G. Tzanakos, MINERvA Collaboration Meeting, Jan 14, 2006 1 Goal: Build a Test Stand that can test and characterize 10 PMTs. Assumptions about MINERvA Electronics:

Slides:



Advertisements
Similar presentations
Antonin Vacheret DAPNIA/SPhN, CEA Saclay.HAPPEX II Jlab Hall A Electron detectors for HAPPEX2 and He Installation in HRS Linearity tests 4.
Advertisements

Compton integrating method Beam test summary PREX/Happex Collaboration Meeting Alexandre Camsonne.
Muon g-2 and SLAC Detector Test T-519 Momentu m Spin e David Hertzog University of Washington.
The Pierre-Auger PMT Test Stand Chris Jillings Feb 6, 2002.
M. Dracos LNGS, 03 August Target Tracker. M. Dracos LNGS, 03 August Rate tests SM1 Sensor (1,3,4) no signal Plane 6 absent Sensor (1,2,7)
1 Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter 06/23/2003 Kurt Francis - Northern Illinois University.
Mechanical check of PMT Check base: Remove black tape and two small screws that secure the base. Tighten the nuts on the BNC connector for the HT input.
9/72 PMTs 4 darkrate 4 linearity 1 unknown. 667 Slow to cooldown.
P. Karchin – PMTs for Scintillator Based Muon Systempage 11/7/2004 January 7, 2004 American Linear Collider Physics Group 2004 Workshop Stanford Linear.
1 Initial Tests of DHC Tower Update - 09/03/2003 Kurt Francis, Donna Kubik - Northern Illinois University.
Zurich PhD seminar, August Arno Gadola A new camera concept for Cherenkov telescopes.
Sep 13, 2007CALICE Collaboration Meeting Prague 1 Long term test of LED pulsing  Long LED system stability measurement  Aging of part of optical system.
Catania VLVnT09 Athens, Greece 1/14 Catania Performances of four super bialkali large area photomultipliers with respect to.
Leroy Nicolas, HESS Calibration results, 28 th ICRC Tsukuba Japan, August Calibration results of the first two H·E·S·S· telescopes Nicolas Leroy.
GLD Calorimeter Status Oct 学術創成会議 S. Uozumi Shinshu University FJPPL meeting held at the end of September. Preparation underway toward the ECAL.
K1.8 meeting Report from E05 group Toshiyuki Gogami 26 Dec 2014.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
1 System Description (2-4) Gains from single photo-electrons in vacuum at room temperature (5-8) Linearity Test at V in vacuum at room temperature.
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Performance of the H.E.S.S. cameras Pascal Vincent (LPNHE.
Experimental set-up Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE Multi-Channel MCP PMTs S.Korpar a,b, R.Dolenec.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
July 29, 2004 American Linear Collider Physics Group Victoria Linear Collider Workshop Muon Detector MAPMT Tests - Calibration R&D Scintillator Based Muon.
Yuri Velikzhanin NuTel TV meeting, June 13 (Friday), 2003 Status of electronics for NuTel prototype.
MPPC update including plastic connector T2K experiment collaboration meeting 2007/4/18 (Wed) S.Gomi T.Nakaya M.Yokoyama ( Kyoto University ) T.Nakadaira.
U. Akgun, HCAL Fall Meeting, 11/11/2004, Fermilab, IL HF PMT ISSUES By Ugur Akgun The University of Iowa.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
1 Status of the V0 electronics  Tests of photomultipliers  Signal treatment  Electronics  Milestones V0A V0C.
RENO PMT TEST  PMT type DAQ setup Single Photon Electron Resolution Dark Current After Pulse Ratio with two methods  Summary Kyung Ju Ma, Oct.
Abort Gap Monitoring Randy Thurman-Keup 6 / 8 / 2004 LARP Meeting.
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
1 A.Tsirigotus Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch The NESTOR O.M.
DOM Two Dimensional Scanning using testDAQ Hiroko Miyamoto T. Noda Faculty of Science Department of Physics Chiba University.
First Look at FLASH Thick Target Test Beam (Jan 2004) Results The Alumina Underground Jan. 13, 2004.
Design for Wide FOV Cherenkov telescope upgrading THE 2 nd WORKSHOP OF IHEP Shoushan Zhang Institute of High Energy Physics.
Production PMT Testing and Work on Site with Prototype Tank University of California, Los Angles Department of Physics and Astronomy
Linearity Tests The laser induced high noise pulses on the APD rendering it useless. We tried several methods to shield and filter the noise. With a stabilized.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA CMS HCAL at Fermilab Feb 6-8, 2003.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PMT Tests for HF Upgrade Ugur Akgun. HF PMT Proposed Tests On Every PMT: – Rise Time – Negative Pulse Width – Transit Time – Transit Time spread – Single.
PMT test device setup functionality –reproducibility of output signal –dynamic range –limitations –test duration conclusion T. Wälchli, TT-Meeting Brussels,
ECFA-DESY Prague NOV `02 Ivo Polak 1 APD-NOV02 APD + Preamplification.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
A. Tsirigotis Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Reconstruction, Background Rejection Tools.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA CMS Meeting, CERN, Dec 1-8,2001.
The photomultiplier tubes selection for KM2A electromagnetic particle detectors (EDs) hou chao IHEP The 2nd workshop of air shower detection at high altitudes.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
S-2S meeting Toshiyuki Gogami 15 Oct Contents TOF detector Kyoto University.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, MEG Collaboration meeting Feb. 10th, 2004.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, The University of Tokyo MEG VRVS meeting Jan. 20th, 2004.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
Performance of 1600-pixel MPPC for the GLD Calorimeter Readout Jan. 30(Tue.) Korea-Japan Joint Shinshu Univ. Takashi Maeda ( Univ. of Tsukuba)
The dynamic range extension system for the LHAASO-WCDA experiment
Light mixer proposal Arjan Heering, Anton Karneyeu
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Phototube response for a multi-element Optical Module
Prototype activities update
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
LNF - Beam Test Facility Sept. 29 – Oct. 04
Instrumentation for Colliding Beam Physics 2017
SiPM Readout ASIC LAPP Contribution
MEG II実験 液体キセノン検出器の建設状況
R&D of MPPC in kyoto M.taguchi.
Presentation transcript:

