SYS System SYSDAILY NEW 03-16-2012 REVISED DESCRIPTION: Schid 1: Runs Monday. Schid 2: Runs Tuesday. Schid 3: Runs Wednesday. Schid 4: Runs Thursday. Schid.

Slides:



Advertisements
Similar presentations
Grade 2 Created by; Kim Smith
Advertisements

Year 10 ISA Controlled assessment Week starting March 4 th 2013.
Operation Research By Anitha Chandran Chitra.R Radha.R Sudhit Sethi.
Today Is Sunday By Dr Jean.
Ain't It A Shame 1-4 Aint it a shame to work on Sunday, Aint it a shame, (a working shame,) Aint it a shame to work on Sunday, Aint it a shame, (a working.
1 The seven days of the week. 2 Monday is our washing day. Scrub, scrub, scrub.
QUESTION 1 What day is it today? A) I’m Tuesday. B) I have Tuesday. C) Tuesday. D) It’s Tuesday.
The Months and The Seasons Prepared by Claudia Doria and Terra Myers.
2012 CALENDAR. JANUARY 2012 Sunday 日 Monday 月 Tuesday 火 Wednesday 水 Thursday 木 Friday 金 Saturday 土
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt CalendarTime.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAYSUNDAY WEEK WEEK WEEK WEEK WEEK CALENDAR PROJECT.
Flight Traveling By Emily. Surabaya – Auckland Departure time: Monday, September 29 th at 3:00 a.m. Length of flight: 9 hours and 16 minutes Auckland.
MAAC Presents... Yoga Explosion!. Types of Yoga  Anusara—focuses on alignment and form; use of props makes this type of yoga accessible to many  Ashtanga—dynamic.
ARISE Summer Institute UC Davis June 17-June 22, 2011.
Class Schedule Template SundayMondayTuesdayWednedayThursdayFridaySaturday 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 AM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM Title Classroom.
Days of the week instructions. Children can; Order the days of the week. Use sentence strips and activity cards to write sentences about what they do on.
(Tentative) Plan for Last Days of School. Friday 5/8 / Monday 5/11 Work on empathy final project Tuesday 5/12 / Wednesday 5/13 (MIN.) Work on empathy.
On Sundays, I work. On Mondays, I wash my car.
FND System FND801 - FND806 NEW REVISED DESCRIPTION: SCHID: 1, 2, 3, 4, 5, 7 (See FND802S) SCHID: 1 SCHID: 4, 5, 7 SCHID: 6 SCHID: SCHID: 2-6.
HORIZONT 1 XINFO ® The IT - Information System HORIZONT Software for Datacenters Garmischer Str. 8 D München Tel ++49(0)89 /
After School Schedule Ms. Lovin’s Class 1 st Semester.
Garside: SNC2D. The following schedule is for Period 2 Class:
Click the button to begin. 12:25 What time does this clock show? 5:00 4:00.
Calendar Review Math Review Lesson By: Mrs. Moody, FLE.
Lesson Identity: Class: Four Subject: English Lesson: 21 Lesson Unit: A, B and C Time: 50 minutes.
A Dog for Each Day Written by: Rosie Portera, M.S., CCC-SLP.
FRS System FRS600 - FRS810 NEW REVISED DESCRIPTION: SCHID: CALENDAR: FRS802 FRS (JCL) Runs on Request. SBTM = 1800 POSSIBLE OBSOLETION.
Non Leap YearLeap Year DateDay NumberMod 7Day NumberMod 7 13-Jan Feb Mar Apr May Jun Jul
By Monica Hilgemann Second Grade Teacher
HR System HRS615 NEW REVISED SCHID: 5, 10 CALENDAR: 5D DESCRIPTION: SCHID 5: Runs 2 wks prior to the last Friday (workday) in Dec. SCHID 10: Runs 2 wks.
PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.
HEP System HEPDLY NEW REVISED CALENDAR: PW SCHID: 1, 2, 3, 4, 5, 100 DESCRIPTION: SCHID 1: Runs every Monday except the 2DBP & DOP.
Got a reason Got a reason for living again, got a reason for laughing again got a reason for loving again, I‘ve got the love of God in my heart. No reason.
