GIF++ Control System (GCS) 12.02.2014Gilles MAIRE PH-DT-DI1.

Slides:



Advertisements
Similar presentations
SESAME Radiation Safety and PSS Phase I : Microtron + Booster Morteza Mansouri on behalf of Safety group TAC SESAME TAC 2013 : Morteza Mansouri.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
EMS ROMC Environment monitoring system for ROMC..
André Augustinus 16 June 2003 DCS Workshop Safety.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
PLC DEVELOPMENTS FOR NEW VACUUM DEVICES IN THE LHC AND NA62
DP Cabinet.
 Wireless, Web-Based Monitoring System  Alarm/Event Notifications by Text Message and or  VPN Connection for Fast Response to Alarms and Events.
PH/DT MCP & MNO NEW MAGNET SAFETY SYSTEM HARDWARE Sylvain Ravat PH-DT Xavier Pons PH-DT.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
Engineer Training UV Electrical Cabinet (16 and above) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 16 and above)
David MacNair POWER SUPPLY 3/30/20061 Ethernet Power Supply Controller.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
André Augustinus 16 September 2002 Safety issues.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
Muon System Safety Issues Burkhard Schmidt.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
André Augustinus 9 October 2006 Interlocks update.
BA6 Cooling Towers Test Day Process Control Functionality and Performance Tests TCR – PCR Monitoring.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
October, 2009 Controls System Kevin Brown/Brian Oerter October, 2009 Internal Review.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Software development Control system of the new IGBT EE switch.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
60kW Thermosiphon control system
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts.
FPD SOFTWARE TEST MOTIONS / CONNECTIONS / CONFIGURATION / SOFTWARE / TESTS / CONCLUSION Lionel Peyrichoux 14 March 2001.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
External Data and DIP Oliver Holme 18 th January 2008.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
A discrete event system: the CMS Tracker interlock Icaleps 2005 Icaleps 2005 Andromachi Tsirou, CERN The CMS Tracker interlock system The CMS Tracker and.
1 Infrastructure and DCS Presentation of the Infrastructure Controls aspect in the ALICE DCS Based on U ser R equirements D ocument …you should still know.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 25/07/12 Project #4R. Fortin PH-DT-DI1 Status of procurement:
Hall B Gas System Controls Physics Detector Support Group.
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 1 / 10 Upgrading to a GIF++
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
NEW RMC Rack Multi Control.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Recent developments in the Vacuum Control Software
the CERN Electrical network protection system
MAUVE CO2 cooling review
Magnet Safety System for NA61/Shine
Development of built-in diagnostics in the RADE framework (EN2746)
Robert Gomez-Reino Garrido
Status of Fast Controller EPICS Supports for ITER Project
RF Local Protection System
Operation of Target Safety System (TSS)
Presentation transcript:

GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1

Goal of GCS Gilles MAIRE PH-DT-DI2  Give an overview of GIF++ (PVSS Application) SPS Beam Cosmic & Beam Trigger Gas Access Environment Sensors Ramses Rack Status Irradiator (Source & Filters) Radiation  Record all data  Produce Warning & Alarms

Gilles MAIRE PH-DT-DI3 GCS Architecture

Gilles MAIRE PH-DT-DI4 SPS Beam Information from SPS Beam by Software SPS Beam Status, ON or OFF SPS Beam Intensity SPS Beam Type

Gilles MAIRE PH-DT-DI5 Cosmic & Beam Trigger Information from Cosmic & Beam Trigger (Software by DIP) Cosmic & Beam Trigger Status, ON or OFF Cosmic & Beam Intensity Cosmic & Beam Trigger Type Detector on data taking Information to Cosmic & Beam Trigger (Hardware 6 DO) Interlock in case of Gas Fault

Gilles MAIRE PH-DT-DI6 Gas Information from Gas (Hardware 6 DI) Gas Fault Status Information from Gas (Software by DIP) Primary gases consumption Running System Circulation flows

Gilles MAIRE PH-DT-DI7 ACCESS Information from Access (Software by DIP) 3 doors status

Gilles MAIRE PH-DT-DI8 ENVIRONMENT Sensors Information from environment sensors by hardware (5 AI) 1 atmospheric pressure sensor 2 temperature sensors (inside & outside bunker) 2 humidity sensors (inside & outside bunker)

Gilles MAIRE PH-DT-DI9 RAMSES Information from RAMSES by software (DIP) 3 radiation sensors

Gilles MAIRE PH-DT-DI10 Rack Status Information from Rack Status by hardware Temperature Monitoring Interlock Reset

Gilles MAIRE PH-DT-DI11 NA62 Rack Status 3U chassis Equipment to be protected CAEN, WIENER Temperature Controller Interlocks Signals Free Contact

Gilles MAIRE PH-DT-DI12 SOURCE Information from source by hardware (8 DI) Access Veto 1 & 2 Status Start & Stop Status Ready Status Moving Status Fault Status Local Emergency Stop Status

Gilles MAIRE PH-DT-DI13 2 FILTERS Information from Filters by hardware (2 DI) Idle Status (set position = position) Information from Filters by software (TCPIP) Command (Attenuation Setting) Status (Encoders, End Switches, Local Remote Status)

Gilles MAIRE PH-DT-DI14 RADIATION Sensors Information from Radiation Sensors by software (RS485/Sub D9 connector) 8 radiation sensors

Gilles MAIRE PH-DT-DI15 cRIO from NI 16AI32DI32DORS485 5 Analog Input 16 Digital Input 12 Digital Output 8 Radiation Sensors Filter 1 Filter 2 Application NA62 Detector Safety System with PVSS supervisor MSS2 for the Magnet Safety (LHC Experiments, M1, Compass) TCPIP Technical Network TCPIP Local Network Real Time Controller FPGA on backplane

Gilles MAIRE PH-DT-DI16 Cost cRio & Redundant Power Supplies14kchf UPS for GCS & PLC Gas2kchf Distribution Power Supplies2kchf Computer4kchf PVSS License7kchf Cable3kchf FSU15kchf TOTAL47kchf 3U chassis1,5kchf per chassis