OUT OF GAME TESTING INFORMATION WHATS NEEDED INSTRUCTIONS EXAMPLES 750/850 THERMAL TICKET PRINTERS.

Slides:



Advertisements
Similar presentations
Presented by Datamax-O’Neil Technical Support
Advertisements

9.How To Upgrade Title Bar Status Bar 9-1.PC System Requirements
Tips on Running Departmental Ledgers. Tips on Running Departmental Ledgers for Expense Funds Please enter ZDEPT_LEDGER onto the command line. Press Enter.
Engineer Training XL1200 Electronics. Engineer Training XL1200 Electronics Confidential 2 XL1200 Electronics The XL Jet Electronic System consists of.
Introducing. designed specifically to meet basic receipt printing needs with high reliability for the harshest of environments. NEW Budget, High Performance,
Installation of Peripherals. I. Backup Battery.
1.6 Inside the system unit [Hardware]
How to Reprint a Registration Statement via Colleague Updated
Unit Test Calibration Training
Motherboard Further Information Click on the image for details about each component.
INPUT, OUTPUT, And STORAGE DEVICE
5/13/ Assembling and Testing Your Robot. 5/13/2015 Mounting the Topside Hardware  Parts Boe-Bot Chassis (1) Standoffs (4) 1/4” 4-40 Screws (4)
CASH DRAWER CONFIGURATION GUIDE. 1.PRINTER PORT connect the drawer at the back of the printer using RJ11 connector 2.SERIAL PORT connect the drawer at.
Final Exam Test Review Intro To Computers.
Students: Asulin Ofir Heller Itai Supervisor: Mony Orbach In association with: June 16, summer 2006.
VC707 Power Bus Reprogramming
Dr. Hoganson CSIS HC11 Demo Program This is our first lab using the 68HC11 microcontroller. We will “talk” to the microcontroller from a PC, run.
COMPUTER SYSTEM.
AC701 Power Bus Reprogramming © Copyright 2012 Xilinx.
TAX-AIDE Network Router Setup Network Printer Setups July SMT/TCS Training - Dallas1.
1 Why have we chosen to use the serial port, when it is more complicated and offers fewer connections than the printer port? For a beginners’ course using.
Silicon Labs ToolStick Development Platform
Serial Communication Lab 12 Module M21.1. Asynchronous Serial I/O ASCII code 54H = (“T”) sent with odd parity.
RemoteDrive. OVERVIEW OVERVIEW The RemoteDrive is a special software running on Windows TM and controlling the devices manufactured by Elettronica Santerno.
Macquarie Fields College of TAFE Version 2 – 13 March HARDWARE 2.
U81X0 Downloading Tool Manual 1 ( Version 1.2 ) FlashRW For U81X0 Version 4.0.0(Build #95V) February 2004 LG Electronics Inc.
Mercury G3 Service Tool Training Overview
CIS 103 — Applied Computer Technology Last Edited: September 17, 2010 by C.Herbert Wireless Home Networks.
NETWORKING PRACTICAL EXAMPLE. REQUIRED HARDWARE BASICS Network Interface Card Ethernet Cable Client Server.
Setting up the Ricoh C305 Press F5 to start the Presentation
(Tahlia and Mabel are SUPA!!!). CPU CPU mean central process unit A central process is the carries out the instructions to computer programming.
Ericsson-LG Enterprise Proprietary | | Page 1 Slide title 30 pt Text and bullet level 1 minimum 24 pt Bullets level 2-5 minimum 20 pt Do not.
Electronic Communication Understanding Serial Communications in Manufacturing.
SPEED EDITOR. 2/13 Always Surpassing Customers Expectations 1.Overview 2.LDK-Speed Editor with LAN 3.Major Features 4.File Menu 5.Connection 6.File Transfer.
Development of a microprocessor project with LPC2388 development board.
July 7/ SPC Tutorial 1 Washington WASHINGTON UNIVERSITY IN ST LOUIS A Smart Port Card Tutorial --- Distribution John DeHart Washington University.
0 If you have set-up the equipment and are unable to access your service, call 1(888)ONE-ATT0/1(888) or for
Engineering H193 - Team Project Gateway Engineering Education Coalition Lab 1P. 1Spring Quarter Introduction to Sensors Lab 1.
XP Browser and Basics COM111 Introduction to Computer Applications.
U81X0 Downloading Tool Manual 1 ( Version 2.0) FlashRW For U81X0 Version 4.0.0(Build #100V) April 2004 LG Electronics Inc.
Slot Tech Magazine’s TechFest 15
Learn how to scan 35mm photo slides and negatives Introduction : With the right equipment, it's easy to scan your 35mm photo slides and negatives to create.
Digital Literacy: Computer Basics
1 Pertemuan 2 Routers. Discussion Topics Introduction to WANs Router physical characteristics Router external connections Management port connections.
Ports and Connectors By Karina Hackett Overview: Ports are also known as sockets, and are located at the back of a system unit. Connectors are the parts.
1 Pertemuan 12 Cabeling WANs. Discussion Topics WAN physical layer WAN serial connections Routers and serial connections Routers and ISDN BRI connections.
How to download games from the internet to your computer Tim Blades FVP 12.
A+ Second Edition Genetic Computer School Lesson 13 Drivers, Applications, Printers, Scanners and Printing.
Computer Parts There are many parts that work together to make a computer work.
Do-more Technical Training Connecting C-more. Two easy ways: ▫C▫Create TAGs manually ……in C-more Programming ▫C▫Create TAGs automatically ……by importing.
NETWORK DESIGN.
ECE 3430 – Intro to Microcomputer Systems
Samsung Ex-link RS-232 Control
Samsung Ex-link RS-232 Control
Yeti 400 Reprogram SOP 5/1/2017, Yeti firmware rev. 2.0.
Samsung Ex-link RS-232 Control
Beckwith Tap changer with TapTalk
COMPUTER BASICS Computer essentials 7-8.
RC900 GPIB Comms Set-up, test, diagnose & repair the GPIB-488 comms on the ESS, Inc, RC900 controller 11/14/2018 © 2008 ESS, Inc.
SERVICING INFORMATION
AQT90 FLEX Service Training
Button/Switch.
Felix’s Technology Dictionary
How to make Parent Bookings
AC701 Power Bus Reprogramming
P-Series Power Meter Firmware Upgrade Process
Appliace Remote Control
Learning the Basics of Microsoft Word 2010 for Microsoft Windows
Shelly Cashman: Microsoft Windows 10
Modems in a POWERLOGIC System
Presentation transcript:

