Global Design Effort - CFS 07-07-11 Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.

Slides:



Advertisements
Similar presentations
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Advertisements

Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
Global Design Effort - CFS ILC CFS Baseline Technical Review - CERN 1 ILC CFS BASELINE TECHNICAL REVIEW AMERICAS REGION LIFE SAFETY CONVENTIONAL.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS 1 DRAFT CFS Global Meeting 29 July 2009 CONVENTIONAL FACILITIES AND SITING GROUP : Safety documents Safety documents 3d modeling.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
DR Layout Description ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
2011 Damping Rings Lattice Evaluation WebEx Meeting May 24, 2011 Mark Palmer Cornell University.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP IWLC10.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Conventional Facilities and Siting Global Group (ARCFS)
Conventional Facility & Siting (CF&S) Overview for the Positron Source
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
ILC CFS AD&I Daresbury Lab Summary
Tom Lackowski Revised 10/12/2011
ILC - Global Design Effort
Presentation transcript:

Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING GROUP CFS Damping Ring Overview V. Kuchler

Global Design Effort - CFS Damping Ring Baseline Technical Review Preparation for the DR BTR A One-Day CFS Mini-Workshop for Damping Ring Criteria was Held on June 2 at FermilabA One-Day CFS Mini-Workshop for Damping Ring Criteria was Held on June 2 at Fermilab  Damping Ring Layout and Dimensioning  Mechanical Criteria and Equipment  Electrical Loads and Equipment Updated Criteria was Reviewed at the Weekly CFS Webex Meeting on June 28Updated Criteria was Reviewed at the Weekly CFS Webex Meeting on June 28 Criteria was Reviewed Directly with M Ross Throughout the Process of DevelopmentCriteria was Reviewed Directly with M Ross Throughout the Process of Development CFS Progress was Also Presented at the June 9 Global Systems Meeting and the June 22 AD&I MeetingCFS Progress was Also Presented at the June 9 Global Systems Meeting and the June 22 AD&I Meeting 2

Global Design Effort - CFS Damping Ring Baseline Technical Review Preparation for the DR BTR Several Aspects of the Damping Ring Design Were DiscussedSeveral Aspects of the Damping Ring Design Were Discussed  Personnel will not Occupy the RF Cavern During Beam On Conditions  Final Configuration of the RF Cavities, Klystrons and Related Equipment  A Thermal/Radiation Barrier will be Required Between the RF Equipment Cavern and the Damping Ring Tunnel  Beamline Spacing was Established  Tunnel Temperature Requirements were Established Including the Need for Temperature Isolation of Wiggler Areas  Magnet Power Supply Spacing and Configuration  Requirements for Equipment Alcoves for Injection/Extraction Straight Section 3

Global Design Effort - CFS Damping Ring Baseline Technical Review 4 Damping Ring Documentation Initial CFS Criteria Package, Including Specific Criteria, Mechanical and Electrical Load Tables and Drawings, were Developed and Posted to EDMSInitial CFS Criteria Package, Including Specific Criteria, Mechanical and Electrical Load Tables and Drawings, were Developed and Posted to EDMS Based on Discussions at the CFS Webex Meeting, Drawings were Revised and Posted to EDMSBased on Discussions at the CFS Webex Meeting, Drawings were Revised and Posted to EDMS Results of this BTA will be Incorporated into the Criteria Package and Posted Again to EDMSResults of this BTA will be Incorporated into the Criteria Package and Posted Again to EDMS This Criteria will be the Damping Ring Criteria Used by CFS for the Technical Design ReportThis Criteria will be the Damping Ring Criteria Used by CFS for the Technical Design Report

Global Design Effort - CFS Damping Ring Baseline Technical Review Post DR BTR All CFS Criteria will be Updated as NeededAll CFS Criteria will be Updated as Needed Once CFS Criteria is Finalized Some Additional Drawings May be Needed to Fully Describe the Damping Ring ConfigurationOnce CFS Criteria is Finalized Some Additional Drawings May be Needed to Fully Describe the Damping Ring Configuration The Final Complete Criteria Package will the be Posted on EDMSThe Final Complete Criteria Package will the be Posted on EDMS Adjustments Required for Civil Design will be Incorporated into the In-House Civil Design EffortsAdjustments Required for Civil Design will be Incorporated into the In-House Civil Design Efforts Updated Mechanical and Electrical Criteria and Requirements will be Provided to Consultants Working on the ILC Mechanical and Electrical Design and Cost EstimatesUpdated Mechanical and Electrical Criteria and Requirements will be Provided to Consultants Working on the ILC Mechanical and Electrical Design and Cost Estimates 5

Global Design Effort - CFS Damping Ring Baseline Technical Review 6 CFS Damping Ring Cost Estimates CFS RDR Cost EstimateCFS RDR Cost Estimate  A’’ Cost is the Current CFS Baseline Cost  SB 2009 Costs are Also Available  Project Wide Mechanical Costs were Extrapolated from One Major Main Linac Shaft  Damping Ring Mechanical Costs were Scaled Based on Relative Heat Loads  CFS Electrical Design and Estimate was Completed at CERN and has not been Updated  Independent Verification of the RDR Electrical Costs is yet to be Completed New CFS Damping Ring TDR Baseline CostsNew CFS Damping Ring TDR Baseline Costs  A Contract that will Provide a Mechanical and Electrical Design for the Complete ILC Project is in Place in the Americas Region  A Mechanical and Electrical Cost Estimate will Also be Provided as Part of this Work  Consultant Work is Scheduled for Completion Early September, 2011  The Design and Cost Estimate for Damping Ring Civil Construction will be Completed In-House by the Americas Region Team

Global Design Effort - CFS Damping Ring Baseline Technical Review Summary The CFS Group Would Like to Thank S. Guiducci, M. Palmer and B. List for Their Help in the Development and Posting of the CFS Damping Ring CriteriaThe CFS Group Would Like to Thank S. Guiducci, M. Palmer and B. List for Their Help in the Development and Posting of the CFS Damping Ring Criteria The CFS Group Intends to Use this Same Criteria Format for All Other ILC Area SystemsThe CFS Group Intends to Use this Same Criteria Format for All Other ILC Area Systems While “Final Criteria” Does Sound Good, Changes Due to Evolving Damping Ring Design and/or Interfaces with Other Areas Systems will Necessarily Require Adjustments to the CFS Information and Re-Posting to the EDMS System, Presumably Under the Constraints of Some Form of Change Control OversightWhile “Final Criteria” Does Sound Good, Changes Due to Evolving Damping Ring Design and/or Interfaces with Other Areas Systems will Necessarily Require Adjustments to the CFS Information and Re-Posting to the EDMS System, Presumably Under the Constraints of Some Form of Change Control Oversight 7