What's the next number? 10,20,30,40…10,20,30,40… 40,50,60,70…40,50,60,70… 35,45,55,65…35,45,55,65… 21,32,43,54…21,32,43,54… 100,90,80,70…100,90,80,70…
HF System HRF805 - HRF825 NEW REVISED SCHID: 1 CALENDAR: WD DESCRIPTION: SCHID: 1 CALENDAR: 5D Roll = N DESCRIPTION: SCHID: 1, 2 CALENDAR: 5D Roll = F.
DAYS, MONTHS, SEASONS Class 1B time…. DAYS OF THE WEEK ordine 1. Metti in ordine a b c d e f g.
 Teacher’s Presentations Assiut Governorate Aboutig Educational Directorate Bany S.Primary school.
RER System RERMONM NEW REVISED SCHID: 2, 3 CALENDAR: RR Roll = B DESCRIPTION: SCHID 2: Runs on Monday of the week of Fall Mass Registration*.
Class Time Modules for the Semester Calendar Additional Senate Discussion
TODAY IS MONDAY THE 16 th OF NOVEMBER 2015 ON MONDAY WE ARE WORKING WITH THE LAPTOP.
Expense Report Total Miles MONDAY 5 5 TUESDAY WEDNESDAY 6 6 THURSDAY FRIDAY SATURDAY 0 SUNDAY0 TOTAL 23.
PeriodTimeMinutes 3 rd Period8:00 – 8: rd Period8:45 – 10:1590 Break10:15 – 10: th Period10:30 – 11: th Period11:10 – 12:4090 PeriodTimeMinutes.
LM System LMFYEND NEW REVISED DESCRIPTION: SCHID 3: Runs the 1st calendar day in July. CALENDAR: 7D Roll = N SCHID: 3 LMFYEND LMS820 LMS821.
ADW System ADW820 - ADW821 NEW REVISED (JCL) DESCRIPTION: SCHID 2: Runs on the night before Payroll Calc for MARRG2 payroll. SCHID 4: Runs on.
NHS Meetings Calendar All Meetings are at 2:20pm unless otherwise stated This logo denotes a General Meeting. This means that ALL MEMBERS must.
FAF System FAFLDEVN NEW REVISED SCHID: 1,2,3,4,5,6 CALENDAR: 7D ROLL=D DESCRIPTION: FAFLDEVN FAF825 (/FINAID) /FINAID = Mutually.
The birthday calendar 2B : Unit 6 Days of the week Days of the week.
CC System CCIMOINV NEW REVISED CCIMOINV SCHID: CALENDAR: WD DESCRIPTION: SCHID 1 - Runs 1st working day of January. SCHID 2 - Runs 1st.
Happy Days by Charles Fox and Norman Gimbel PowerPoint by Camille Page.
The Calendar.
NEW REVISED CCBREORG CALENDAR: SCHID: 1 DESCRIPTION: AF/OPER submits job to CA-7 when DFHSM issues a ‘maintenance required’ message.
Daily Math Review September 2-6, Monday Solve the following problems with strategies and/or algorithms 5, = 9, = 3, =
REX System REXACTTY NEW REVISED REXACTTY (REX835) REX836A REX836B REX836C (JCL) SCHID 15, 16 SCHID 6,7,8,9 (REX836A) (REX836B) (REX835)
PA System PADAILY2 NEW REVISED SCHID: 30 CALENDAR: WD DESCRIPTION: Runs every working day. PAD830 (PAPR Application closed) PAD859.
THE PRESENT SIMPLE : For actions which occur regularly, habits, permanent situations and general truths.
My Plan to Go to Around the world By: Benedict/5C.
RSR System RSR803 - RSR804 NEW REVISED DESCRIPTION: DESCRIPTION: SCHID 15: Runs the second Tuesday following 10 th day for Fall. SCHID 16: Runs.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
HEP System HEPDAILY NEW REVISED SCHID: 1, 2, 3, 4, 5 CALENDAR: PM DESCRIPTION: HEPDAILY SCHID 1: Runs every Monday. SCHID 2: Runs every Tuesday. SCHID.
DM System DMC801 - DMC813 DMC801 (#JI) DMC NEW
( ) Parentheses=requirement or dependency
OBSOLETE 9/4/12 no longer needed (ERP)
NOTE: RCX880 has a conditional dependency of RCX844
( ) Parentheses=requirement or dependency
PRK System PRK800 - PRK802 PRK800 PRK801 PRK NEW
ALL JOBS OBSOLETE ON THIS PAGE
NOTE: THIS JOB MIRRORS THE SCHEDULE OF FAA815--
Presentation transcript:

