1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.

Slides:



Advertisements
Similar presentations
FGT installation disks … viewed from the back (From West end looking in towards vertex). SSD cables go in the spaces above and below the rails on the left.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
CONDUCTORS + CAPACITORS
Click on this image to open the full PDF document.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
1 Potential Hardware Improvements, Related R&D Wieman RNC LBNL TPC Review Friday 6 October 2006.
1 Integration issues of FPCCD VTX Yasuhiro Sugimoto May 22,
1 GEOMETRY FOR TRACKER Eduardo do Couto e Silva - 2/11/00 (drawings are NOT to scale) 1 - List of Figures 2 - Top view of tray with 5 x 5 detectors 3 -
D. Peterson, “ILC Detector Work”, Cornell Group Meeting, 4-October ILC Detector Work This project is supported by the US National Science Foundation.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
O Ring Groove (1) Bolt holes for fastening strongback to TPC wheel (26) SHV feedthroughs to feed HV wires to ABDB on side ports, all connectors are vacuum.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
HFT & PXL geometry F.Videbæk Brookhaven National Laboratory 13/9/12.
1 Computer Power Supply Amateur Radio Conversion For Cheap +12 vdc Power March 17, 2003.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
Shielding the Weiner PSU 7 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
Nov PHYS , Dr. Andrew Brandt PHYS 1444 – Section 003 Lecture #20, Review Part 2 Tues. November Dr. Andrew Brandt HW28 solution.
Setting up the Ricoh C305 Press F5 to start the Presentation
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
HV connection for a Common GEM foil design Aiwu Zhang
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
PAD MONITOR The TPC pad monitor is used to check the performance of the TPC electronics. It can display the amplitude vs time bucket histogram for all.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
The GRI Laue-lens and lens spacecraft - configuration options - lens performance calculations Niels Lund Danish National Space Center.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
TPC ExB distortion at LHC-ALICE experiment Yasuto Hori for the ALICE-TPC collaboration Center for Nuclear Study, University of Tokyo 1.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
1 Jim Thomas - LBL Changes to the Inner Sector Strongback to accommodate a wall between the inner and outer sectors (and a 2 nd wall at the innermost edge.
Jeopardy (CP) Subterm 2 Review Topics Covered: Waves Sound Electrostatics Circuits Magnetism.
1 Jim Thomas - LBL iTPC Soldering Notes Alexei Lebedev & Jon Wirth with additional notes by Qinghua Xu, Eric Anderssen and Jim Thomas 10/28/2015.
1 Jim Thomas - LBL Sector Tools – a conversation with Jon Wirth and Eric Anderssen August 28 th, 2015.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
2007 Oct 21 GEM Panel for LP1 Akimasa Ishikawa (Saga University) For CDC group.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
1 Jim Thomas - LBL Inner Sector Upgrade for the TPC Jim Thomas Lawrence Berkeley National Laboratory UCLA Upgrades Workshop December 14 rd, 2011.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
Electrostatic FEA of the Ground Plane Features Bo Yu Sept. 14, 2015.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Value Engineering proposal: Putting APA’s on outside or put short drift cell on outside April 21, 2014, Post meeting rev. April 25, 2014 Russ Rucinski.
LBNF CAD models, Drawings and Component list
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
ob-fpc: Flexible printed circuits for the alice tracker
INSTALLATION SEQUENCE
Backward Calorimetry For SuperB
First tests on the roll-formed field cage.
C.Clerc ILD session, ALCPG /03/2010
First of all we will remind some numbers:
Jeopardy (cp) Subterm 2 Review Topics Covered: Waves Sound
Limited Streamer Tube Project Summary
Chapter 28 Sources of Magnetic Field
Presentation transcript:

1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth 9/26/2015

2 Jim Thomas - LBL Proposal 1 to close the “Grid Leak” Wall is 1.8 mm thick Printed Circuit Board with Cu on both sides Grey bumps are 1 M Ohm type 603 surface mount resistors -115 Volts matches the GG voltage when it is “open” -230 Volts provided by external power supply, -115 V provided by resistors to 0 Volts

