Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/2009 - LG1.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
STAR Pixel Detector Latch-up in Phase-1, SUZE and Mimosa22 Tests and analysis by Michal Szelezniak.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR PXL Sensors Overview.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
SVT TDR meeting – March 30, 2012 List of peripheral blocks for SVT strip readout chips.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
MEDIPIX3 TESTING STATUS R. Ballabriga and X. Llopart.
MDT-ASD PRR 28 Aug ’02 J.Oliver Quality Assurance, Production Testing, Database Chip certification, required tests Expected yield QA – Test plan  Production.
L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
A modern NM registration system capable of sending data to the NMDB Helen Mavromichalaki - Christos Sarlanis NKUA TEAM National & Kapodistrian University.
Leo Greiner schedule Evolution of Tasks and Schedule.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
Ultimate Design Review G. Bertolone, C. Colledani, A. Dorokhov, W. Dulinski, G. Dozière, A. Himmi, Ch. Hu-Guo, F. Morel, H. Pham, I. Valin, J. Wang, G.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Michal Szelezniak – LBL-IPHC meeting – 3-5 October 2007 MimoStar2 Current test results at LBL Update on recent tests of MimoStar2 sensors performed at.
L. Greiner1IPHC-LBNL Phone Conference 05/2011 STAR IPHC-LBNL Phone Conference News and PXL sensor (Ultimate) testing at LBNL.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
Phase-1 Design. i PHC Phase /04/2008 System Overview Clock, JTAG, sync marker and power supply connections Digital output.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
TPAC1.1 Progress JC: Dec 8 th. Laser No further investigation of odd scans on V1.1 De-ionizing filter needs replacing – On order… Bulb needs replacing.
Specifications & motivation 2  Lowering integration time would significantly reduce background  Lowering power would significantly reduce material budget.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
CEA DSM Irfu 20 th october 2008 EuDet Annual Meeting Marie GELIN on behalf of IRFU – Saclay and IPHC - Strasbourg Zero Suppressed Digital Chip sensor for.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
DESIGN CONSIDERATIONS FOR CLICPIX2 AND STATUS REPORT ON THE TSV PROJECT Pierpaolo Valerio 1.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
J. Crooks STFC Rutherford Appleton Laboratory
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Test of the MAPS add-on board S. Amar-Youcef, M. Deveaux, D. Doering, C. Müntz, S. Seddiki, P. Scharrer, Ch. Schrader, J. Stroth, T. Tischler.
ClicPix ideas and a first specification draft P. Valerio.
Thanushan Kugathasan, CERN Plans on ALPIDE development 02/12/2014, CERN.
Source Controller software Ianos Schmidt The University of Iowa.
Improvement of ULTIMATE IPHC-LBNL September 2011 meeting, Strasbourg Outline  Summary of Ultimate test status  Improvement weak points in design.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
CMS Pixels: Fermilab Farah Fahim, Gregory Deptuch, Jim Hoff, Alpana Shenai, Marcel Trimpl.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
MIMO  3 Preliminary Test Results. MIMOSTAR 2 16/05/2007 MimoStar3 Status Evaluation of MimoStar2 chip  Test in Laboratory.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
Observations with AMBER  General overview  P2VM  OB preparation with P2PP P2PP / OB / templates Available templates for observation procedure Typical.
M. TWEPP071 MAPS read-out electronics for Vertex Detectors (ILC) A low power and low signal 4 bit 50 MS/s double sampling pipelined ADC M.
RD53 1.  Full/large demonstrator chip submission ◦ When: 2016 A.Early 2016: If chip must have been fully demonstrated in test beams for TDRs to be made.
Test beam preparations Florian Lütticke, Mikhail Lemarenko, Carlos Marinas University of Bonn (Prof. Norbert Wermes) DEPFET workshop Ringberg (June 12-15,
Fast Full Scale Sensors Development IPHC - IRFU collaboration MIMOSA-26, EUDET beam telescope Ultimate, STAR PIXEL detector Journées VLSI 2010 Isabelle.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
Pixel Sensors for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Setup for automated measurements (parametrization) of ASD2 chip
LHC1 & COOP September 1995 Report
Digital readout architecture for Velopix
Σ-D Analog to Digital Converter for CMOS Image Sensors Nonu Singh (RIT, MicroE Co-Op) Background After fabricating an imaging sensor it needs to be characterized.
Test Beam Measurements october – november, 2016
Combiner functionalities
Presentation transcript:

Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1

Sensor Testing and Validation Plans We had developed testing plans before the receipt of Phase-1 sensors. timate_sensor_testing.pdf timate_sensor_testing.pdf ction_testing_revised.pdf ction_testing_revised.pdf After receiving and testing Phase-1, we have updated our testing plans to reflect what we have learned. IPHC_HFT 06/15/ LG2

Outline Phase-1 – Individual testing is shown in the Phase-1 testing talk. – Production testing Probe testing plans and status Ultimate – Proposed built in testing functionality. – Using this functionality for individual and production testing. – Testing issues to address. IPHC_HFT 06/15/ LG3

Testing Model Two types of testing to be employed Characterization – Individual testing designed to test and characterize all aspects of the sensor function with an emphasis on understanding in detail the characteristics of each functional block of the sensor and how the functional blocks work as a whole. This type of testing is used to evaluate the design and implementation of that design in silicon. Production testing – Large scale testing of all sensors to be used in the detectors. In our case we intend to test fully sensor interface and functionality. We further intend to test as much as is reasonable to determine whether the sensor meets the required performance specification. The tests that are required to fulfill this are to be discussed. IPHC_HFT 06/15/ LG4

5 Phase-1 testing Production testing Plan as originally proposed We will probably be able to perform only a subset of the tests that we will employ for the individual testing of this sensor. The tests will need to be scripted and the sensors binned. Power on tests – 1.Current draw for digital and analog voltage supplies at power up and during clocked operation. 2.JTAG testing – test communication with the sensor JTAG system, program and read back registers. Digital function tests - 1.Proper operation for clock, SPEAK, START. 2.Proper operation of the markers. 3.Proper operation of the test modes including programmed output pattern mode. Power / clock range test – 1.Test sensor function with power supply voltage 5% below nominal 2.Test sensor function with RDO frequency 5% above nominal. Sensor functional tests – 1.Test discriminator threshold response on noise. Raise threshold from below noise to above in 3 steps. Check response on digital outputs. 2.Set the threshold at an appropriate (~5 x noise?) level. Test pixel response to flashed LED.

IPHC_HFT 06/15/ LG6 Individual sensor characterization allows us to find operating points that give comparator transfer functions with optimized widths and offsets. We will scan the bias effects on the transfer function in the set of sensors that we are characterizing to determine the spread of optimized bias settings. If these settings cluster appropriately, we can set the biases globally. Individual sensor thresholds can be set based on the measured IVDREF1 response. We will be using Phase-1 sensors in the prototype detector that we intend to deploy in STAR. We will need to modify the previous testing plan based on what we have learned during Phase-1 testing to allow for the selection and necessary characterization of the sensors. We will need to production test ~ 250 Phase-1 sensors (assuming 50% yield, 1 three sector prototype). Phase-1 testing

IPHC_HFT 06/15/ LG7 1.Power on testing – measure the current draw for digital and analog voltages. Reject sensors that are not within tolerance. 2.Test JTAG function to configure the sensor to return the chip ID and to set and read back the nominal operating condition parameters and test the operation of LINEPATn_REG. 3.Measure the DAC setting versus voltage output for the IKIMO, IVDREF1 and IVDREF2 DAC structures. Set biases as per observation of bias response. 4.Use a flashed LED to find any dead pixels and test general pixel function. The testing and characterization to be done to the smaller sample (2 functioning sensors per wafer) of sensors will consist of the previous list of production testing as well as the following additional characterization. 1.Measure noise at the analog outputs and compare to the hit rate as a function of software discriminator level. 2.Measure discriminator transfer functions and compare to previous references. 3.Use a 55 Fe source to generate a spectrum from the analog outputs. Compare this spectrum to the reference. Phase-1 Testing Current Production Testing Plan

IPHC_HFT 06/15/ LG8 We have not yet completely optimized our testing system for speed. The times here are shown as indicators for the current scripted automated testing. JTAG accesses takes 120 ms via USB. Characterization testing consists of: 3600 runs take 5200 seconds (87 minutes) for transfer functions at different biases  24 scans (bias points), each with 150 acquisitions of 10 frames each.  Start takes ~70 ms Fe source Calibration takes ~6 min (2 for noise, 4 for Fe source) Current testing speed Phase-1 testing

