Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.

Slides:



Advertisements
Similar presentations
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
Advertisements

Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Siena, Oct th Topical Seminar on Innovative Particle and Radiation Detectors: Progress in Radiation and Magnetic Field tests of CAEN HV and.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Recall: u target devices & possible solutions u Outstanding actions.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
February 24, 2003PDR on Muon Elx Services - A. Lanza1 MDT – TGC power supply system HV distribution Cabling and connectors Specifications for distributors.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
SA Ch High Voltage Module Main Features for each channel: V out = 12 kV I out = 1 mA R ipple = < 200 mVpp.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
18/6/03GS/ALICE Forum1 LVPS - Grounding Meeting of LVPS TF on Tuesday 17/6 Overview of TPC, TRD and TOF subsystem with F. Szoncso/TIS-GS Review of subsystems.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Colmar, 9-13 Sept. 2002LECC th Workshop on Electronics for LHC Experiments: Progress in Radiation and Magnetic Field tests of CAEN HV and LV boards.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Como, Oct 20017th Conf. on Advanced Technology and Particle Physics Radiation tolerance and magnetic field behavior of CAEN HV and LV boards for.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
LV-workshop during CMS Electronics week
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
ATLAS MDT HV – LV Detector Control System (DCS)
CAEN power supply group
Evaluation and testing of advanced low-voltage power supplies
RPC HV&LV systems Introduction Detector description Requirements
RPC HV&LV systems Introduction Detector description Requirements
Pierluigi Paolucci - I.N.F.N. Naples
Radiation- and Magnet field- Tolerant Power Supply System
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
RPC HV&LV systems Introduction Detector description Requirements
RPC Detector Control System
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem2 Summary Background / previous CAEN HV/LV activities Birth of the EASY System EASY specifications EASY modules EASY integration in DCS

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem3 Background CAEN’s Power Supplies R&D activities in the last 5 years: –SY1527/2527 family –OPC Server for the SY1527/2527 –SASY2000 for Radiation Tolerant and Magnetic Field solutions  tested working devices up to: 7 kGauss 1*10 11 p/cm 2 TD - 15 kRad TID 2*10 11 n/cm 2 TD Result: –existence of a series of building blocks for a new power supply concept

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem4 Birth of the EASY (I) Since 1996 CAEN has evaluated all preliminary requests from LHC experiments, in particular CMS The SASY2000 allowed to perform Radiation & Magnetic Field tolerance evaluation (functional prototypes approach)

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem5 Birth of the EASY (II) The LHC experiments need common solutions: –Reduce R&D costs (Hardware & Software) –Reduce Hardware/Software proliferation: Use of the same crates for all Sub-detectors Use of the same modules where possible Use of a Common Control System –Reduce Maintenance costs: Use of Common spare units CAEN proposes a “catalog” approach with a limited set of modules

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem6 EASY Main Features Full integration in SY1527/SY2527 (it appears as a single SY1527 board) 21 slots per crate 3 kW Maximum Output Power Magnetic field capability: 2 kGauss Expected rad.tol.:5*10 10 p/cm 2 TD 2*10 11 n/cm 2 TD 15 kRad TID

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem7 EASY LV Channel Features Per channel: –Independent ON/OFF –Vmon (Connector and Load) –Imon –Vset (Software or Hardware) –Programmable Trip –Sense wires –Status Signals Imax per module (Hardware)

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem8 EASY3000/EASY4000 Standalone EASY3000 EASY4000 Rack Mount Radiation & Magnetic Field

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem9 EASY3000/EASY4000 Standalone NO Magnetic Field EASY3000 EASY4000

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem10 EASY Modules

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem11 CMS Requirements

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem12 CMS Requirements

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem13 EASY Architecture + DCS CAN Bus based link Ad-hoc protocol Speed and reliability No interoperability issues Can work in hostile area

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem14 A1676 Branch Controller Single slot on SY1527/SY2527: –16 boards per SY1527 – 6 boards per SY2527 Up to 6 independent EASYs CANBus based bus protocol

