1 Nuclotron-based Ion Collider fAcility I.N.Meshkov for NICA Working Group Scientific Workshop Dedicated to The Centenary of V. I. Veksler's Birth and.
“NUCLOTRON-M” - кеу element of NIKA A.D.Kovalenko.VHM Workshop, September 19, 2007, Dubna.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
Ion Accelerator Complex for MEIC January 28, 2010.
SIS 100 – Fast ramped superconducting magnets E. Fischer, GSI Darmstadt Meeting of the Design Study Committee for the EU contract "DIRACsecondary-Beams"
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
IR Magnets for SuperKEKB KEK, Norihito Ohuchi 1.IR Magnets (ES, QCS, QC1) 2.Interference between Magnet-Cryostats and Belle 3.Summary SuperB.WS05.Hawaii.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
The Project NICA/MPD at JINR (Dubna) Search for the Mixed Phase of Strongly Interacting Matter at Nuclotron-based Ion Collider FAcility (1  1.5)·10 27.
Concept of a hybrid (normal and superconducting) bending magnet based on iron magnetization for km lepton / hadron colliders Attilio Milanese, Lucio.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
IHEP participation in SIS300 production UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Institute for High Energy Physics Protvino, Russia FAIR meeting.
SIS 100 main magnets G. Moritz, GSI Darmstadt (for E. Fischer, MT-20 4V07)) Cryogenic Expert Meeting, GSI, September 19/
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
Cryogenic Experts Meeting (19 ~ ) Cooling scheme discussion for 300 Tm High Energy Beam Transfer line (HEBT) with large inclination MT/FAIR –
1 Machine Advisory Committee Video-Conference JINR, Dubna May 20, 2009 Concept and Status of The NICA Project Nuclotron-based Ion Collider fAcility I.Meshkov.
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
Peter Spiller, CBM collaboration meeting GSI-Darmstadt 11. February 2004 Status of the future accelerator project.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Polarized deuterons and protons at NICA А.Коваленко NICA-SPIN_PRAGUE 2013 Charles University, Prague, July 7-12, 2013.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
NUCLOTRON CONTROL SYSTEM (NCS) V.Andreev, E.Frolov, A.Kirichenko, A.Kovalenko, B.Vasilishin, V.Volkov Laboratory of High Energies, JINR, Dubna.
Peter Spiller, GSI, ICFA workshop, Optimization of SIS100 Lattice and Dedicated Collimation System P. Spiller, GSI ICFA 2004 Bensheim
Status of the Source of Polarized Ions project for the JINR accelerator complex (June 2013) V.V. Fimushkin, A.D. Kovalenko, L.V. Kutuzova, Yu.V. Prokofichev.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
NICA start-up scenario + questions of instabilities A.Sidorin For NiCA team NICA Machine Advisory Committee at JINR (Dubna) October 19-20, 2015.
LARP Collaboration Meeting, April 19, 2007Super-Ferric Fast Cycling SPS – Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac - Motivation.
Cold test of SIS-300 dipole model Sergey Kozub Institute for High Energy Physics (IHEP), Protvino, Moscow region, Russia.
1 Alexey Sissakian Director, Academician of RAS JINR: Results and Prospects R–ECFA meeting 8 – 10 October, 2009.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
GSI Helmholtzzentrum für Schwerionenforschung GmbH The Optimized Superconducting Dipole of SIS100 for Series Production ICEC26 March 9th, 2016 GSI Helmholtzzentrum.
Development of the Nuclotron Accelerator Complex for generation heavy ion beams with an energy of 5 GeV/u (project “Nuclotron-M” – 1 st stage of the NICA/MPD.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
September 27, 2007 ILC Main Linac - KOF 1 ILC Main Linac Superconducting Quadrupole V. Kashikhin for Magnet group.
HTS and LTS Magnet Design and Prototyping for RAON
1 PAC for Particle Physics JINR, Dubna January 14, 2010 Status of the TDR for NICA project Nuclotron-based Ion Collider fAcility G. Trubnikov for NICA.
1 NICA Project at JINR Nuclotron-based Ion Collider fAcility I.Meshkov for NICA team September , 2011, Alushta, Ukraine hosted by JINR, Dubna IX.
Three stages of the NICA project: status and tasks
NICA injection complex status
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
CBM magnet overview of the BINP work
contribution to the round table discussion
SLHC –PP WP6 LHC IR Upgrade - Phase I.
A.Sidorin, on behalf of the team PP PAC, JINR, Dubna, 16 January 2017
A. Martynov on behalf of accelerator division.
Status of the Nuclotron-M project
JINR Experience in SC Magnets
Status of the PANDA Magnet
ПОЛНОЕ НАЗВАНИЕ ПРОЕКТА
Why are particle accelerators so inefficient?
Project "Nuclotron M" / NICA
SLHC-PP kick-off meeting, CERN 9 April 2008
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
JLEIC SC Magnets: Replace SF and High CM Energy Needs
JLEIC SC Magnets: Replace SF and High CM Energy Needs
F.Pasdeloup, H.Prin, L. Williams
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, A.D. Kovalenko Conceptual design proposal by AC WG-II

