CIEMAT contribution to PETS David Carrillo CTF3 Collaboration Meeting January 2007.

Slides:



Advertisements
Similar presentations
CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
Advertisements

CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Jiaru Shi(Department of Engineering Physics, Tsinghua University) Hao Zha (CERN) CLIC Workshop 2014 CLIC choke mode structure and X-band activities.
Choke-mode damped accelerating structures for CLIC main linac Hao Zha, Tsinghua University Jiaru Shi, CERN
RF aspects of module vacuum system Riccardo Zennaro CERN.
S TEERING ALGORITHM EXPERIENCE AT CTF3 Davide Gamba 14 November 2013 The International Workshop on Future Linear Colliders LCWS13.
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
Recent 30 GHz CTF2 M. Gerbaux, S. Döbert, Jan Kovermann, R. Zennaro.
Different mechanisms and scenarios for the local RF
2 nd collaboration meeting on X-band Accelerator Structure Design and Test-Program Structure fabrication Comparative analysis of disk and quadrant manufacture.
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
First TBL PETS prototype tank development D. Carrillo, E. Rodríguez, F. Toral, CIEMAT N. Chritin, S. Doebert, I. Syratchev, CERN CERN, 24/01/2008 Courtesy.
R&D ON STRIPLINES FOR THE CLIC DR KICKERS C. Belver-Aguilar (IFIC) Acknowledgements: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M. Barnes (CERN) ICFA Beam.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
An Overview of the CLIC Testing Program W. Wuensch CLIC ACE
10/2007 M.Taborelli, TS-MME Structure Manufacturing, Achievements and Challenges M.Taborelli -Technology -Shape accuracy -Surface quality -Assembly accuracy.
2.1GHz cavity without cell-to-cell coupling slots – 1.875” beam pipe Binping Xiao Aug
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
2nd CLIC Advisory Committee (CLIC-ACE), CERN January 2008 Introduction to the CLIC Power Extraction and Transfer Structure (PETS) Design. I. Syratchev.
Long Multiplication Neale Evison © Long Multiplication Firstly write the sum correctly: 24 x34 That means units over units and tens over tens. This.
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
5/7/2007 TS_CLIC_AB M.Taborelli, TS-MME High precision machining and metrology for structures: achievements and open questions M.Taborelli.
10/2007 M.Taborelli, TS-MME M.Taborelli Structure fabrication: dimensional tolerances Contributions of : G.Arnau-Izquierdo, A.Cherif, D.Glaude, R.Leuxe,
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill.
Bellerophon on Pegasus S. Atieh RF structure development meeting.
TBTS Test Program & Schedule G. Riddone
Introdcution to Workpackage/Activity Reflection D. Schulte.
CLIC accelerating structures: study of the tolerances and short range wakefield considerations R. Zennaro CERN.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
CTF3 MEETING AT CERN 17/July/ PRESENT STATUS OF THE CIEMAT CONTRIBUTION TO CTF3 Luis García-Tabarés, on behalf of the Accelerators Group at CIEMAT.
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
1 Design and objectives of test accelerating structures Riccardo Zennaro.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
WFM electronics Alexandra Andersson. F. Peauger – CTF3 committee – 11/02/10  Wakefield Monitors implemented in two accelerating structures TD24 (tank.
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
Machining compensation experiment – progress report J.Huopana
Work on PETS Developed at CIEMAT. L. Sánchez ICWS September Work on PETS Developed at CIEMAT Laura Sánchez on behalf of Accelerator Technology.
Results of short module and qualification strategy
Status of CIEMAT work on PETS
Test Accelerating Structures Designs, Objectives and Critical Issues
LCWS11 WG4 Fully featured accelerating structure engineering design
An Overview of the CLIC RF Structure Development Program ~
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
Progress on coatings and grooves
Steering algorithm experience at CTF3
RF Power Generation and PETS Design
CTF3 kicker activities at CIEMAT
Review of rf structure test results
Tolerances: Origins, Requirements, Status and Feasibility
Update of CLIC accelerating structure design
CLIC Drive Beam Stabilisation
A.Lounine, T.Higo H60VG3K1 Couplers Design. MDK-2001 CERN Switzerland.
Quadrant Fabrication Study
SPS-DQW HOM Measurements
CLIC Power Extraction and Transfer structure (PETS)
J. García, F. Toral (CIEMAT) P. Fessia (CERN)
Kicker and RF systems for Damping Rings
Presentation transcript:

CIEMAT contribution to PETS David Carrillo CTF3 Collaboration Meeting January 2007

PETS: 30 GHz design PETS Matching Section Wakefields EXTRACTOR Reflection and transmission 72º phase advance per cell 15 mm aperture PETS Damping of dangerous modes Number of cells not to scale Reflection of decelerating mode

400 mm long PETS 2 octants of PETS were ordered to two Spanish firms, only one was successful. Critical zones: undulated profile and fillet radius EDM used to create sinusoidal profile Profile shifted but good (shift produced by a first milling process of the flat surfaces in a non controlled-temperature environment) Roughness 0.8um > specifications (0.2um) by courtesy of Mauro Taborelli. CERN

400 mm long PETS Milling was used for fillet radius, but it wasn’t well done on the valleys: there were problems with positioning and with CAD/CAM machine system Pictures by courtesy of Mauro Taborelli. CERN

Next pieces One piece of 40 mm long has been made by a different company. Completely produced by milling. This piece is being measured at CERN at the moment. Preliminary results show inaccuracy on the top and the bottom of valleys. Company used a conventional milling machine with a multiplier (error due to vibrations). Same piece has been ordered to the company which produced the best 400mm PETS. For this piece, high speed milling machine will be used (14000rpm) By courtesy J. Gomez, Vacuum Projects

CONCLUSIONS A 30 GHz PETS design was realized Structure optimized for decelerating mode Good extraction of power Damping of dangerous modes Two 400 mm octants were machined with EDM + milling Roughness specification of 0.2um was not achieved (0.8um) Profile of undulation was accurate One 40 mm octant was machined with conventional milling One 40 mm octant will be machined with high speed milling We are confident in achieving accurate profile and roughness If so, an octant of 400 mm will be the next step Latest news (12GHz) Tolerances now are relaxed, so the profile of the new design it seems easier to machine… but it must be studied.