LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.

Slides:



Advertisements
Similar presentations
Software change management
Advertisements

Configuration Management
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
1 © 2006 by Smiths Group: Proprietary Data Smiths Group Online Performance Review Tool Training.
SE 555 Software Requirements & Specification Requirements Management.
CS Integration Management (Part 6) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent University,
Course Technology Chapter 3: Project Integration Management.
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Configuration Management
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
This chapter is extracted from Sommerville’s slides. Text book chapter
SE-02 CONFIGURATION MANAGEMENT Today we talk about Software Configuration Management (SCM for short): - What? - Why? - How?
Software Configuration Management (SCM)
Compliance Monitoring Audit Tutorial Version 1.0 April 2013.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
Software Engineering Modern Approaches
360 Panoramic Photographs Capture, Processing, Layout Database T. Birtwistle EN-MEF-DC.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Requirements Verification & Validation Requirements Engineering & Project Management.
Configuration Management (CM)
Creator: ACSession No: 16 Slide No: 1Reviewer: SS CSE300Advanced Software EngineeringFebruary 2006 (Software Quality) Configuration Management CSE300 Advanced.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
CERN Methodology document 1 Use of CERN CAD Exchange tool Process and rules for exchange of CAD files by using CERN CAD Exchange tool. Prepared by : B.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
© Mahindra Satyam 2009 Configuration Management QMS Training.
SOFTWARE CONFIGURATION MANAGEMENT. Change is inevitable when computer software is built. And change increases the level of confusion among software engineers.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Data Management Seminar, 8-11th July 2008, Hamburg 1 ICCS 2009 – On-line Data Collection in the Main Survey.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Topic 5 Initiating a project
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
1 Chapter 12 Configuration management This chapter is extracted from Sommerville’s slides. Text book chapter 29 1.
Configuration Management
Software Configuration Management SEII-Lecture 21
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
University Retention Schedule Training. Introduction to the University Retention Schedule.
EDMS for EGEE-IIEDMS No: ver 1 David Widegren, CERN, TS/CSE Using the CERN EDMS in the EGEE-II project.
Project Breakdown Structure Tracing changes to our different baselines I. Bejar Alonso and Project Office TCC – 14 th January 2016.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Project management Topic 8 Configuration Management.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
Database - How to keep BI information up to date? Samy Chemli on behalf of EN-MEF-DC.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
CACI Proprietary Information | Date 1 PD² v4.2 Increment 2 SR13 and FPDS Engine v3.5 Database Upgrade Name: Semarria Rosemond Title: Systems Analyst, Lead.
Software Configuration Management (SCM)
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
Software Configuration Management
Software Configuration Management
Software Project Configuration Management
Equipment simplified model SMR UR safety
Testing Process Roman Yagodka ISS Test Leader.
Configuration Management and Layout Database ELENA Project
Unifying for all accelerators and projects
Release Management Release Management.
ETS Working Group, 5-6th June 2012
Approach to Market Cutover - Draft for Discussion
TECHNOLOGY ASSESSMENT
Configuration Management
Chapter 3: Project Integration Management
PSS0 Configuration Management,
Presentation transcript:

LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC

Content Documentation Changes (EDMS) Handling Documentation Hardware Baseline Layout Database Engineering Change Requests (ECRs) T. Birtwistle EN-MEF-DC

Content Documentation Changes (EDMS) Handling Documentation Hardware Baseline Layout Database Engineering Change Requests (ECRs) T. Birtwistle EN-MEF-DC

Documentation Changes (EDMS) All document references will now use PSB, as these documents will be relevant to the machine in the future. Example: PSB-T-ES-0001 Existing files have dual references (PBU and PSB) to match existing file references, and for accurate EDMS searches. EDMS ‘release procedures’ reviewed and modified to match standard procedures for existing hardware baselines… T. Birtwistle EN-MEF-DC

Content Documentation Changes (EDMS) Handling Documentation Hardware Baseline Layout Database Engineering Change Requests (ECRs) T. Birtwistle EN-MEF-DC

