EAUC November 2015. LYIT Letterkenny Campus – 97 acres Killybegs Campus – 5 acres 3,200 Full Time Students 30,000 sq m Buildings.

Slides:



Advertisements
Similar presentations
Wood to Warmth – Biomass Fuels and Heat Energy Calculations
Advertisements

Energy Conservation Energy Management.
Presented by Tim Baldwin. Established by the Energy Act 2011 Loan scheme attached to energy bill. Governed by the consumer credit act Supervised by Independent.
Because youre worth it! VALUE FOR MONEY David Lloyd.
Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)
Economics and Social Benefits Eric Dodd HICEC Manager.
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR 100% INTEREST FREE ENERGY EFFICIENCY LOANS Interest Free Financing of Public.
It is essential that CSU lead by example and continue to address sustainability “ ”
Installation of New CHP system at the Old Aberdeen Campus.
Welcome to a world of expertise Renewable Heating Solutions Jamie Boyd Sales Manager - Renewables & Installed Heating Glen Dimplex Northern Ireland.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Insert logo here Effective Energy Management – Energy Mapping Seminar on Improving Environmental Performance and Reducing Costs in Business Paula Gallagher.
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
Anglia Woodfuels - a case study Euroforenet Conference Sustainable Forest Management and Wood Energy: Developing Local Co-operation between Private and.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
ISA April 23rd, Reducing Site Energy Costs with Combined Heat and Power Generation.
WOODFUEL FOR THE CONSTUCTION INDUSTRY Architects Point of View + Building Regulations.
Moor Heating Stephen Larkin The experience of having the first pellet boiler.
CODE Project WP3 – Modelling support for cogeneration across the EU27.
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR 100% INTEREST FREE ENERGY EFFICIENCY LOANS Interest Free Financing of Public.
Dunstanburgh Castle Hotel Energy use and Greenhouse gas emissions.
Carbon on the Farm - the CAFRE experience Nigel Moore Senior Renewable Energy Technologist.
Staff Induction-Environmental Awareness
Cogeneration.
1 Kevin Cope Imperial College London Head of Building Operations Carbon Management Plans - achievements, maintenance and the future.
Reducing energy waste Good for us, great for the environment.
Creating Energy-Efficient Data Centers
AIR QUALITY PLAN of REGIONE PIEMONTE abstract about heating of buildings Adriano Mussinatto REGIONE PIEMONTE DIREZIONE AMBIENTE Settore Risanamento Elettromagnetico,
Going Green: City of Phoenix Sustainability Update ACMA Winter Conference February 7, 2008 Carolyn F. Bristo Assistant Public Works Director City of Phoenix.
Glasgow’s enhanced SEAP STEP UP Riga Conference Thursday 20 th November 2014.
MUSEC-EIE/06/024/SI SUPPORTED BY POTENTIALITIES AND TARGETS OF THE LOCAL ENERGY PLAN Municipality of Asti - Italy.
The National Danish Energy Policy focus on waste and biomass Anders H Kristensen Danish Energy Agency.
1 Progress Toward Sustainability at Williams College.
Croft Castle Biomass From Harvest to Heat Chatsworth House - 8 th July 2015 Presented by Ed Wood.
1 Progress Toward Sustainability at Williams College.
Energy & Environment Report for 2008 – 2009 Ian Rowe Manager (Health, Safety & Environment)
A fresh approach to people, homes and communities Going Green, Saving Money and all that!
Low Carbon Buildings and Sustainability By Dr David Johnston – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike License
DST Output: the environment and the print industry Lucy Klinkenberg Environmental Manager DST Output.
By Paulina Kruse Solar Panel and the Volt Is this possible? Volt.
National Trust energy approaches. –
How to deliver a Renewable Energy Project Jemma Benson CO2Sense Yorkshire.
Managing Your Energy Costs Energy Webinar Series This Activity received funding from the Department of Climate Change and Energy Efficiency as part of.
March 30, 2010 Michael Kelleher SUNY College of Environmental Science and Forestry Energy Use, Renewable Energy and SUNY ESF Climate Action Plan.
14 July 2009 JOHN WHEATLEY COLLEGE EAST END CAMPUS.
Low Carbon Buildings and Sustainability By Dr David Johnston – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike License
Carbon Emissions and the Need for Improved Energy Efficiency.
Alastair Keir, Director of Operations 22 nd June 2007 Our mission is to work with the public sector to reduce carbon emissions through investment in energy.
Update on methodological work within UNFCCC and future outlook Workshop on CDM Methodologies and Technical Issues 3 rd December, 2005 Montreal, Canada.
Biomass Heating and the Renewable Heat Incentive.
Embedding Carbon Management within Public Sector Organisations 17 th November 2015.
Air Conditioner Efficiency. Air Conditioner Problem Suppose an older home in San Antonio is equipped with a central air-conditioning unit with SEER rating.
Chelmsford Cathedral case study Cathedrals and Climate Change 2 nd November 2009 Daniel Kenning CEng CEnv Principal Environmental Consultant Harrison Group.
By Iyus Rusmana. Cogeneration  Cogeneration, also known as Combined Heat and Power, or CHP, is the production of electricity and heat in one single process.
Lighting Efficiency. Lighting Efficiency Problem Suppose that 25 incandescent light bulbs rated at 100 Watt are replaced by 25 fluorescent lamps rated.
Sustainability Its our choice Presenters of this discussion topic Jon Howard Director of Estates (Sponsor) Shane O Donnell Maintenance Officer (Lead)
Energy Conservation Building Upgrades Alma School District.
NEW Energy Efficiency Funding Scheme. Cash for Kilowatts - Savings for YOUR Business Energia = Grant funding for your Energy Efficiency projects – FACT.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
David Kemp, P.E., PMP  Chief, Statewide Public Facilities Christopher Hodgin, P.E., C.E.M.  Program Manager, Energy Office P RESENTERS 02/03/2014Integrity.
Heat Plan Denmark Low Carbon Urban Heating Anders Dyrelund, market manager Rambøll Denmark.
Low Carbon Chilterns Cooperative Ltd Samantha Free 2 December 2015 COMMUNITY BULDINGS & ENERGY EFFICIENCY.
… TM Copyright © 2016 Spray Engineering Devices Limited SUGARCANE BASED BIOMASS POWER PLANT.
LONDON’S RESPONSE TO A CHANGING CLIMATE Barbara Riddell, Director of Resources, March 2009.
SETTING THE STANDARD: ENERGY MANAGEMENT for SUSTAINABLE ACTION PLANS
Multi-pipe Systems “An Opportunity To Combine Heating and Cooling”
EDENTON-CHOWAN SCHOOLS
Town Facilities Benchmarking and GHG Emissions Update
Establishing FE college emissions and potential targets
EDENTON-CHOWAN SCHOOLS
Presentation transcript:

