG-compartment sealing -> Poor recuperation (low hth)

Benefits of Modern Cooler Technology Smoother cooler operation More stable kiln operation Good recuperation (high hth) Control of “Red River” Less or no clinker fall through Smaller waste air system Less space required (Lower power consumption)

Fixed Grate Coolers SF Crossbar Cooler (FLS Fuller) Main Features First radically different grate cooler! Fixed line; no moving rows Mechanical flow regulators; 1 per plate Crossbars for clinker conveying Standard modules; pre-installed Different speeds across width possible Size < 45 t/d m2 Air installed: ~2.0 Nm3/kg

Influence on clinker composition Influence on burning process Influence of Ratio on burning Process and Chemical Composition Influence on clinker composition Influence on burning process Up and down Ratio C3A C4AF C3A C4AF C3S C2S Free lime will increase C3S C2S Difficult to burnا Lower Clinkering Temperature Lower clinker Clinker reaction accelerated Difficult to burn Easy to burn high Low High 1-Silica ratio SiO2 = Al2O3+ Fe2O3 2-Alumina ratio = Al2O3 Fe2O3 3-Lime saturation factor = CaO 2.8SiO2 +1.18Al2O3+0.65Fe2O3 Or 2.8 SiO2+0.65Al2O3+.35Fe2O

5 Stages of Hydration Reaction Stage Kinetics of Reaction 4/26/2017 6:53 AM 5 Stages of Hydration Reaction Stage Kinetics of Reaction Chemical Process 1. Initial hydrolysis Chemical Control : Rapid Dissolution of Ions 2. Induction Period Nucleation control : low Continued dissolution of ions 3. Acceleration Initial formation of hydration products 4. Deceleration Chemical and diffusion control : Slow Continued formation of hydration products 5. Steady State Diffusion control : Slow Slow formation of hydration products © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

4/26/2017 6:53 AM Stage 5: Densification/ Steady Stage (can continue for years) Start of belite reactions and they can continue for years. Belite reactions also produce C-S-H and CH, forming a solid mass. Longer length of this stage gives: •Greater concrete’s strength •Lower permeability •Greater durability To promote continued hydration, moisture must be retained in the slab as long as possible © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

4/26/2017 6:53 AM Factors Affecting Hydration Major factors :- • Chemical Composition of Cement • Cement Type • Sulfate Content • Fineness • Water/Cement Ratio • Curing Temperature • Effects of SCMs and Admixtures © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

4/26/2017 6:53 AM Mechanism of Heat generation Reaction of calcium Silicates : 2 C3S + 7H  C3S2H8 + 3CH H= -500 J/g 2 C2S + 7H  C3S2H8 + CH H= -250 J/g Reaction of tri calcium aluminate C3A + 3 CSH2 + 26 H  C6AS3H32 H = -1350 J/g © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.