9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.

Slides:



Advertisements
Similar presentations
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Advertisements

Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
M2FS SAC UpdateMarch 18, 2012 System Overview: M2FS Spectrograph Two independent, identical channels Each fed by 128 fibers Each with LoRes and HiRes modes.
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
OFD 1 Oli Durney LBTI Optical Engineer Steward Observatory University of Arizona NIC Aperture, Pupil, and Filter Wheel Positions Rev. 2.3 September 19,
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
M2FS: Michigan/Magellan Fiber System. M2FS (Michigan/Magellan Fiber System) Fiber-fed MOS w/2 independent and identical spectrograph arms 256 total fibers.
Physics 681: Solar Physics and Instrumentation – Lecture 8 Carsten Denker NJIT Physics Department Center for Solar–Terrestrial Research.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
HBD Transmission Monitor: Update on Assembly & Testing HBD Working Group Meeting 8/29/06 B. Azmoun Brookhaven National Lab.
The Michigan/Magellan Fiber System (M2FS): An MRI Instrument Development Proposal to NSF.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
E-MAS Cooled Optical Bench (COB) System Overview Nov. 15, 2010 Roy W. Esplin Mike Watson Dave McLain Monte Frandsen.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
Oct 17, 2001SALT PFIS Preliminary Design Review Optical Integration and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Optical.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
Spectrophotometer Prof.Dr. Moustafa M. Mohamed Vice Dean Faculty of Allied Medical Science Pharos University in Alexandria, EGYPT.
High Resolution Echelle Spectrograph for Chinese Weihai 1m Telescope. Leiwang, Yongtian Zhu, Zhongwen Hu Nanjing institute of Astronomical Optics Technology.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
Opto-Mechanics for SNAP at UM
The Prime Focus Imaging Spectrograph Design and Capabilities
13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report April.
Magellan Telescopes Instrumentation: A Critical Assessment of Current Status.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Binospec - Next Generation Optical Spectrograph for the MMT
Oct 24, 2006SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status On-telescope throughput analysis Ghost analysis Repair plan Status of other current.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
FourStar Status Eric Persson (OCIW) Presented By.
Magellan Planet Finder Spectrograph Jeff Crane (OCIW) Steve Shectman (OCIW) Paul Butler (DTM)
Apr 29, 2003SSWG1 Prime Focus Imaging Spectrograph Status Passed CDR- moving into fabrication phase Mechanism design complete: fabrication drawing packages.
CLAS12 Drift Chamber Prototyping
Oct 10, 2002SSWG1 Prime Focus Imaging Spectrograph Status Engineering Status Optics Mechanical Control System Management Budget Schedule.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
FIRE: Status update and Preliminary Commissioning Plan Rob Simcoe (A. Burgasser, M. Smith, R. Bernstein, B. Bigelow, J. Pipher, C. McMurtry, W. Forrest)
May 19, 2008SSWG #19 Göttingen1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair positive progress: –UV efficiency –Some (repair-caused)
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto.
LAUNCH X improvements. LAUNCH ©Auto Testing Division Content Sensor headProgrammeTarget dataClampsCabinetTurn table, Side slip.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
The 4th Annual Colorado Robot Challenge
WEAVE Spectrograph.
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Prime Focus Imaging Spectrograph Status
Jim Fast Pacific Northwest National Laboratory
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
WEAVE Spectrograph all-hands Summary
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Prime Focus Imaging Spectrograph Status
DES Blanco602 Opto-Mechanics
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Budget Budget Contingency/ Cost Risks Descope Options
Polarimetry: Waveplate Modulation; Calibration
Meeting 11 Polarimetry: Beamsplitter; data formats Ken Nordsieck
NEH - Status Stefan Moeller.
Introduction to Design
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized aluminum + bolts (like MIKE). –Fabrication drawings exist for grating and prism assemblies, first mechanical pieces are being fabricated in MIT shop. –All optics in hand, or to be delivered next month Have coating quotes from OCLI, ZC&R and hybrid Sol-gel curves from CCI. Have contacted DRC metrigraphics to procure an “electroformed” slitmask. Working through design of mounting CCD on Si0 2 meniscus –CCD repackaging on engineering grade e2V did not deliver same characteristics as before removing wire bonds. Ian has details We’ll go with standard stock packaging for commissioning. (~7% hit in eff.) –Converging on solutions to locate CCD mount on dewar window (Si0 2 ) –Have arrived at initial designs to run cold finger, and electronics while minimizing obscuration in the beam.

9/24/05MagE Update SAC meeting (Old collimator assembly) Calibration lamp system Slitviewing system Layout as of last SAC meeting

9/24/05MagE Update SAC meeting

9/24/05MagE Update SAC meeting Optional handles added to prism cells to aid removal

9/24/05MagE Update SAC meeting Slit viewer in instrument Note reliefs in mounting plate to clear optics and light path

9/24/05MagE Update SAC meeting Electroforming process by DRC, versus standard etching results. Nickel-Cobalt is the standard electroplated metal.

9/24/05MagE Update SAC meeting Front, center, and rear barrel assemblies. New recessed rear cover.

9/24/05MagE Update SAC meeting Latest CCD mount design

9/24/05MagE Update SAC meeting Double Pass Prism

9/24/05MagE Update SAC meeting Single-Pass Prism

9/24/05MagE Update SAC meeting From Brent Gross, Cleveland Crystals

9/24/05MagE Update SAC meeting

9/24/05MagE Update SAC meeting Developments with MagE Optics to be finished (with coatings) by end of ‘05 Cable wrap with Igus chain to be better integrated with Aux port rotator Electronics and control can be PLC driven, with only 110V and ethernet needed into MagE electronics box. Plan to complete spectrograph and send to Carnegie in Summer ‘06 Would be ready to ship to LCO at end of ‘06.