EAUC November 2015

LYIT Letterkenny Campus – 97 acres Killybegs Campus – 5 acres 3,200 Full Time Students 30,000 sq m Buildings

Energy Use 2014 kWhCost €% Total Energy Gas (LPG)746,084€42,99713 Oil1,299,744€87, Electricity1,997,663€268, Total4,043,471€398,271100

2020 Target SEAI M&R 41.5% savings since baseline 2,046 kWh/FTE Student (TPER) Best performer public bodies and 3 rd level

Biomass Project – SEAI Exemplar Biomass District Heating Scheme. LESC contract - Design, Finance, Install, Commission, Operate including fuel supply. Campus wide except Sports/Multi-purpose building Ex. boilers 20 years old (5 x 575kW+2 x 332kW+2 x 190kW) in need of replacement + new gas 460kW condensing boiler (2012) retained as backup/peak demand. SRC Willow plantation established on 23 ac/9.5ha. = to expand to 50 ac./20ha. – potential to supply 45% of heat required pending willing LESC contractor. Harvest Project on hold pending RHI/Tax/Current low gas & oil prices

Feasibility Report Findings 1 LYIT Heat Load EnPI Fossil Fuel 67kWh/m 2 DEC C2 Benchmark non-res. University103kWh/m2. LYIT below good practice benchmark for type Heat Load not expected to change with project.

Feasibility Report Findings (2) New 450kW Biomass boiler Capital cost €455k System Lifetime 20 yrs Estimated Output 1,025,250kWh CO 2 savings 303 tonnes Total savings per year €47,000 fuel/172,297kWh boiler efficiency (assumes 4.5cent/kWh Biomass Heat Supply contract) Simple Payback 10 years

Waste Management Waste Recycling off campus – 90% Segregation on site - bottles, aluminium cans, batteries.

Sustainability Priorities & Objectives Achieve further Energy Savings, through: LED lighting Conversion oil to LPG Biomass & District Heating project Staff awareness and training Improved design of new buildings Fabric upgrade of existing buildings

Suggested Activities EAUC Information sharing Knowledge Benchmarking Increased sustainability profile