3 Jim Thomas - LBL Yuri’s Simulation Geometry Pad Plane on top, Central Membrane at bottom Rotate ME views 180  around an axis coming out of the page Electrons float up, Ions fall down Note that Central Membrane is only 5 mm from the GG Outer Pad Plane Inner Pad Plane Fat Anode Wire 20  m Anode wires Gated Grid wires Ground Grid wires Central Membrane

4 Jim Thomas - LBL Normal Geometry: No Wall Geometry Equipotential Lines Ion Flux 1 e - /cm in, ~10 ions/cm out Grid Leak

5 Jim Thomas - LBL -230 volts on outside of wall

6 Jim Thomas - LBL -690 Volts on outside of wall

7 Jim Thomas - LBL Proposal 1: Conclusions A Biased wall will work Order of magnitude decrease of Ion Flux can be achieved ~700 volts required to do a good job Note that equipotential lines (lower right panels) guide the ions to the wall Mechanical Engineering is achievable –Requires 0.070” deep notch in top and bottom of inner sector so 1/16” G10 wall can be glued or screwed in place –Requires modest change in routing of Pad Plane, perhaps want to redesign ground plane on Pad Plane to reflect new routing pattern –One bias connector available on inner sector, have to run cable down existing groove on side (under pulser and GG boards) –Need to route bias cable around the corner of the sector to access wall –Want to do this on both top and bottom of Inner Sector (grid leak in both places)

8 Jim Thomas - LBL Proposal 2 to close the “Grid Leak” Volts -115 Volts 0.0 Volts Volts Volts 2.0

9 Jim Thomas - LBL Grounded fingers between the grids: Inner & Outer Sectors!

10 Jim Thomas - LBL Proposal 2: Conclusions Grounded Fingers will work – very simple conceptual design Order of magnitude decrease of Ion Flux can be achieved However, this solution requires changes to the outer sectors while still installed inside the TPC –Hands, heads, and tools inside the TPC! Epoxy, too. –Careful fixturing may make this solution possible –Engineering required, Risk analysis required Mechanical Engineering is achievable –Requires 0.070” deep notch in top and bottom of inner sector so 1/16” G10 wall can be glued or screwed in place –Requires modest change in routing of Pad Plane, perhaps want to redesign ground plane on Pad Plane to reflect new routing pattern A careful analysis of the equipotential lines (lower right panel) suggests that a river of ions flows very close to the GG and out the gap –The grid leak will never completely die … the river of ions will exist as long as there is a physical gap between the inner and outer gated grids

11 Jim Thomas - LBL Grand Conclusion Further work is needed before we can decide upon which solution is best: Biased Wall or Fingers between the grids –Is it reasonable to put ~700 volts on a wall near the wires? –Engineering design & Fixturing required for “Finger” solution –Risk analysis required for both proposals Both designs can/should be further optimized –But is seems unlikely that we can kill the grid leak substantially more than a factor of 10 below the current design The Mechanical Engineering design for the Strongback is the same for both of these solutions –We should add a 0.070” notch on the top and bottom sides of the inner sector to accommodate a 1/16” G10 (or Cu) Wall –Assume that we will run a cable to bias the wall, but we may not use it I believe the Mechanical Engineering design of the strongback is complete. We can now proceed with final drawings and fabrication of prototypes (JT).

12 Jim Thomas - LBL Backup Slides

13 Jim Thomas - LBL Location of Wires and Pads Radius (Y) Description 0.00Center of STAR Detector (vtx) Bottom of Full size PC Board Tertiary Fiducial L & R Strongback Bottom Edge Gated Grid Wire Gated Grid Wire Anode Wire 1 & GG W Anode Wire 2 & GG W Anode Wire 3 & GG W Secondary Fiducial Anode Wire 4 & GG W Anode Wire 5 & GG W Pad Row 1 - Center Pad Row 2 - Center Pad Row 39 - Center Primary Fiducial Pad Row 40 - Center Anode Wire 166 & GG W Anode Wire 167 & GG W Anode Wire 168 & GG W Anode Wire 169 & GG W Alternate Primary Fiducial Anode Wire 170 & GG W Gated Grid Wire Gated Grid Wire Strongback Top Edge Tertiary Fiducial L & R Top of Full size PC Board Repeat pad rows every 16 mm Wire Locations are the same as before except for the replacement of 6 thin anode wires with larger diameter anode wires (0.020 mm  mm) References: LBL Drawings 24A055, 24A373, 24A374