The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.

Slides:



Advertisements
Similar presentations
F AEM - 22 Jan 07 Separator Spark History Ron Moore Fermilab – Tevatron Dept.
Advertisements

Engine Tune-Up Chapter 47.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Center for Materials for Information Technology an NSF Materials Science and Engineering Center Vacuum Fundamentals Lecture 5 G.J. Mankey
Progress and Plan for Superconducting RF Cavity RF Group.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
FUNDAÇÃO PARA A CIÊNCIA E TECNOLOGIA FCT Trainee Program Follow Up João Rodrigo Alvelos Ferreira | Started March 2013 October 2014 TE-VSC-ICM.
Vacuum equipment. Pumps Rotary vane pumps Rotary piston pumps Roots pumps Turbo molecular pumps Diffusion pumps Getter pumps –Sublimation pumps.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
H. Herzog, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN LARGE SCALE CRYOGENIC.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
Proton Source Vacuum Plan By David B. Augustine Ben Ogert Jr. August 30, 2011.
Techniques of Vacuum and Basics of High Voltage (2/3) Pauli Heikkinen Jyväskylä University.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Training in Vacuum Technology for JUAS 2013 Students
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
January 4, 2007 RHIC II Project Internal Cost Review Existing RHIC power supply Modifications Don Bruno & George Ganetis January 4, 2007 Power Supply Modifications.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Installation of the T600 at Fermilab CSN2, September 22,
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 2/21/
Performed at Brookhaven National Lab for Fermilab Main Injector Electron Cloud Studies June 2009 Linda Valerio September 11, 2009.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
Guillaume Olry, Sébastien Bousson CNRS/IN2P3/ IPN Orsay – Paris-Sud University Experience on Spiral2 cavity cleanliness degradation during clean room assembly.
ESS Vacuum Standardization
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
Installation of the T600 at Fermilab
CERN – Zanon discussions
Cryomodule test stand at ESS site
Fault Screen (“FAULT”)
Project X: Cryogenic Segmentation Issues
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Regular cryomodule maintenance plans (radiation damage, seals, etc)
The Fermi National Accelerator Laboratory is a U. S
SNS PPU Cryomodule Instrumentation
Hall C SHMS & Configuration Status
Vacuum System Design for the Target Monolith System
Presentation transcript:

The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1

Outline Tevatron overview and some history Vacuum upgrades Cryogenic upgrades Maintenance and records Vacuum diagnostics Failures Lessons Learned 2

Fermilab Site Overview 3

The Tevatron contains 24 Cryogenic loops. 48 Insulating vacuum systems 24 Cryogenic beam vacuum systems 29 Major and minor warm straights A cornucopia of gauges, valves, mechanical pumps, ion pumps, titanium sublimation pumps, and NEG 4

The Tevatron is installed under the original Main Ring Accelerator 5

Some history Originally Tevatron operated in fixed target mode Vacuum in warm insertion points was Torr Insulating vacuum was to Torr Cryogenic temperature was 4 to 4.5 K 6

Cryogenic and vacuum upgrades Cryogenic system was upgraded – Magnets now operate colder which allows higher current on buss without quenching Warm vacuum insertion points were upgraded – Better choice of materials – Improved cleaning technique – Vacuum baking Reduced beam scattering due to poor vacuum 7

Tevatron Superconducting Dipole 8 Insulation Vacuum Seal Nitrogen Beam Vacuum Pop-Up LHe, SC WIRE He Return CVI

Cryogenic Beam Vacuum System No elastomers between the beam vacuum and atmosphere Ion pumps various types, area dependent Seals are all metal Gauges are thermocouple, cold cathode, and ion Vacuum pump out valves are all metal Isolation valves are metal sealed on the outside but o-ring sealed on the gate 9

Warm Beam Vacuum No elastomers between beam vacuum and atmosphere System mostly electro-polished stainless steel or ceramic Non metal objects are measured for out gas rate prior to installation Many objects vacuum baked in situ Electrostatic separator areas have all metal gate valves 10

Cryogenic Insulating Vacuum system One turbo molecular and roughing pump every 450 feet Vacuum breaks every 100 feet with isolation valves EPDM (Ethylene Propylene) o-rings specified Almost everything on the insulating vacuum system is sealed with o-rings 11

Maintenance records Then – Originally all installations and repairs entered into paper log books – Information difficult to find Now – All log books are web driven databases – Most accessible and editable outside of the Main Control Room – Electronic work list for work on operational equipment 12

Tevatron E-Log Maintenance entry 13

Electronic Work List 14

Vacuum remote readouts Then – Limited remote control of vacuum hardware – Limited ability to data log past history of an individual device Now – Lots of computing power to data log thousands of devices – Vacuum read out and control pages readily accessible 15

An example of a Tevatron Vacuum page, house A-2 ACNET driven 16

An Example: Vacuum and

An Example of Diagnosis

Failures 19

Tevatron repair Normal cryoloop – Seven days cold to cold with around the clock shifts Low Beta cryoloop – 12 days cold to cold with around the clock shifts 20

Typical Repair Routine During Warmup – Crews assigned – Insulating vacuum spoiled to assist warmup – Spares selected and tested – Equipment stationed in tunnel When Warm – Insulating vacuum pumped out – Insulating vacuum leak checked first – Cryogenic circuits leak checked next – Sometimes damage obvious ie a 4000 amp ground fault 21

Ground Faulted magnet 22

View of beam tube 23

Equipment Diffusion pump based leak detectors with upgraded electronics Electronic signal from all leak detectors fed to one custom computer (1 to 16 channel chart recorder lab view based) All signals can be analyzed at one time and compared to one another 24

Leak Detector 25

Chart Recorder 26

Chart of test 27

Lessons Learned O-rings Problem: original EPDM o-rings cleaned with acetone, causing o-ring to melt over time Solution: switched to EPDM colorized series o-rings for easy identification to choose correct cleaning solvents 28

The O-ring fix continued It takes many hours to disconnect, replace and o-ring We decided to vulcanize a new o- ring around the interface saving ~4 hours per interface 29

The end of a great run Collider run to end FY 2011 Performance of collider chain was stellar The Tevatron will be warmed to room temp Much of the vacuum infrastructure will be used in future neutrino projects 30

Acknowledgements This presentation was made possible by the gracious assistance of: Lucy Nobrega, Cryomodule Test Facility Vacuum Engineer Linda Valerio, Accelerator NuMI Upgrade Installation Engineer 31