Handling Documentation (1/3) As agreed with Bettina for this pilot project (PSB), Gian Piero Di Giovanni is the main point of contact for assistance with EDMS documentation. He can handle documents on your behalf… OR… Create a document in the appropriate EDMS node of the LIU-PSB Project Select the correct document type from the list T. Birtwistle EN-MEF-DC

Handling Documentation (2/3) 0.1 The first version should always be 0.1 (not the default value!) Future draft versions: 0.2, 0.3, 0.4 etc. First released version: 1.0 See A&T Seminar from P. Bonnal on 15 th May 2014 – Indico Select an appropriate equipment code. If a suitable code doesn’t exist, cancel the registration and contact: All equipment codes are stored herehere If you encounter any problems, please contact Gian-Piero or Thomas Birtwistle T. Birtwistle EN-MEF-DC

Handling Documentation (3/3) Access rights allow all project members to create documents. Project members can put documents through an ‘engineering check’ process. A decision is made as to whether a document is long term or not by Project Management. All long term documents (e.g. engineering specifications, reports etc.) must undergo a formal approval (‘under approval’) before ‘release’. The approval process is handled by a restricted group. First point of contact is Gian-Piero for this pilot project, then Configuration Management (EN-MEF-DC), or Cecile Noels. T. Birtwistle EN-MEF-DC

Content Documentation Changes (EDMS) Handling Documentation Hardware Baseline Layout Database Engineering Change Requests (ECRs) T. Birtwistle EN-MEF-DC

Hardware Baseline Organisation Long term ‘archive’ for documentation relevant to a machine. If an LIU document is considered ‘long term’ (i.e. it is still applicable after the project finishes), it will be stored in the appropriate LIU Hardware Baseline Node. When the project is completed, and the machine is updated: All LIU documentation in the LIU nodes will be copied to the operational machine Hardware Baseline. These nodes are the same T. Birtwistle EN-MEF-DC

Content Documentation Changes (EDMS) Handling Documentation Hardware Baseline Layout Database Engineering Change Requests (ECRs) T. Birtwistle EN-MEF-DC

Layout Database (LIU-PSB) The current machine and transfer lines are available in the layout database: A parallel study version for the future PSB and transfer lines (and also HL-LHC) is being developed (BE-CO), and will be available ~end November. Data entry is planned to be completed ~end January At the moment it is foreseen only to contain the main optics information in the future study version More detailed information could be added as the project develops. See next slide T. Birtwistle EN-MEF-DC

Layout Database Versioning Current machine versionDate2GeV ‘upgraded’ machine version Situation after the upgrade Post LS1 After Technical Stop 2014 LS2 Changes ECRs! Upgrade Complete Optics Changes Design Changes Project Changes Final change will come from only one side T. Birtwistle EN-MEF-DC

Content Documentation Changes (EDMS) Handling Documentation Hardware Baseline Layout Database Engineering Change Requests (ECRs) T. Birtwistle EN-MEF-DC

ECRs – Machine and Project Important tool to ensure that all changes are captured and the impact properly assessed in advance All changes to the machine (and project) that will impact the beam should be documented by ECRs Includes: powering, vacuum, re-naming… Templates are available on MS Word, ‘New’, ‘My Templates’, PS Complex tab (LIU and operational machine templates) Send to T. Birtwistle EN-MEF-DC

Large Changes (e.g. Injection Section) One ECR detailing the overall layout changes and describing what will be changed and why. It can reference existing documentation for the ‘sub-parts’ Integration study should be included and documented with a dedicated drawing. Written by whoever is managing the specific change (or by someone mandated on their behalf) – they should collect the required information from the concerned equipment groups. Circulated to the entire project team for review and comments collection (by Approval by the project leader prior to release and implementation. T. Birtwistle EN-MEF-DC

Conclusions T. Birtwistle EN-MEF-DC17 Pilot project for PSB, to ensure that information is captured and the machine correctly documented and represented. Part of the MEF-DC mandate. The points presented here are in line with other upgrades (e.g. HL-LHC). Dividing hardware baselines (operational and upgrade nodes). Parallel layout database machine versions. ECR scope (operational machine and project) Also in line with other operational machines. Configuration, layout and integration should remain consistent.

Thank you for your attention Questions? T. Birtwistle EN-MEF-DC