NICA general layout by WG-II A.D. Kovalenko The possibility of fixed target experiments is exist; The investigation of light and middle weight ion collisions including polarized deuterons ( collision energy and luminosity will be larger in the case ); The experiments at the internal target installed inside one the collider rings can be considered as well; ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, NOTE: THE IDEA TO CONSIDER ION COLLIDER BASED ON THE NUCLOTRON WAS PUT FORWARD BY THE ACCELERATOR WORKING GROUP II

NICA: cost &schedule by WG-II A.D. Kovalenko The design and construction of magnets and cryogenic systems of the both as booster and collider can be made by JINR and JINR member-countries. Part of special works on RF system, fast kickers, special SC – magnets and some other systems should be performed by those collaborating Laboratories who have more experience in the mentioned directions. ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, Cost of the booster is based on the Nuclotron project cost scaled as ratio of the lengths. The collider rings cost is estimated based on the LHC cost. The two main scale factors were used: ratio of the lengths (k 1 ) and ratio of the magnetic fields ( k B 2 ), i.e. C NICA = C LHC / k 1 ·k B 2. Cost of R&D, preparatory work, transfer lines, injection and extraction systems, radiation safety conditions unexpected works will increase this cost by a factor of

The essential cost saving factors A.D. Kovalenko No new buildings, no additional power supply lines, heat, water cooling; The U-beam peak energy (2.5 GeV/u) used in the colliding mode is much less than that was discussed preliminary for fixed target experiments (5-10 GeV/u); thus, the problems of radiation safety will take less cost; The needed upgrade of the Nuclotron ring including ion source has been considered and presented within the project “Nuclotron-M”; The design of a fast-cycling superferric 84 m booster for the Nuclotron was made earlier, although the lattice should be redesigned based on the new specification and the recent data obtained at BNL, CERN and GSI; The JINR has a long-term experience in superconducting cables and magnets design and fabrication, thus magnet-cryostat systems of both as booster and collider rings can be manufactured by the Institute’s workshops; Additional high capacity cryogenic plant is not necessary. ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, 2006.

The existing Nuclotron facility A.D. Kovalenko The Nuclotron was built for five years ( ), the main equipment of its magnetic system, and many other systems as well, was fabricated by the JINR central and the LHE workshops without having recourse to specialized industry. The Nuclotron ring of m in perimeter is installed in the tunnel with a cross-section of 2.5m x 3 m that was a part of the Synchrophasotron infrastructure ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, The main design criteria specified for the Nuclotron construction were the following: · Much less electric power consumption; · Substantial improvements of vacuum inside a beam pipe; · Faster ramp and longer flat top of the magnetic field; · Cost saving for materials and work; · Maximum use of the existing facilities and infrastructure of the Synchrophasotron. All the mentioned conditions were realized in within the project: “Replacement of the Synchrophasotron magnetic system by a superconducting one – Nuclotron”. NOTE: the injector (ion sources, linac upgrade, booster) and slow extraction system as were not included in the project due to lack of money

A.D. Kovalenko ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, 2006.

A.D. Kovalenko NUCLOTRON: MAIN PARAMETERS ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, 2006.

A.D. Kovalenko SYNCHROPHASOTRON / NUCLOTRON: ANNUAL RUNNIG TIME ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, 2006.

SEARCHING for the MIXED PHASE A.D. Kovalenko ACCELERATOR R&D GOAL DISCUSSED AT THE ROUND TABLE-I: Au, …, U – ion beams at the energies above 5 GeV/u ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, THE MAIN NECESSARY NUCLOTRON DEVELOPMENT ION SOURCE KRION VACUUM IN THE RING FIELD RAMP B  2 T/s LINAC LU-20 UPGRADE BEAM DIAGNOSTICS etc.