IPHC_HFT 06/15/ LG9 Probe Testing Architecture (schematic) Sensor thickness = 50 um Probe pins = 68 Pad size = 85 um x 130 um Die size = um x um Scripted testing system based on the existing RDO system. Same hardware (except for probe card) for Ultimate probe testing system. System Architecture

IPHC_HFT 06/15/ LG10 Probe Testing Status RDO boards, USB=>GPIB module, Probe Station, Control PC, PS all in hand and working. Probe card schematics finished. Probe card layout in progress. Scripted probe testing framework is defined. Scripted sensor testing is already working for individual sensor characterization and we will incorporate this framework for testing into the overall control system for the automated production testing. We plan to have probe testing working by September.

Ultimate – proposed functional testing capabilities IPHC_HFT 06/15/ LG11 important

Ultimate testing IPHC_HFT 06/15/ LG12 The addition of the SUZE zero-suppression circuit requires us to test sensor function differently than on Phase-1 (multiple steps for each sensor functional block). Some discussion of this in IPHC-LBNL phone conference. These discussions led to a proposal for automated built-in testing sequences. on_testing_revised.pdf on_testing_revised.pdf Examine possible testing sequences for individual and production testing with proposed testing functionality.

IPHC_HFT 06/15/ LG13 Individual sensor characterization will be needed to determine the operating characteristics of the sensor after it is received. We may need to modify the testing plan as it is currently envisioned based on what we learn during characterization. We should evaluate what the built in testing functions allow. We will need to production test ~ 3200 Ultimate sensors (assuming 50% yield and 4 complete detectors). Ultimate testing

IPHC_HFT 06/15/ LG14

Ultimate individual testing 1.JTAG - As per Phase-1. 2.Characterize the bias point response in the comparator transfer function to select running biases. Compare to the nominal biases. 3.Sequence of other tests as per Christine’s slide. 4.Test sensor as a whole for operating characteristics through the pixel- discriminator functional block chain. 5.LED pulse - read out at register after the comparator blocks, 1 row at a time. This tests the pixel + discriminator. As currently envisioned, there is no way to test the LED pulse through the whole sensor functional block chain (SUZE overflow in row). Note that (2-5) need to be accomplished 1 row at a time (unless auto- increment function is integrated into the sensor test readout). IPHC_HFT 06/15/ LG15

Ultimate individual testing Discriminator transfer function generation sequence. JTAG access to set threshold. – JTAG access to set row for capture. – Send START to begin RDO. – Read 1 row of data. – JTAG access to set next row for capture. – Send START to begin RDO. – Repeat ~ 1k cycles to capture complete sensor array. – Repeat N times to get statistical sample. JTAG access to set new threshold. Repeat ~30 times to map discriminator transfer functions. Repeat for each bias point setting. IPHC_HFT 06/15/ LG16 Comparator transfer function procedure ~10 hrs JTAG access time per bias point setting (at existing speed)

Ultimate individual testing Discriminator transfer function generation sequence. JTAG access to set threshold and auto increment. – Send START to begin RDO. – Read N frames of data. JTAG access to set new threshold. – Repeat ~30 times to map discriminator transfer functions. – Repeat for each bias point setting. IPHC_HFT 06/15/ LG17 Comparator transfer function with auto-increment This results in more than a factor of 10 4 fewer JTAG accesses. Will the 1152 column readout register have the same readout time as the frame integration time? ~4 seconds JTAG access time per bias point setting (at existing speed)

Ultimate production testing IPHC_HFT 06/15/ LG18

Ultimate production testing As in the case of Phase-1, production testing will depend in large measure on what is discovered in individual sensor characterization. The production testing plan, if nominal bias values can be found, can be as described previously (with readout line by line). If additional production testing is required, the auto increment function will be required for testing avoiding the overhead of JTAG accesses and multiple acquisition cycles. IPHC_HFT 06/15/ LG19

Testing issues to be addressed Phase-1 Efficiency testing – need to do beam tests. Options? Design questions addressed in Phase-1 testing presentation. Ultimate Built-in testing functionality… What is the spec and pad for the serial 1152 column readout? Auto increment function in register readout for post comparator registers. Can this be implemented? What is reasonable for production testing of SUZE? Auto increment function in column space as well would allow for windowing and read out of whole sensor functional block chain through SUZE. Is this desirable? IPHC_HFT 06/15/ LG20

end IPHC_HFT 06/15/ LG21