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem15 EASY Channels Representation Channel 00 Channel 01 Channel 02 Channel 00 Channel 01 Channel 02 Channel 03 Channel 04 Channel 05 Channel 03 Channel 04 Channel 05 Channel 06 Channel 07 Channel 08 Channel 06 Channel 07 Channel 08 Channel 09 Channel 10 Channel 11 Channel 09 Channel 10 Channel 11 Channel 12 Channel 13 Channel 14 Channel 12 Channel 13 Channel 14 Channel 15 Channel 16 Channel 17 Channel 15 Channel 16 Channel 17 … Board 01 - Channel 000 Board 01 - Channel 001 Board 01 - Channel 002 Board 01 - Channel 003 Board 01 - Channel 004 Board 01 - Channel 005 Board 01 - Channel 006 Board 01 - Channel 007 Board 01 - Channel 008 Board 01 - Channel 009 Board 01 - Channel 010 Board 01 - Channel 011 Board 01 - Channel 012 Board 01 - Channel 013 Board 01 - Channel 014 Board 01 - Channel 015 Board 01 - Channel 016 Board 01 - Channel 017 … Board 01 - Channel 000 Board 01 - Channel 001 Board 01 - Channel 002 Board 01 - Channel 003 Board 01 - Channel 004 Board 01 - Channel 005 Board 01 - Channel 006 Board 01 - Channel 007 Board 01 - Channel 008 Board 01 - Channel 009 Board 01 - Channel 010 Board 01 - Channel 011 Board 01 - Channel 012 Board 01 - Channel 013 Board 01 - Channel 014 Board 01 - Channel 015 Board 01 - Channel 016 Board 01 - Channel 017 …

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem16 Full integration with the software developed for SY1527/SY2527: –OPC Server –Wrapper libraries (Linux/Win32) Full integration with the software developed for SY1527/SY2527: –OPC Server –Wrapper libraries (Linux/Win32) EASY Integration Controlled by SY1527/SY2527 power supplies

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem17 SY1527 (front view)

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem18 SY1527 (rear view) Branch Controller

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem19 SY2527 (front view)

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem20 SY2527 (rear view) Branch Controller

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem21 SY1527/SY2527 Modular and Expandable (2 versions) Flexible (catalog HV and LV boards, EASY3000/4000 I/F) Reliable Easy Firmware upgrading and Remote Maintenance Officially chosen by CMS ECAL for the APD PS

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem22 SY1527/SY2527 Connectivity

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem23 CAEN OPC Server Configuration System_0TCP/IPIP #a System_1 System_2 System_3 TCP/IP CAENET IP #b Crate #n Crate #m P.S. NameConn.Address Control and monitor all the CAEN HV Power Supplies Simple configuration

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem24 CAEN OPC Server Milestones Mar 99 CAEN delivers the 1° SY1527 to CERN Oct 99 CAEN and IT/CO start the collaboration May 00 Presentation of the CAEN OPC Server project to the JCOP Meeting Sep 00 OPC Server rel. 1.0 (SY1527 via TCP/IP) Nov 00 Permanent Test Bench (CAEN PS + OPC) at IT/CO Labs Sep 01 Integration of SY1527 into the JCOP Framework Jan 02 Presentation of the CAEN OPC Server rel. 2.0 new features Today 200 Downloads from CAEN web site (25% by CERN)

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem25 Hostile Area Experience Milestones Feb ‘97 First COTS rad- tolerance tests (ENEA - La Casaccia) Mar ‘98 NIC Non Inductive Converter May ‘99 Tests with p and n in Louvain-la-Neuve of A877 ( CMS Muon Chambers ) Apr 00 Start of Special material research Nov 01 New design (Patent Pending) for a family of High and Low voltage DC/DC converters May 02 SASY 2000 functional prototype Aug 02 SASY 2000 tested under Radiation in Louvain la Neuve Today EASY 3000/4000 Sept 02 SASY 2000 tested in Magnetic field in CERN

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem26 Last comments CAEN Employees: 116 (Production excluded) –R&D 45%, –Test & Maintenance 27%, –General services 21%, –Commercial 7% We are involved in several projects  priorities will be established on a “first come first serve” basis

Fifth CMS Electronics Week May 7, 2003EASY: a new SY1527-based Embedded Assembly SYstem27 Conclusions CAEN has completed all developments in Magnetic Field and Radiation Integration in DCS (OPC Server + SY1527) is well established and already in use The architectures of the EASY System and modules are completely defined  CAEN is ready to work with CMS to the final phase!