G. Tzanakos, MINERvA Collaboration Meeting, Jan 14, Goal: Build a Test Stand that can test and characterize 10 PMTs. Assumptions about MINERvA Electronics:  PMT Test Stand can be supported with 704 (=11 x 64) channels of ADCs  DAQ rate 500 Hz  Integration Time = 12  s George S. Tzanakos Physics Department, University of Athens, Greece

G. Tzanakos, MINERvA Collaboration Meeting, Jan 14, MINERvA Electronics (ADCs) Multiplexer 11 PMTs Stages-Filter Wheel Trigger Unit LED pulser Stage Controller HV controller TCP/IP SCSI bus signal cables HV cables special protocol VME bus

G. Tzanakos, MINERvA Collaboration Meeting, Jan 14, Diffuser from LED Top view of multiplexer 8x8 positions The same pixel in each PMT x,y,z stages 11 PMTs per batch 64 bundles of 11 fibers

G. Tzanakos, MINERvA Collaboration Meeting, Jan 14, DARK COUNTS: 1 sec  500 windows of 12  s  s of live time 1hr  21.6 s live time, For a DC rate of 250Hz  5400 DC total Assume a 0.5 hr collection  2700 counts total  42 counts/channel OPERATING HV 5 HV settings (-750, -800, -850, -900, -950 ), 64 positions, 5000 pulses/ position, 5 sec movement time, HV Settling  64pos x (5+5HVs x(5+5000/500)) = 1.42 hr  1.5 hrs (Oxford: 5 hrs)

G. Tzanakos, MINERvA Collaboration Meeting, Jan 14, Single pe Response, Gain uniformity, Linearity, Xtalk V0. 12 filters, 64 positions, light pulses per setting  64x(5+12x( /500)) = 5.4  5.5 hrs V1. 3 HVs, 12 filters, 64 positions, light pulses per setting  64x(5+3x(5+12x( /500))) = 16.4  16.5 hrs V2. 5 HVs, 12 filters, 64 positions, 5000 light pulses per setting  64x(5+5x(5+12x(5+5000/500))) = 16.5  16.5 hrs V3. 5 HVs, 8 filters, 64 positions, 5000 light pulses per setting  64x(5+5x(5+8x(5+5000/500))) = 11.2  11 hrs (Linearity) 64x( /500) = 0.44  0.5 hrs (Xtalk). Total = 11.5 hrs V4. 3 HVs, 8 filters, 64 positions, 5000 light pulses per setting  64x(5+3x(5+8x(5+5000/500))) = 6.8  7 hrs 64x( /500) = 0.44  0.5 hrs (Xtalk). Total = 7.5 hrs (Assumed: Settling time = 5 s for each: a)x-y-z pos b) filter c) HV )

G. Tzanakos, MINERvA Collaboration Meeting, Jan 14, ConditionLinearity Gain, SPE (hrs) Xtalk (N=10000) HV Setup (hrs) DARK Counts (hrs) Total (hrs) Grand Total NposNHVNFiltN Included Included Included Assume:  4 hrs preparation of new batch and processing of previous batch  4 hrs for PMT settling  1 cycle of testing (21 hrs)  1.5 hrs to repeat HV setup and verify gain stability Additional time = = 9.5 hrs  GRAND TOTAL =

G. Tzanakos, MINERvA Collaboration Meeting, Jan 14, Justification  HV: Setup HV for fixed gain  Dark Counts: verify smooth behaviour, see DC single pe pulse  Gain: Stability, pixel-to-pixel uniformity  Xtalk: Measure to use later in MC simulation of each PMT  Linearity vs HV: correct data for non-linearities