Open Question: Should Fermilab consider joining the effort on R&D for Accelerator based Transmutation of nuclear Waste (ATW) Paul Lebrun - FNAL ● Context.

Slides:



Advertisements
Similar presentations
The UK ADSR programme Roger Barlow FFAG08 Manchester, 4 th September 2008.
Advertisements

Seminar on ESS29 November Seminar on neutron research centre in the Øresund region (European Spallation Source) 29 November 2002.
Muon Coalescing 101 Chuck Ankenbrandt Chandra Bhat Milorad Popovic Fermilab NFMCC IIT March 14, 2006.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
Alex C. MUELLER Physics with a multi-MW proton source, CERN, Geneva, May Additional Installations for a Nuclear Physics Facility Alex C. MUELLER.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
ADSR systems and their contribution to our energy needs Roger Barlow DIUS visit Manchester, 16 th September 2008.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
How Accelerators can save the planet Roger Barlow Manchester Christmas Meeting January 5 th 2010 Monday, July 13, 2015Roger Barlow.
Project Workshops Results and Evaluation. General The Results section presents the results to demonstrate the performance of the proposed solution. It.
  e Conversion at Fermilab ? Steve Geer BNL-MECO Meeting January 2006.
 Benefits of Nuclear Energy  How Fission Works  Nuclear Power Plant Basics  Overview of Uranium Fuel Cycle  Energy Lifecycle of Nuclear Power  Generation.
Discussion. Help Needed for Splice Consolidation Opening and closing W (20 FTE’s) Repair, reinstall and tack PIM’s (2) Orbital machining of M sleeves.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Yacine Kadi Thorium Energy Conference 2013 Globe of Innovation, CERN, Switzerland October 31, 2013.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
, WP1 Meeting, RAL J. Pasternak Status and Recent Progress in the Muon FFAG Designs for the NF J. Pasternak, Imperial College, London / RAL STFC.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Nuclear Energy Options and Project-X Shekhar Mishra Fermilab Yousry Gohar ANL June 7 th 2010.
S.J. Brooks RAL, Chilton, OX11 0QX, UK Options for a Multi-GeV Ring Ramping field synchrotron provides fixed tunes and small.
Yuri Kamyshkov/ University of Tennessee Mini-Workshop, WU St. Louis, February 11, 2011.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Chair : - Mrs. Anne Laperrouze - Dr. Wolf Klinz - Mr. Jorgo Chatzimarkakis - Mr. Sarunas Birutis Speaker : Dr. Wolfram Westmeier W. Westmeier ALDE Nuclear.
PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach.
F Project X Overview Dave McGinnis October 12, 2007.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
Operations, Test facilities, CF&S Tom Himel SLAC.
KT McDonald MAP Front End Meeting March 3, Finalizing the C- and Hg-Target Configurations for 6.75-GeV Proton Beams Present studies are for a carbon.
An Integrated Intensity Frontier Strategy Steve Holmes & Bob Tschirhart LBNE Reconfiguration Workshop April 25, 2012.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
Proton Beam for PRISM Keith Gollwitzer Accelerator Division Fermilab 5 th Workshop Project X Physics – Muons November 8, 2010.
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Legal challenges in reviewing application for final disposal of spent fuel Tomas Löfgren.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
1. Free Will and Determinism Determinism: given a specified way things are at a time t, the way things go thereafter is fixed as a matter of natural law.
THE NUCLEAR ENERGY SURVEY : Nuray ÖZDEMİR Prepared by : Nuray ÖZDEMİR EDIRNE SULEYMAN DEMIREL SCIENCE HIGH SCHOOL APRIL 2009 EDIRNE / TURKEY The use of.
Prospect for an high energy factory at LNF P. Raimondi LNF Apr-10,2008.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS ORBIS TERRARVM RAL Front End Test Stand — Context David Findlay Accelerator Division ISIS Department Rutherford.
Report from the DOE ADS White Paper Working Group Eric Pitcher Los Alamos National Laboratory Stuart Henderson Fermilab.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
UK Neutrino Factory Conceptual Design
Study on IFMIF Beam-Target Interface
State of Nuclear Power Helsinki, 8 May 2009.
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Summary of session 5: Innovative Ideas and New R&D
XFEL Project (accelerator) Overview and recent developments
A Superconducting Proton/Electron Linac
Plutonium Reprocessing and Recycling
First meeting of the LIS section: Welcome to the new members!!
Presentation transcript:

Open Question: Should Fermilab consider joining the effort on R&D for Accelerator based Transmutation of nuclear Waste (ATW) Paul Lebrun - FNAL ● Context ● Technical aspects ● Area of common interests ● Thoughts... Long Range Planning meeting on non-particle physics & applied physics, November

Perhaps a bit preposterous to ask...but.. ● Big decisions on National – or even world-wide - energy policies is above my pay scale. Meanwhile, it is clear to me that the use of nuclear energy will surge again, here and abroad. Despite energy conservation measures, and renewable sources, our appetite for energy consumption is growing, world-wide. ● And building new reactors without addressing the following grave concerns is irresponsible : ● Safety concerns of the reactor complex (mostly done) ● Waste Disposal -> Waste burning (here we could come! ) ● Proliferation of Plutonium (to be solved politically) ● Ultimately, if we can build efficient accelerators, sub- critical Thorium-based reactors could mitigate the Pu proliferation problem, by burning existing stocks and what is produced in conventional reactors, or breeders.

A TW Machines? ● Cyclotrons ( early designs, they seems unlikely to work due to space charge and extraction loss ) ● SCRF-Linacs: prefered solution ● Must be very efficient!!(makes no sense to build a 10 MW accelerator requiring 1 GW reactor to power it !) ● And cheap ! Beam ? ~1 GeV, tens of MW, CW (prefered) Source: CEA, France None of this nasty stuff on site, please!!

Technical areas of common interest.. ● Superconducting Linacs! (e.g. A proton driver) ● Superconducting R.F. ● Energy Saver : efficient r.f. power sources and cryo-modules. ● Beam Halo mitigation measures ● Space Charge Simulation. ● Multi MW targets (or beam dump) ● Robotics for accelerators. ●...

Thoughts.. SNS and Los Alamos (LANL) are better equipped for this project than we are. True! For instance, there is also great overlap between the Tritium production facility (APT) and the ATW (very unfortunately). However, one could ask: is a weapon lab most suitable for developing a peaceful use of nuclear technology? As far as SNS is concerned, we need to collaborate with them - and we already are, I believe, - should the SCRF-Linac Proton Driver becomes a reality. While this is going on, can we afford to state to our congressman(s), who ultimately could promote Nuclear Energy, that we don't do anything useful on that front ? Claiming that we have nothing to do with ATW's, is in fact not quite true: as we proposed and possibly build the SCRF Proton Linac/driver, we are and will train a new generation of beam physicist familiar with this technology. We may not like this discussion, but can we really ignore it? And meanwhile, we might contribute to the construction of safe reactors for neutron and neutrino physics!

To know more... ● Abroad.. – – – The type of accelerator development presented at PAC03 TPAB047/TPAB047.pdf ● U.S. : – '99 ATW study : – The spekptical response..(May ) – Recent talk (Aug. 2003) : UR pdf