Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,

Slides:



Advertisements
Similar presentations
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Advertisements

NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Queue Reform at the Midwest ISO NARUC February, 2008.
1 Integrating Wind into the Transmission Grid Michael C Brower, PhD AWS Truewind LLC Albany, New York
Load Forecasting Eugene Feinberg Applied Math & Statistics Stony Brook University NSF workshop, November 3-4, 2003.
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Eastern Wind Integration and Transmission Study
Eastern Wind Integration and Transmission Study Overview January 28 th Webinar Dave Corbus National Wind Technology Center National Renewable Energy Lab.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Debra Lew NREL WestConnect Planning Meeting Western Wind and Solar Integration Study Update.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Approach to the Wind Resource Assessment for the Sixth Power Plan Northwest Power & Conservation Council Generating Resources Advisory Committee August.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
Transmission Planning at the California ISO September 10, 2015.
Debbie Lew (NREL) TEPPC MWG Feb 6, 2008 Western Wind and Solar Integration Study and Virtual Control Area Study.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
NWTC Wind Integration: What Have We Learned? Michael Milligan Consultant National Renewable Energy Laboratory Planning for Wind Workshop NW Power & Conservation.
Updated 1/28/2011.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Measurement & Verification at the Wholesale Market Level David Kathan FERC NAESB DSM/EE Business Practices Washington, DC April 11, 2007 The author’s views.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
Integrating Wind Energy Capabilities of Wind Power Plants Mark Ahlstrom Wind Energy: A Good Citizen of the Electric Grid Four Corners Wind Resource Center.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
Western Wind Integration Study May 23, Agenda 10:00am - Introductions 10:15 –Overview of study - NREL –Analysis to be conducted and examples of.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
INTEGRATING WIND ENERGY WITH ELECTRIC SYSTEMS ERIC HIRST Consultant in Electric-Industry Restructuring Bellingham, WA December.
ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015.
LOAD FORECASTING. - ELECTRICAL LOAD FORECASTING IS THE ESTIMATION FOR FUTURE LOAD BY AN INDUSTRY OR UTILITY COMPANY - IT HAS MANY APPLICATIONS INCLUDING.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
ATDM Analytical Methods for Urban Streets Urban Streets Subcommittee Meeting January 10, 2016 David Hale.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Minnesota Renewable Energy Integration and Transmission
Contents Introduction Focus area Wind scenarios
GENESYS Redevelopment Strawman Proposal
Status of the Planning Working Group’s (PWG) Efforts
Overview of Northwest Wind Integration Action Plan
Mid-Continent Area Power Pool
RE Grid Integration Study with India
Presentation transcript:

Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden, Colorado USA

Objectives of Eastern Wind Integration and Transmission Study (EWITS) Evaluate the power system impacts (operating due to variability and uncertainty of wind; transmission; reliability) associated with increasing wind capacity to 20% and 30% of retail electric energy sales in the Joint Coordinated System Plan region (MISO/PJM/SPP/TVA) by 2024; Build upon prior wind integration studies and related technical work; Coordinate with Joint Coordinated System Plan (JCSP) and current regional power system study work; Produce meaningful, broadly supported results through a technically rigorous, inclusive study process.

Key Issues & Questions include What are the benefits from long distance transmission that accesses multiple wind resources that are geographically diverse? What are the benefits from long distance transmission that move large quantities of remote wind energy to urban markets? What are the cost/benefits of remote wind resources that require transmission versus lower wind speed local wind resources? How much does geographical diversity help reduce system variability and uncertainty?

Key Issues & Questions include What additional system operational impacts and costs are imposed by wind generation variability and uncertainty? What is the role and value of wind forecasting? What benefit does balancing area cooperation or consolidation bring to wind variability and uncertainty management? How does wind generation capacity value affect reliability?

Wind Integration Methods & Best Practices Capture system characteristics and response through operational simulations and modeling; Capture wind deployment geographic diversity through synchronized weather simulation; Match wind output with actual historic utility load and load forecasts; Use actual large wind plant power statistical data for short-term regulation and ramping; Examine wind variation in combination with load variations.

Wind Integration Methods & Best Practices Cont. Utilize wind forecasting best practices and combine wind forecast error with load forecast error; Examine impacts of Balancing Area consolidation and fast markets.

Key Tasks- Eastern Wind Integration & Transmission Study Three main tasks 1)Mesoscale wind resource modeling and development of wind power plant outputs 2) Transmission Analysis (with JCSP) 3) Wind integration study

Key Tasks- Mesoscale wind resource modeling Develop high quality wind resource data sets for the wind integration study area (mesoscale modeling, 3 years)

Key Tasks- Eastern Wind Integration & Transmission Study Identify wind power generation sites for 20% & 30% wind energy scenarios –More than 300 GWs of total wind power data generated in time series for 3 years! –135 GWs for 20% energy and 200 GWs for 30% energy scenario

Key Tasks- Transmission Analysis Develop transmission plan (coordinated with JCSP) –Run hourly dispatch/market models

Joint Coordinated System Plan (JCSP) The 2007/2008 Joint Coordinated System plan will include MISO, PJM, SPP, and TVA The JCSP will perform a long term planning study incorporating both economic (2024) and reliability (2018) analysis of system performance for the combined four JCSP areas Collaboration with the parallel DOE Eastern Wind Integration & Transmission Study will provide underlying assumptions for generation scenarios Scheduled to be completed December 2008

Key Tasks- Eastern Wind Integration & Transmission Study Evaluate operating impacts and associated costs –Regulation –Load Following –Unit Commitment Evaluate reliability impacts (ELCC/LOLP)

Technical Review Committee (TRC) A TRC will be formed with regional and national technical experts on wind generation and power systems analysis to help guide and review the study The TRC will review and provide feedback on key assumptions, methods, and preliminary results It is anticipated that the TRC will meet quarterly throughout the study

Preliminary Schedule Nov 07 – Feb 08 Study Development and Stakeholder input January 2008 Award Wind Mesoscale Modeling Contract February 2008 Award Wind Integration Contract Jan – Oct 2008 Develop Wind Data Sets April – Dec 2008 Develop Transmission Plan in Coordination with JCSP Sept 08 – May 2009 Evaluate Operating & Reliability Impacts June 2009 Complete Study

Your Input is Important! Suggestions on questions to address in study or other comments/input –Study methodology, scope, scenarios, transmission analysis, operating impacts, Data for study (e.g., load and wind resource tall tower data) Contact Dave Corbus at ( ) or Matt Schuerger at ( )