OUT OF GAME TESTING INFORMATION WHATS NEEDED INSTRUCTIONS EXAMPLES 750/850 THERMAL TICKET PRINTERS

Power Supply M Power Cord V 850 Adapter Adapter ITEMS NEEDED FOR OUT OF GAME OPERATION

Printer Self Test Procedure 750 TEST TICKET APPLY POWER TO THE PRINTER LOAD TICKET IN PRINTER PRESS and HOLD the TEST SW PRESS and HOLD the PAPER FEED SW RELEASE the TEST SW RELEASE the PAPER FEED SW TEST TICKET PRINTS 850 TEST TICKET PULL OUT THE INNER CHASSIS BLOCK THE INNER CHASSIS CLOSED SENSOR APPLY POWER TO THE PRINTER TICKET PRINTS OUT OF GAME TESTING PROCEDURES CONNECT POWER SUPPLY AND THE APPROPRIATE ADAPTER

SELF TEST TICKETS

TESTING PRINTER USING A PC ITEMS NEEDED POWER SUPPLY AND TEST HARNESS SERIAL NULL MODEM CABLE (9 pin female to 9 pin female) TEST PROGRAM FOR PC (PJTERM) (see instructions to download) DEMO TICKET FILE (M700.dmo) OUT OF GAME TESTING PROCEDURES

DOWNLOAD PJTERM PROGRAM PJTerminal

START PJTerm PROGRAM SETUP PORT OPEN PORT PJTERM PROGRAM

Select the DEMO file using Browse Click on send script The DEMO ticket will be sent to the printer Commands can be sent to the printer Enter command in command box Click Send Command button See the OEM manual for the command format SEND COMMAND PJTERM PROGRAM SEND SCRIPT

750/850 DEMO TEST TICKETS

750 ELECTRONIC BOARDS AND HARNESSES Controller Brd Test Adapter Connector Brd Sensor Optical Printer Thermal Harness Main Flex Cable Power Brd

850 ELECTRONIC BOARDS AND HARNESSES RM Paper Low Sensor RM Print Mech Complete E Controller PCB Ribbon Cable RS232C Interface PCB

MODEL 70 CUTTER PARTS