A.D. Kovalenko Reaching 5 Gev/u for heavy ions ( A~ 200) pc(GeV/cu) = 0.3Bρ(z/A) (Tm), where ρ = L(B)N/2π Operation of the Nuclotron magnetic system at 2.2 T make it possible to reach GeV/u if z/A=0.5. Thus, 5 GeV/u can be reached for z/A = The number of dipoles in the Nuclotron ring, N =96: = m, ρ = m and pc = 12.55(z/A) = m,ρ =21.17 m and pc = 13.96(z/A) ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, 2006.

A.D. Kovalenko PROJECT “NUCLOTRON-M” The project include : improvement of the beam pipe pumping system; structural magnets power supply upgrade; beam extraction system; beam diagnostic and control system; RF system; beam transfer line from the Nuclotron ring to the main experimental area; radiation shield ( F3 area mainly); cryogenic supply system; ion source development; booster magnets R&D ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, The project “Nuclotron-M” has been prepared for the approval procedure. The project cost is about 3.0 M USD for two years starting from 2007.

Ion source KRION A.D. Kovalenko We consider as practically feasible for realization within the coming two years the new ion source with 6 T solenoid and pulse repetition rate of 5-10 Hz, i.e. (4-8)10 10 U 30+ ions per second. ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, The improved EBIS-type ion source KRION is chosen for generation of the primary beam of highly charged state ions.

A.D. Kovalenko NUCLOTRON: HEAVY ION INJECTION SCHEME LIMITATION from LU-20: Z/A > 0.3 LIMITATION by KRION: higher charge state– lower intensity LIMITATION by the NUCLOTRON: single-turn injection ( 8.3 mks ) ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, 2006.

Booster/Nuclotron/Collider A.D. Kovalenko ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, 2006.

Booster/Nuclotron/Collider A.D. Kovalenko ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, 2006.

A.D. Kovalenko FAST CYCLING BOOSTER ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, The maximum operating current was increased to 12 kA. The current ramp rate of 120 kA/s was obtained at cycled operation at 3 Hz. Limitation from the power supply voltage ( 40 V)

A.D. Kovalenko The version is similar to that presented earlier at ASC’2000, EPAC2000 and EPAC2002. The circumference of the booster ring is 1/3 of the Nuclotron. The large aperture of both lattice dipole and quadrupole magnets is one of the main design features. the magnet cold mass consisting of a SC-winding, a beam pipe, a reinforcing shell and correcting windings (if needed), is fabricated as a common rigid unit separated from the iron yoke. The yoke temperature of 80 K. The cold mass having a substantially lower weight and surface and the cooled iron yoke are suspended inside the cryostat, The two substantial features should be realized in the new design: 1) pulse repetition rate of 5 Hz and 2) high level of vacuum in a beam pipe. The possibility to construct superferric magnet operating at 3-5 Hz have been demonstrated at our Laboratory. The 80K yoke magnet models have been tested also. The new 12 kA NbTi composite hollow cable have been manufactured and tested. The new booster lattice of DF- type is under optimization. The maximum energy of the booster should exceed 100 MeV/u to provide reasonable (practically achievable) vacuum level in the Nuclotron beam pipe. ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, BOOSTER

A.D. Kovalenko ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, 2006.

NICA: 4 T COLLIDER DIPOLE A.D. Kovalenko THE CONCEPT OF HOLLOW CABLE COOLED WITH TWO-PHASE HELIUM FLOW IS USED. NEVERTHELESS, THE SC WIRES ARE DIVIDED INTO THREE ELECTRICALLY INSULATED GROUPS. ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, 2006.

A.D. Kovalenko NICA: OPERATION CYCLE & COOLIG POWER ROUND TABLE DISCUSSION-2, JINR, Dubna, October 6- 7, The total equivalent refrigerator load needed to cool the NICA facility will be 3290 W at 4.5 K. Taking into account also about 30 % capacity reserve, necessary equivalent capacity of the refrigerators estimated to 4.3 kW at 4.5 K. 3 x 7 SC wires of 1.04 mm equivalent diameter each. I o = 5 kA, I c = 7.89 kA