SYS System SYSDAILY NEW REVISED DESCRIPTION: Schid 1: Runs Monday. Schid 2: Runs Tuesday. Schid 3: Runs Wednesday. Schid 4: Runs Thursday. Schid 5: Runs Friday. Schid 6: Runs Saturday. Schid 7: Runs Sunday. SCHID: SYS802 (SYS805) Schid=1 SBTM=1000 (USR RQMT: AFOPER WSUMVS1 SMF dump completed? AISDEVL SMF dump completed? DELENN SMF dump completed? SYSDAILY SYS801 (#JI cards) CALENDAR: 7D SYS803 EXEC=N 5/13/02 (ITB863) SYS805 (#JI cards) (USR RQMT: AFOPER WSUMVS1 DCOLLECT completed? AISDEVL DCOLLECT completed? DELENN DCOLLECT completed? SYS806 (#JI cards) SYS806V (#JI cards) SYS806D (#JI cards) Solid line = Trigger Dashed line = logical link ( ) Parentheses=requirement or dependency (? ) conditional dependency (/ ) negative dependency Flow Key One or more of the jobs below demanded in via a BTI step.

SYS System SYS801-SYS805 NEW REVISED DESCRIPTION: See SYSDAILY triggered by SYS801 DESCRIPTION: See SYSDAILY CALENDAR: SCHID: 1 SCHID: SCHID: 1-7 SCHID: CALENDAR: 7D CALENDAR: DESCRIPTION: DESCRIPTION: See SYS801 SCHID: CALENDAR: DESCRIPTION: DESCRIPTION: See SYSDAILY SCHID: CALENDAR: DESCRIPTION: SYS801 (#JI cards) SYS802 SYS804 Schid 1: Runs when the 1st day of the month is a Monday. Schid 2: Runs when the 1st day of the month is a Tuesday. Schid 3: Runs when the 1st day of the month is a Wednesday. Schid 4: Runs when the 1st day of the month is a Thursday. Schid 5: Runs when the 1st day of the month is a Friday. Schid 6: Runs when the 1st day of the month is a Saturday. Schid 7: Runs when the 1st day of the month is a Sunday. (SYS802) SCHID=1 (SYS801) (/ITB802) SYS803 (ITB863) (USR RQMT: AFOPER WSUMVS1 SMF dump completed? AISDEVL SMF dump completed? DELENN SMF dump completed? (SYS805) SYS805 (#JI cards) (USR RQMT: AFOPER WSUMVS1 DCOLLECT completed? AISDEVL DCOLLECT completed? DELENN DCOLLECT completed? EXEC=N 5/13/02 EXEC=N 4/24/07

SYS System SYS806-SYS808 NEW REVISED SCHID: 1-7 SCHID: 2 CALENDAR: 7D, ROLL = N CALENDAR: 7D, Roll = N DESCRIPTION: SCHID: 1 SCHID: CALENDAR: DESCRIPTION: See SYS805, demanded in via a BTI step. DESCRIPTION: SCHID: 3 SCHID: 2 CALENDAR: DESCRIPTION: See SYS805, demanded in via a BTI step. DESCRIPTION: See SYS805, demanded in via a BTI step SYS807 Schid 1: Runs when the 2 nd day of the month is a Monday. Schid 2: Runs when the 2 nd day of the month is a Tuesday. Schid 3: Runs when the 2 nd day of the month is a Wednesday. Schid 4: Runs when the 2 nd day of the month is a Thursday. Schid 5: Runs when the 2 nd day of the month is a Friday. Schid 6: Runs when the 2 nd day of the month is a Saturday. Schid 7: Runs when the 2 nd day of the month is a Sunday. SYS806 (#JI cards) SYS806V (#JI cards) SYS806D (#JI cards) (SY1) (SY2) DESCRIPTION: Runs the third calendar day of every month. SCHID: CALENDAR: DESCRIPTION: (#JI cards) SCHID: CALENDAR: DESCRIPTION: SYS808 (SYS807)