The Mappers: “We find your way” MSE Studio: Automated Test System P&C #1 2008-09-22 1P&C #1.

Slides:



Advertisements
Similar presentations
Airline Reservation System
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Estimation using COCOMO More Science, Less Art. COCOMO History COCOMO History Constructive Cost Model Dr. Barry Boehm TRW in 1970s COCOMO
ClosingExecuting/ Controlling ControllingPlanningInitiatingOpportunityAssessment Client AcceptancePlanning ApprovalInitiating ApprovalOpportunity Assessment.
Using UML, Patterns, and Java Object-Oriented Software Engineering Royce’s Methodology Chapter 16, Royce’ Methodology.
Project Kick-off 14-Jan-09.
Cocomo II Constructive Cost Model [Boehm] Sybren Deelstra.
Iterative Process Planning
SUMMER 2005 JUNE Preparing an Organizational Change Management Plan Org Change Management Activities by Project Phase.
OO Development Process. UML and Process UML standardizes notation, not process –Increase likelihood of widespread acceptance There is significant variability.
2/13/07(c) USC-CSSE1 An Empirical Study on MBASE and LeanMBASE Supannika Koolmanojwong Center for Systems and Software Engineering CSSE- Annual Research.
1 CORADMO in 2001: A RAD Odyssey Cyrus Fakharzadeh 16th International Forum on COCOMO and Software Cost Modeling University of Southern.
PRJ480 Mastering the Management of Iterative Development v2
Iterative development and The Unified process
© 2005 Prentice Hall2-1 Stumpf and Teague Object-Oriented Systems Analysis and Design with UML.
Using CLIPS to Detect Network Intrusions - (CLIPNIDS) Phase I MSE Project Sripriya Marry Committee Members Dr. David Gustafson (Major Professor) Dr. Rodney.
Process: A Generic View n A software process  is a roadmap to building high quality software products.  provides a framework for managing activities.
Project Management Process Overview
Rational Unified Process
Using IBM Rational Unified Process for software maintenance
After Lesson 6 next is Lesson 13 to fit topic on Software Development SOFTWARE PROJECT MANAGEMENT.
The Mappers: “We find your way” MSE Studio Automated Test Framework 1 05 th December 2008 Presenter: Filipe Martins P&C Implementation.
New Tools in an Old Company PMI Honolulu Chapter Meeting June 20, 2007.
Chapter 2 Process: A Generic View
Software Process Models.
CS480 Computer Science Seminar Introduction to Microsoft Solutions Framework (MSF)
Fundamentals of Project Management A complete flow.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
1 Chapter 23 Estimation for Software Projects. 2 Software Project Planning The overall goal of project planning is to establish a pragmatic strategy for.
Mastergoal Machine Learning Environment Phase 1 Completion Assessment MSE Project Kansas State University Alejandro Alliana.
Student Curriculum Planning System MSE Project Presentation I Kevin Sung.
Project Management Process Groups and Knowledge Areas Source: PMBOK 4 th Edition Prepared
REAL TIME GPS TRACKING SYSTEM MSE PROJECT PHASE I PRESENTATION Bakor Kamal CIS 895.
Chapter 2 Iterative, Evolutionary, and Agile You should use iterative development only on projects that you want to succeed. - Martin Fowler 1CS
Physics Project Management Chin-Sung Lin Eleanor Roosevelt High School.
Final Presentation Prepared by: Arezoo Gazerzadeh Syed Ahmed Floyd J. Srubar Damian Ottley Ramakrishna Gudikandhula.
PMCenter Project SPRING 2004 MOSP Team GEO. 2 Agenda Introduction Semester Goal Project Management ­Iteration Plan ­Risk Management ­Process Handbook.
Process: A Generic View
Project Management in the Software Development Environment CIS490.
Teaching material for a course in Software Project Management & Software Engineering – part V.
©1999 Addison Wesley LongmanSlide 3.1 Managing IS Projects Planning –Decomposing Project into Activities –Estimating resources –Developing a schedule –Setting.
Estimation using COCOMO
Function Points Synthetic measure of program size used to estimate size early in the project Easier (than lines of code) to calculate from requirements.
Estimating “Size” of Software There are many ways to estimate the volume or size of software. ( understanding requirements is key to this activity ) –We.
Effort Estimation In WBS,one can estimate effort (micro-level) but needed to know: –Size of the deliverable –Productivity of resource in producing that.
Project Initiation at The Regence Group 12/19/2015John Garrigues1.
eMerger Integration Planning
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
Rational Unified Process (RUP)
Communication Model for Cooperative Robotics Simulator MSE Presentation 1 Acharaporn Pattaravanichanon.
P r o j e c t : from INITIATING to CLOSING ( 1 ).
Project Management Overview U08784Software Project Management Rosemary Phillimore.
Software Testing Process
Rating Very Very Extra Cost Drivers Low Low Nominal High High High Product Attributes Required software reliability Database size.
Viking Estimation Team Assignment 13 Team 2-1. Content 1/ Introduction 2 / Wideband Delphi & COCOMO II 3 / The assemble task formula 4 / Wideband Delphi.
The Software Engineering Process Discussion Slides.
Project Planning Goal 1 - Estimates are documented for use in tracking and planning project. Goal 2 - Project Activities and commitments planned and documented.
Software Architecture Architecture represents different things from use cases –Use cases deal primarily with functional properties –Architecture deals.
Kick Off Call Account Name Date. © 2013 Citrix | Confidential – Do Not Distribute Agenda Team Introductions Discovery Fact Sheet/Apps & Features Implementation.
IT-301 Project Management I: Unit 4: Cost Management.
ITDA Transition/Transformation/Project Management Services © 2008 IBM Corporation Server Services December 11, 2008.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Estimation Questions How do you estimate? What are you going to estimate? Where do you start?
AET 550 Week 6 Learning Team Performance Improvement Plan, Part II To purchase this material click below link
Cost Estimation with COCOMO II
Cost Estimation with COCOMO II
Multi-Build Software Cost Estimation Using COINCOMO
Presentation transcript:

The Mappers: “We find your way” MSE Studio: Automated Test System P&C # P&C #1

The Mappers: “We find your way” Agenda Studio Project Team and Roles Schedule Roadmap Tools Budget P&C #12

The Mappers: “We find your way” Agenda P&C #13 Studio Project Team and Roles Schedule Roadmap Tools Budget

The Mappers: “We find your way” Studio Project Automated Testing Framework Client Main Objective Develop a framework that will be integrated in testing processes used by the Novabase Quality Assurance department P&C #14

The Mappers: “We find your way” Agenda P&C #15 Studio Project Team and Roles Schedule Roadmap Tools Budget

The Mappers: “We find your way” Team and Roles Team Mappers LOGO Team Roles P&C #16 Team RolesAssigned to Project LeaderAntónio Alvim Communication ManagerAntónio Alvim Client ManagerPedro Mota Process ManagerPaulo Casanova Configuration ManagerFilipe Martins System ManagerPedro Saraiva

The Mappers: “We find your way” Agenda P&C #17 Studio Project Team and Roles Schedule Roadmap Tools Budget

The Mappers: “We find your way” Schedule Meetings Internal (weekly) Mentors (weekly) Client o Kick-off ( ) Process to perform meeting (all types) P&C #18

The Mappers: “We find your way” Agenda P&C #19 Studio Project Team and Roles Schedule Roadmap Tools Budget

The Mappers: “We find your way” We’ve doneWe’re doing We’re going to do Roadmap Group name and Corporate Image Meetings Virtual machine installation & Support Tools Created high-level Plan Prepared for the first P&C Defining Processes Planning group work Analyzing client information Start detailing the WBS Second client meeting Requirement elicitation P&C #110

The Mappers: “We find your way” Agenda P&C #111 Studio Project Team and Roles Schedule Roadmap Tools Budget

The Mappers: “We find your way” Tools Main Tools P&C #112

The Mappers: “We find your way” Agenda P&C #113 Studio Project Team and Roles Schedule Roadmap Tools Budget

The Mappers: “We find your way” Budget P&C #114

The Mappers: “We find your way” Questions P&C #115

The Mappers: “We find your way” P&C #116

The Mappers: “We find your way” Example Estimation The Estimative using COCOMO II P&C #117 Cocomo II Scenario 1Scenario 2 New Reused00 Modified00 Total Effort Adjustment Factor = 2.0 Effort 26.7 Person-months34.1 Person-months Schedule 10.4 Months11.3 Months MBASE Phase Distribution Effort (Person- months) Effort Schedule (Months Effort (Person- months) Effort Schedule (Months Inception Elaboration Construction Transition