MOPS Spectrometer Dick Ferris 29/6/06 MOPS, the Mopra Spectrometer Dick Ferris ATNF 29/6/06.

Slides:



Advertisements
Similar presentations
Line Efficiency     Percentage Month Today’s Date
Advertisements

Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
ATCA and Mopra Phil Edwards. VSOP observations with ATCA 190 observations with Mopra.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - October 2009 Australia Telescope Users Committee Technologies.
NTD/xNTD Signal Processing Presented by: John Bunton Signal Processing team: Joseph Pathikulangara, Jayasri Joseph, Ludi de Souza and John Bunton Plus.
CABB update Philip Edwards Head of Science Operations 14 October 2010.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
The Correlators ( Spectrometers ) Mopra Induction - May 2005.
Omnisys There are a few different activities at Omnisys that may be of your interests. –New correlation spectrometer IC’s. –New FFT spectrometers –Future.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
Windows Server 2008 R2 Oct 2009 Windows Server 2003
Jan 2016 Solar Lunar Data.
IT Strategy Roadmap Template
Timeline Roadmap Template

LLRF Controls Outline Requirements External Interfaces Schedule Design
AFE IIt/VLSB Update Firmware Progress Hardware Progress AFE IIt VLSB
Q1 Jan Feb Mar ENTER TEXT HERE Notes

Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
Apr-Jun Jan-Mar Jul-Sep Oct-Dec
LLRF and Beam-based Longitudinal Feedback Readiness



Mammoth Caves National Park, Kentucky
2017 Jan Sun Mon Tue Wed Thu Fri Sat



Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Preparation for WRC-07 A Status Report
Free PPT Diagrams : ALLPPT.com


Step 3 Step 2 Step 1 Put your text here Put your text here
Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Sun Mon Tue Wed Thu Fri Sat

©G Dear 2008 – Not to be sold/Free to use
Electricity Cost and Use – FY 2016 and FY 2017
Correlator Growth Path

SC SC SC WS SC S HIS Background document Seminar document

Unemployment in Today’s Economy
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2

TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Change Management E2E Roadmap
Presentation transcript:

MOPS Spectrometer Dick Ferris 29/6/06 MOPS, the Mopra Spectrometer Dick Ferris ATNF 29/6/06

MOPS Spectrometer Dick Ferris 29/6/06 ~Dec 00 Initial Concept. Build by evolution. Mar 01 Design Study: 8-bit ADC, 2GHz, 2k channels Nov 02 Matlab/Simulink/System Generator installed Jun 03 AdvTCA backplane & chassis adopted Jan 04 POCS_64: 8-bit, 64MHz, 128 chans Jul 04 POCS_256: 8-bit and 2-bit, 256MHz, 1024 chans, on Mopra 22m ? 05 POCS_600: 2-bit, 600MHz, 1024 chans, on Mopra 22m Oct 05 MOPS Z2X: 2-bit, 2.2GHz input, two zoom bands, 138MHz*4096 chans each, AdvTCA card with 2Tbit data circulation May 06 MOPS FB1k: 2-bit, 4k channels across 8GHz Jun 06 MOPS Z4X: 2-bit, 16 zoom bands across 8GHz, each 138MHz*4096 channels MOPS is an Evolutionary Stage for CABB

MOPS Spectrometer Dick Ferris 29/6/ SUB-BAND 1SUB-BAND 3 SUB-BAND 2SUB-BAND MHZ 3036 MHZ 966 MHZ 2208 MHZ REFERENCE FREQUENCY SPECTROMETER BAND GLOBAL CHANNEL # ZOOM BANDS Hybrid Structure & Zoom Bands

MOPS Spectrometer Dick Ferris 29/6/06 8GHz Installation

MOPS Spectrometer Dick Ferris 29/6/06 Rear View of AdvTCA Module

MOPS Spectrometer Dick Ferris 29/6/06 –2 Bit Data –2 Polarizations –17 V2P30 FPGAs –1 Terabit per second of data capable of being transferred between chips –Over 300 Billion 18 bit MACs MOPS Board, One of Four

MOPS Spectrometer Dick Ferris 29/6/06 C 34 S CS Two Zoom Bands 1650MHz Apart (May 05)

MOPS Spectrometer Dick Ferris 29/6/06 MOPS : 81 to 89GHz in 4000 Channels

MOPS Spectrometer Dick Ferris 29/6/06 MOPS : 8 Zoom Bands between 85 and 93GHz

MOPS Spectrometer Dick Ferris 29/6/06 IRC : 74 to 82GHz

MOPS Spectrometer Dick Ferris 29/6/06 IRC : 81 to 89GHz

MOPS Spectrometer Dick Ferris 29/6/06 IRC : 87 to 95GHz

MOPS Spectrometer Dick Ferris 29/6/06 IRC : 93 to 101GHz

MOPS Spectrometer Dick Ferris 29/6/06 IRC : 99 to 107GHz

MOPS Spectrometer Dick Ferris 29/6/06 IRC : 105 to 113GHz

MOPS Spectrometer Dick Ferris 29/6/06 IRC : 110 to 118GHz

MOPS Spectrometer Dick Ferris 29/6/06